405
|
Sun Jul 3 09:56:47 2011 |
Damien Gallop | | | 27Al+1 from MWS Setup | A lot has happened since the last entry.
The source blinked out at some point. Cause
cited was a PE short. Actions were taken, |
    |
414
|
Tue Jul 19 17:02:44 2011 |
Damien Gallop | | | 27Al+1 from MCIS Setup | The DRAGON run finished this morning. Switchover
to 27Al+6 in progress now. |
|
294
|
Sat Jun 12 11:23:40 2010 |
Damien Gallop | | | 26Mg6+ to TUDA-II source setup | After EOB activities from 15N4+ run that
ended this morning, we have begun preparations
to switch over the ion sources. Turbos off |
|
295
|
Mon Jun 14 09:44:06 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | On Saturday we opened the MWS and set it
up for Mg operation. Everything went well.
We are using the pair of half-moon Mg metal |
|
296
|
Wed Jun 16 10:12:58 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam idle overnight. Beam is being used
as a pilot beam for this run. Source was
knocked off by a power |
|
297
|
Thu Jun 17 09:21:56 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | TUDA-II began taking beam around midnight
last night. Beam on FC6 for a good part of
the night. Steady as she goes. |
|
298
|
Mon Jun 21 09:20:30 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam waiting quietly on FC6. There was
a power
bump on Friday just after noon that tripped |
 |
299
|
Tue Jun 22 08:42:33 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam was redirected to TIGRESS yesterday.
RIB delivery to TIDA-II was rendered impossible
due to a failure in the target or module. |
|
347
|
Mon Oct 18 09:22:35 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | MWS is producing 26Mg, presently parked.
It was used over the weekend
for TUDA tuning. |
|
348
|
Tue Oct 19 09:20:40 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | MWS operating nicely. |
|
349
|
Wed Oct 20 11:30:32 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | MWS ran fine overnight. It was shut off
this morning to investigate bias sparking
issue, noted on FR#4894. The two MCIS turbopump |
  |
306
|
Tue Jul 6 08:57:33 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS EOB | Photo-finish for TIGRESS this morning,
apart from a cavity trip
at around 6:00 a.m.. The MWS is running very |
  |
354
|
Wed Oct 27 09:21:59 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS EOB | The experiment ran overnight, smoothly,
by the looks of it. Beam is on FC6 now, so
they're likely done. EOB studies on Mg beam |
16x |
305
|
Mon Jul 5 11:58:49 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | Beam was switched from 24Mg5+ to 26Mg6+
on Canada
Day. Also, the source blinked out on |
|
350
|
Thu Oct 21 11:46:14 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | The MWS was restarted yesterday, and a
26Mg beam re-established. ICR set up into
ISAC-II overnight, and tuning to TIGRESS |
|
351
|
Fri Oct 22 09:35:24 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | A 26Mg beam was handed over to TIGRESS
last evening. It is 26Mg6+ through ISAC-I
and further stripped to 26Mg10+ by the time |
|
352
|
Mon Oct 25 09:05:15 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | Smooth delivery (from OLIS point-of-view)
to TIGRESS over the weekend. An SCB RF amplifier
failed yesterday and was replaced. Tuning |
|
353
|
Tue Oct 26 09:19:39 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | The TIGRESS run was scheduled to end at
08:30, but has been extended for 24h. The
ICR reports that they are getting "good |
|
300
|
Wed Jun 23 09:17:34 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS setup | Mass change yesterday morning from 26Mg1+
to 24Mg1+ from the MWS. It was tough to get
stable beam from the source, and there are |
   |
301
|
Thu Jun 24 11:52:34 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS setup | Tuning into ISAC-II was done yesterday,
and continues today. The source was idle
overnight. There were a couple of magnesium |
|