233
Wed Mar 17 09:25:27 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
20Ne1+ set up from the MWS and handed over
to Sophia & Marco for accelerator recommissioning.
Strip to 5+ at M:5. First day of beam. Happy
232
Fri Mar 12 11:35:34 2010
Keerthi
Cusp water cooling
Cusp source water cooling (#4) interlick
does not work.
231
Fri Mar 12 11:33:09 2010
Keerthi
IOS:IG!
IOS:IG1 is faulty. Need to replac it during
next earliest window.
230
Thu Mar 11 23:02:18 2010
Keerthi
OLIS status after shutdown
Microwave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
229
Fri Feb 19 17:54:40 2010
Damien Gallop
OLIS Shutdown in progress
Partial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
228
Wed Feb 17 18:28:33 2010
Damien Gallop
OLIS Shutdown in progress
More materials prepared for optics refit.
227
Tue Feb 16 16:04:18 2010
Damien Gallop
OLIS Shutdown in progress
Preparations for rewiring the DB1/3 optics
have begun. Sgan gas manifold work is in
progress. Note: IOS:MP1 is scheduled for
226
Fri Feb 12 14:42:06 2010
Damien Gallop
OLIS Shutdown in progress
Supernanogan cart removed from Faraday
cage to dock today. Some beam safety tests
on FC6 in progress presently. FC3 was already
8x
225
Wed Feb 10 17:18:24 2010
Damien Gallop
OLIS Shutdown in progress
OLIS Shutdown has been in progress for
a week. IOS is vented, was swiped clean and
opened. DB3 was craned out, a precision job.
224
Wed Feb 3 16:30:02 2010
Damien Gallop
OLIS Shutdown began today
We prepared stuff last night. This morning
we vented IOS to argon, then swiped. Clean.
Lu and Ajit craned out DB3 for us. Nice job,
223
Tue Feb 2 10:06:41 2010
Damien Gallop
Supernanogan development wind-up
We ran 32S5+ overnight. Keerthi has been
working with the new surface source oven
for the last couple of weeks. His results
9x
222
Fri Jan 15 15:30:02 2010
keerthi
Supernanogan oven start up
Voltage
Current
MCIC:IG1
221
Thu Jan 14 09:57:05 2010
Damien Gallop
20Ne1+ beam from MWS for 8pi diagnosis
Beam is on for 8pi diagnosis by special
request.
We set up beam in IOS yesterday.
9x
220
Wed Jan 13 18:16:22 2010
Damien Gallop
OLIS development with MWS at 28keV
We will be delivering a 28keV beam to the
tuning boys tomorrow for further diagnosis
of the 8pi line. In anticipation, I restarted
6x
219
Mon Jan 11 17:46:31 2010
Damien Gallop
OLIS development for 4He2+ beam loose ends
OLIS was shut down over Christmas. We did
a "soft start" of the MWS last
Tuesday, after refurbishing and installation
218
Mon Jan 11 17:40:07 2010
Damien Gallop
Happy New Year!
Welcome to 2010. Shutdown is underway across
the site, while beam development is going
on at OLIS.
217
Thu Dec 24 10:13:00 2009
Damien Gallop
OLIS development 20Ne1+ from MWS
The MWS stayed up flawlessly overnight.
Beam grew from about 2µA to over 5µA
this morning. Was it the pre-conditioning
216
Wed Dec 23 11:09:37 2009
Damien Gallop
OLIS development
So... lots has happened.
* Supernanogan *
Heater components installed in plasma
7x
215
Mon Dec 21 10:22:33 2009
Damien Gallop
OLIS development for CUSP source - installation cont'd
Keerthi and Marco achieved visible 4He2+
through the RFQ on Friday (or so). Mass spec
attached. Development continues today.
214
Fri Dec 18 13:14:01 2009
Damien Gallop
OLIS development for CUSP source continued
Yesterday: Busy! Source filment changed
last night. Source pumped overnight. First
start this morning.
9x