Entry  Mon May 31 09:18:39 2010, Damien Gallop, , , 33S to DRAGON Picture_2.png

Delivery of 33S6+ to DRAGON continues. A couple of RF tweaks done over the weekend. Source gas canister pressure at -20"Hg. MCIS pressure at 7.3e-8 Torr. At this rate, we could deliver 33S until approximately forever.

Entry  Tue Jun 1 09:12:39 2010, Damien Gallop, , , 33S to DRAGON Picture_2.png

33S6+ delivery to DRAGON continues. Looks like there was an RF tweak overnight. Source gas canister still at ~-20"Hg. MCIS vacuum at 7.4e-8 Torr.

Entry  Wed Jun 2 09:19:04 2010, Damien Gallop, , , 33S to DRAGON 

33S6+ delivery to DRAGON continues. It is Maintenance Day for everybody else today. Source gas canister pressure = -20"Hg. MCIS pressure = 7.7e-8 Torr.

Entry  Thu Jun 3 09:29:11 2010, Damien Gallop, , , 33S to DRAGON Picture_1.png

33S6+ delivery to DRAGON continues until Saturday morning. All the signs are that beam is excellent. Source gas canister is still at ~-20"Hg, and MCIS vacuum is at 7.0e-8 Torr.

Entry  Fri Jun 4 09:30:48 2010, Damien Gallop, , , 33S to DRAGON Picture_2.png

Delivery of 33S6+ continues to DRAGON for the final day. Some online tuning of the line overnight. Source gas canister pressure remains at ~-20"Hg, and MCIS pressure is at 7.1e-8 Torr.

Entry  Tue May 25 22:02:41 2010, Keerthi Jayamanna, , , 33S spectrum 

33S spectrum is saved as 33S_spectrum.dat 

Entry  Wed Oct 19 09:53:27 2011, Damien Gallop, , , 33S from MCIS to HE Development Setup Picture_9.png

MCIS configured for 33S+6 yesterday afternoon. Beam grew nicely overnight. Beam development expected after source hand-off.

Entry  Tue Oct 4 10:37:38 2011, Damien Gallop, , , 33S from MCIS Source Development Setup Picture_24.pngPicture_25.png

Beam development with 116Sn+18 finished last evening around 21:00. Source was off overnight. 33S material loaded into MCIS oven. Source pumped overnight.

Later... source is lit. 33S+6 on FC6 and growing.

Entry  Wed Oct 5 10:11:28 2011, Damien Gallop, , , 33S from MCIS Source Development Picture_1.png

The source stayed up overnight. A little RF tweak, but 33S+6 beam still on FC6.

Later... IOS:MCOL3 slits calibration with beam in progress.

Entry  Fri Oct 9 16:33:45 2009, Keerthi, , , 33S development 

SO2 gas line is connected again. Leak hand valve is closed.

Intermediate section is pumping through source chamber.

CSB development is completed.

 

Entry  Mon May 24 22:42:51 2010, Keerthi Jayamanna, , , 33S development Picture_1.png

Tried to see the background before 33S installation. Found few problems: MCIS:YCB1 does not hold more than 58V.

Very difficult to transport the beam without YCB1. Need to find a solution. Open and fix it is not an option even though we have a ready spare. It will take two weeks to get the vacuum back.

------------------------------

Outgoing TIGRESS experiment was the occasion for another ISAC milestone, 8MeV/u through the SCC for the first time just around midnight last Friday, May 21st. This also represented the first 8MeV/u beam to an experiment. And we can proudly say that OLIS beam was used. TIGRESS run ended at 08:30 as scheduled. Attached is a trar graph of beam on FC6, snapped periodically throughout the run. As before, you can see a small daily variation likely related to temperature of NA-LCW. There were reports of HPL tests this past Thursday and Friday. Evidently no effect over here.

 

Entry  Tue May 25 11:58:02 2010, Keerthi Jayamanna, , , 33S dev 

after 24 hours background spectrum saved as "BackgroungNo33S003.dat"

RF Amplitude :7.767 , RFoutput power= 5W, Output power (dB)=36.4

Entry  Thu May 27 09:11:10 2010, Damien Gallop, , , 33S Development and Handover Picture_2.png

33S on FC6 overnight. Preparing to send beam to DRAGON now, and confirm isotope.

Source gas pressure gauge on canister = -20"Hg. MCIS pressure = 7.8e-8 Torr.

Entry  Wed May 26 18:16:10 2010, Damien Gallop, , , 33S Development grab.Cm6004.png

Some 3enA of beam on FC6 presently. Let it sit.

Entry  Tue May 25 00:19:18 2010, Keerthi Jayamanna, , , 33S 

 

Finally got something going. YCB1 short to the ground. YCB common plate connected to YCB1 power supply. We were lucky. Polarity was right. Ran the source with no 33S.
Saved file as “backgroundNo33S.dat” No optics set yet. SO2 connected not open yet. 33S 17% is in the oven, but not heated yet.
Entry  Tue May 25 11:28:00 2010, Keerthi Jayamanna, , , 33D dev 

after 24 hours background spectrum saved as "BackgroungNo33S002.dat"

RF Amplitude :1.553 , RFoutput power= 0, Output power (dB)=0  

Entry  Fri Jul 22 15:56:08 2011, Damien Gallop, , , 27Al+1 from MWS for DRAGON status Picture_7.png

There have been teething pains developing a good 27Al beam. The Supernanogan sputter source ate through aluminum rods like candy. The MWS worked for a while, but would not hold a sustained plasma. IOS was opened a couple of times to clean the MWS. It ran for a while today, then blinked out. Leak checking is in progress. But the source looks pretty tight from that point of view.

Update at 16:30: Bob has declared EOB for the 27Al run. Next up next week: 22Ne2+, from MCIS if bias will hold comfortably at 22kV.

Entry  Wed Jul 6 09:56:45 2011, Damien Gallop, , , 27Al+1 from MWS for DRAGON EOB 13x

DRAGON has been taking beam since approximately noon on Monday, and finished a little while ago. Feedback I have received is that beam intensity was lower than experimenters' ideal, but quality of the beam was very good. I will run an emittance scan shortly. Then next up: Mg setup.

Entry  Wed Jun 29 15:49:16 2011, Damien Gallop, , , 27Al+1 from MWS Setup grab.Q27242.png

Switchover from 58Ni+1/MCIS to 27Al+1/MWS began just after noon. MWS cleaned and fitted with aluminum liners. Pumping in progress. Good leakup curve. All electrostatics checked and operational. Source should be conditioned to at least 55kV at some point. Let it sit at 30kV overnight with 100W on MW.

Entry  Thu Jun 30 10:02:08 2011, Damien Gallop, , , 27Al+1 from MWS Setup Picture_2.pngPicture_3.pngPicture_4.pngPicture_5.png

Source pumped overnight to previous baseline (red trace on attached Stripchart). IOPS conditioned it up to 42kV without a hitch.

Close Ne source gas line and pump out flow controller... noticeable improvement.

Bias conditioned up to 50kV.

Bias conditioning at 58.5kV with MW at 600W. Raising the RF outgassed the plasma chamber for the first while then went quiet again.

Bias set to 55.08kV for 27Al+1 run. Source lit around 14:30.

15:30: IOS:FC3 = 1.9e-5 (no bias); IOS:FC6 = 9.3e-9. It's coffee time.

16:40: IOS:FC6 = 4.9e-9 (attached)) after settling and a few little tweaks. We're just about ready.

16:45: Hand it over to ICR.