OLIS Logbook General
  General, Page 15 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  283   Mon May 31 09:18:39 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ to DRAGON continues.
A couple of RF tweaks done over the weekend.
Source gas canister pressure at -20"Hg.
 Picture_2.png 
  284   Tue Jun 1 09:12:39 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. Looks
like there was an RF tweak overnight. Source
gas canister still at ~-20"Hg. MCIS
 Picture_2.png 
  285   Wed Jun 2 09:19:04 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. It
is Maintenance Day for everybody else today.
Source gas canister pressure = -20"Hg.
  
  286   Thu Jun 3 09:29:11 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues until
Saturday morning. All the signs are that
beam is excellent. Source gas canister is
 Picture_1.png 
  287   Fri Jun 4 09:30:48 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ continues to DRAGON for
the final day. Some online tuning of the
line overnight. Source gas canister pressure
 Picture_2.png 
  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum33S spectrum is saved as 33S_spectrum.dat    
  453   Wed Oct 19 09:53:27 2011 Damien Gallop  33S from MCIS to HE Development SetupMCIS configured for 33S+6 yesterday afternoon.
Beam grew nicely overnight. Beam development
expected after source hand-off.
 Picture_9.png 
  447   Tue Oct 4 10:37:38 2011 Damien Gallop  33S from MCIS Source Development SetupBeam development with 116Sn+18 finished
last evening around 21:00. Source was off
overnight. 33S material loaded into MCIS
 Picture_24.pngPicture_25.png 
  448   Wed Oct 5 10:11:28 2011 Damien Gallop  33S from MCIS Source DevelopmentThe source stayed up overnight. A little
RF tweak, but 33S+6 beam still on FC6.
Later... IOS:MCOL3 slits calibration
 Picture_1.png 
  155   Fri Oct 9 16:33:45 2009 Keerthi  33S developmentSO2 gas line is connected
again. Leak hand valve is closed.
  
  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S developmentTried to see the background before 33S
installation. Found few problems: MCIS:YCB1
 Picture_1.png 
  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S devafter 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
  
  281   Thu May 27 09:11:10 2010 Damien Gallop  33S Development and Handover33S on FC6 overnight. Preparing to send
beam to DRAGON
now, and confirm isotope.
 Picture_2.png 
  280   Wed May 26 18:16:10 2010 Damien Gallop  33S DevelopmentSome 3enA of beam on FC6 presently. Let
it sit.
 grab.Cm6004.png 
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S 
Finally
got something going. YCB1 short to the ground.
  
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D devafter 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
  
  416   Fri Jul 22 15:56:08 2011 Damien Gallop  27Al+1 from MWS for DRAGON statusThere have been teething pains developing
a good 27Al beam. The Supernanogan sputter
source ate through aluminum rods like candy.
 Picture_7.png 
  406   Wed Jul 6 09:56:45 2011 Damien Gallop  27Al+1 from MWS for DRAGON EOBDRAGON has been taking beam since approximately
noon on Monday, and finished a little while
ago. Feedback I have received is that beam
 13x 
  403   Wed Jun 29 15:49:16 2011 Damien Gallop  27Al+1 from MWS SetupSwitchover from 58Ni+1/MCIS to 27Al+1/MWS
began just after noon. MWS cleaned and fitted
with aluminum liners. Pumping in progress.
 grab.Q27242.png 
  404   Thu Jun 30 10:02:08 2011 Damien Gallop  27Al+1 from MWS SetupSource pumped overnight to previous baseline
(red trace on attached Stripchart). IOPS
conditioned it up to 42kV without a hitch.
 Picture_2.pngPicture_3.pngPicture_4.pngPicture_5.png 
ELOG V2.9.2-2455