283
Mon May 31 09:18:39 2010
Damien Gallop
33S to DRAGON
Delivery of 33S6+ to DRAGON continues.
A couple of RF tweaks done over the weekend.
Source gas canister pressure at -20"Hg.
284
Tue Jun 1 09:12:39 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues. Looks
like there was an RF tweak overnight. Source
gas canister still at ~-20"Hg. MCIS
285
Wed Jun 2 09:19:04 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues. It
is Maintenance Day for everybody else today.
Source gas canister pressure = -20"Hg.
286
Thu Jun 3 09:29:11 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues until
Saturday morning. All the signs are that
beam is excellent. Source gas canister is
287
Fri Jun 4 09:30:48 2010
Damien Gallop
33S to DRAGON
Delivery of 33S6+ continues to DRAGON for
the final day. Some online tuning of the
line overnight. Source gas canister pressure
279
Tue May 25 22:02:41 2010
Keerthi Jayamanna
33S spectrum
33S spectrum is saved as 33S_spectrum.dat
453
Wed Oct 19 09:53:27 2011
Damien Gallop
33S from MCIS to HE Development Setup
MCIS configured for 33S+6 yesterday afternoon.
Beam grew nicely overnight. Beam development
expected after source hand-off.
447
Tue Oct 4 10:37:38 2011
Damien Gallop
33S from MCIS Source Development Setup
Beam development with 116Sn+18 finished
last evening around 21:00. Source was off
overnight. 33S material loaded into MCIS
448
Wed Oct 5 10:11:28 2011
Damien Gallop
33S from MCIS Source Development
The source stayed up overnight. A little
RF tweak, but 33S+6 beam still on FC6.
Later... IOS:MCOL3 slits calibration
155
Fri Oct 9 16:33:45 2009
Keerthi
33S development
SO2 gas line is connected
again. Leak hand valve is closed.
275
Mon May 24 22:42:51 2010
Keerthi Jayamanna
33S development
Tried to see the background before 33S
installation. Found few problems: MCIS:YCB1
278
Tue May 25 11:58:02 2010
Keerthi Jayamanna
33S dev
after 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
281
Thu May 27 09:11:10 2010
Damien Gallop
33S Development and Handover
33S on FC6 overnight. Preparing to send
beam to DRAGON
now, and confirm isotope.
280
Wed May 26 18:16:10 2010
Damien Gallop
33S Development
Some 3enA of beam on FC6 presently. Let
it sit.
276
Tue May 25 00:19:18 2010
Keerthi Jayamanna
33S
Finally
got something going. YCB1 short to the ground.
277
Tue May 25 11:28:00 2010
Keerthi Jayamanna
33D dev
after 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
416
Fri Jul 22 15:56:08 2011
Damien Gallop
27Al+1 from MWS for DRAGON status
There have been teething pains developing
a good 27Al beam. The Supernanogan sputter
source ate through aluminum rods like candy.
406
Wed Jul 6 09:56:45 2011
Damien Gallop
27Al+1 from MWS for DRAGON EOB
DRAGON has been taking beam since approximately
noon on Monday, and finished a little while
ago. Feedback I have received is that beam
13x
403
Wed Jun 29 15:49:16 2011
Damien Gallop
27Al+1 from MWS Setup
Switchover from 58Ni+1/MCIS to 27Al+1/MWS
began just after noon. MWS cleaned and fitted
with aluminum liners. Pumping in progress.
404
Thu Jun 30 10:02:08 2011
Damien Gallop
27Al+1 from MWS Setup
Source pumped overnight to previous baseline
(red trace on attached Stripchart). IOPS
conditioned it up to 42kV without a hitch.