OLIS Logbook General
  General, Page 12 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beamRemoved titanium from the back plate and
clean the source.
But left the PE titanium insert since
  
  154   Thu Oct 8 09:39:52 2009 Damien Gallop  CSB Development with MCISFriedhelm and Marco have requested 20Ne2+
from the Supernanogan, and plan to bring
up the same from the CSB today. I am beginning
 MCIS_HV_Conditioning.png 
  78   Wed Jul 15 16:37:01 2009 Damien Gallop  Bias for IOS emittance rigGraham looked up the list of IOS bias assignments.
None was form the emittance rig. I quickly
tested the list in ILT, but nothing jumped
 grab.wu7505.pnggrab.Vo7510.pnggrab.le7613.pnggrab.TN7617.png 
  14   Wed Jun 10 17:49:40 2009 Damien GallopRoutineGeneralBeam to RFQWe handed over the beam to Sophia for testing
Rick's new tune. Although there are RF issues
at the RFQ presently, her feedback to the
  
  44   Mon Jul 6 10:57:08 2009 Damien GallopRoutineGeneralBeam stability versus temperature over weekendWe had 16O3+ on FC6 on Friday. An IOSIOC
reboot occurred mid-afternoon Friday unfortunately.
Operators restored beam at about 06:00 on
 Picture_4.png 
  132   Tue Sep 8 15:14:45 2009 Damien Gallop  Back from vacationI'm back from vacation. Physically, anyway.
Keerthi did comprehensive emittance scans
during Supernanogan Development over the
 magstab_off-on.pngmagstab_on_10-sep-2009.pngmagstab_on_14-sep-2009.png 
  395   Mon May 2 10:50:28 2011 Damien Gallop  Alkalis for DRAGON EOBDRAGON has been taking various species
of Na and Rb using the MWS. Run ended this
morning. Emittance scan of 23Na attached.
 7x 
  415   Wed Jul 20 01:37:46 2011 Keerthi Jayamanna  Al beam development: 
Supernanogan is tested for Al+6
beam production.
A 8nA of mass
  
  503   Tue Nov 18 08:56:23 2014 Brian MinatoOtherGeneralALGA UpdateThere has been no noticeable loss of communication
to the ALGA 50watt amplifier.  As a
test, the ethernet cable was removed for
  
  488   Thu Oct 23 10:52:21 2014 Brian MinatoRoutineGeneralALGA AmplifierThe ALGA amplifier and its signal generator
have been turned off at the request of Controls. 
They have had communication issues and are
  
  366   Tue Nov 23 10:31:27 2010 Damien Gallop  85Rb for TITANWe are back to running a Rb beam using
the MWS. The run started last Thursday, November
18th. The previous Rb run ended on Monday,
 Picture_3.png 
  367   Wed Nov 24 14:02:14 2010 Damien Gallop  85Rb for TITANLast day of 85Rb delivery. Save: 101124_1400_snapiostitan.
Next up: 12C2+ for SEBT commissioning. We
took a few minutes earlier
 Picture_5.pngPicture_6.pngPicture_7.png 
  360   Wed Nov 3 09:22:38 2010 Damien Gallop  85Rb for PolarizerYesterday we handed over a 85Rb beam to
ICR. It will be used for a LEBT run using
the Polarizer line. Beam stayed on FC6 overnight.
 Picture_2.pngPicture_1.png 
  361   Thu Nov 4 09:18:15 2010 Damien Gallop  85Rb for PolarizerSource ran nicely overnight. ICR team set
up a tune into the Polarizer line. Experiment
setup is scheduled to start tomorrow morning.
 Picture_1.png 
  362   Fri Nov 5 09:23:53 2010 Damien Gallop  85Rb for PolarizerBeam was used yesterday. Mostly idle overnight.
Looks like a plasma mode change happened
at around 19:00 yesterday. It happens. Or
 Picture_1.png 
  419   Mon Aug 15 10:19:18 2011 Damien Gallop  84Kr from MWS to TITANThe source was configured and switched
over on Friday. Some teething pains over
the weekend. Beam is on FC6 presently.
 Picture_18.pngPicture_17.png 
  19   Mon Jun 15 17:49:23 2009 Damien GallopRoutineGeneral84Kr charge states begunWe began looking at 84Kr this weekend.
Keerthi had 84Kr19+ on FC6 this morning,
which I was able to tweak up from ~300epA
  
  20   Tue Jun 16 12:10:17 2009 Damien GallopRoutineGeneral84Kr charge states begun


   
        
            
 grab.c14389.pnggrab.Q14911.pnggrab.T15712.pnggrab.F15724.png 
  375   Mon Dec 6 09:08:52 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentThe previous 12C2+ development run from
the Supernanogan ended Friday morning. Starting
Friday afternoon, the Supernanogan was prepared
 Picture_1.pngPicture_2.pngNoKr.pngWithKr.pngmass7point333.png 
  376   Tue Dec 7 08:57:26 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentDevelopment should continue today. Looks
like Supernanogan went through a plasma mode
change overnight and settled into a new mode.
 Picture_1.png 
ELOG V2.9.2-2455