OLIS Logbook
General
General, Page 11 of 26
Not logged in
List
|
Find
|
Select
|
Import
|
Login
|
Help
Full
| Summary |
Threaded
513 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
...
24
,
25
,
26
Next
ID
Date
Author
Type
Category
Subject
Text
381
Tue Dec 21 09:43:22 2010
Damien Gallop
In Memoriam... Mike McDonald
At 5:00 this morning, after a lengthy battle
with cancer, Mike passed from this life to
his eternal reward. He has left us a great
46
Tue Jul 7 15:43:19 2009
Damien Gallop
Routine
General
ISIS emittance rig tests this morning
Keerthi and I were front and centre doing
ISIS emittance rig testing this morning.
He ran it, and I tried to find ways to run
473
Mon Dec 17 14:08:52 2012
Keerthi Jayamanna
IRIS beam delivary is completed
IRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
174
Thu Oct 29 09:42:23 2009
Damien Gallop
IOSIOC work in progress
Yesterday there was an IOSIOC reboot for
a purpose. It was an opportunity to demonstrate
to Controls that IOSIOC reboots materially
391
Wed Mar 9 11:09:02 2011
Keerthi Jayamanna
IOS:SSW failed
IOS:SSW failed unexpectedly. No reason
found. Came back on easily.
231
Fri Mar 12 11:33:09 2010
Keerthi
IOS:IG!
IOS:IG1 is faulty. Need to replac it during
next earliest window.
384
Fri Feb 18 11:43:32 2011
Keerthi Jayamanna
IOS: EE Status
IOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
475
Wed Jan 22 10:34:58 2014
Raymond Dubé
IN-line 100K for IOS:YCB1A removed
Last January 17th 2014 we removed an in-line
resistor (100K 10W) from IOS:YCB1A because
we do not think that it is needed.
218
Mon Jan 11 17:40:07 2010
Damien Gallop
Happy New Year!
Welcome to 2010. Shutdown is underway across
the site, while beam development is going
on at OLIS.
474
Mon Dec 17 14:10:22 2012
Keerthi Jayamanna
Gas flow controller fault
Controls group may need some assistance
from OLIS group in order to trouble shoot
the problem.
27
Mon Jun 22 16:00:04 2009
Damien Gallop
Routine
General
Emittance thoughts and other matters
An emittance scan of the 16O7+ beam follows.
Also, a stripchart of the same beam on FC6
overnight. Keerthi did some studies over
7x
10
Mon Jun 8 09:31:39 2009
Damien Gallop
Routine
General
Emittance scan of 18O beam from MWS
The TIGRESS run ended this morning. Supernanogan
Development begins now for two weeks. Begin
an 18O1+ emittance scan and also take some
512
Wed Feb 22 21:46:27 2017
Keerthi Jayamanna
Elog is working now
Elog is now functioning. We can start entering
notes
29
Tue Jun 23 10:33:43 2009
Damien Gallop
Routine
General
Effects of RF on charge state
Today is the last day of this set of Supernanogan
Development. The source ran at 16KV overnight,
in anticipation of 16O2+ delivery later today.
386
Tue Feb 22 18:54:43 2011
Keerthi Jayamanna
EE and SSEE
Both EE and SSEE problems were solved.
They are working OK now.
232
Fri Mar 12 11:35:34 2010
Keerthi
Cusp water cooling
Cusp source water cooling (#4) interlick
does not work.
194
Thu Nov 26 06:22:58 2009
Keerthi Jayamanna
Cusp source
Arc power supply does not hold any voltage.
393
Tue Mar 29 15:32:08 2011
Damien Gallop
Controls and Panel MRO
Controls is working on an interlock issue.
Electrical panel MCC-X maintenance is planned
for tomorrow afternoon.
39
Tue Jun 30 17:39:13 2009
Damien Gallop
Routine
General
Compare 16O2+ beam from start of run to today
There seemed to be some small change to
the beam over the week of TACTIC running.
I would like to poke around a bit. The emittance
6x
24
Thu Jun 18 09:38:52 2009
Damien Gallop
Routine
General
Check Supernanogan beam after IOC reboot yesterday
As mentioned before, IOSIOC was rebooted
yesterday afternoon to unfreeze the emittance
rig panel. It cost us our tune, which unfortunately
15x
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
...
24
,
25
,
26
Next
ELOG V2.9.2-2455