OLIS Logbook General
  General, Page 11 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  381   Tue Dec 21 09:43:22 2010 Damien Gallop  In Memoriam... Mike McDonaldAt 5:00 this morning, after a lengthy battle
with cancer, Mike passed from this life to
his eternal reward. He has left us a great
 Mike1526.jpg 
  46   Tue Jul 7 15:43:19 2009 Damien GallopRoutineGeneralISIS emittance rig tests this morningKeerthi and I were front and centre doing
ISIS emittance rig testing this morning.
He ran it, and I tried to find ways to run
 Picture_11.pngPicture_12.png 
  473   Mon Dec 17 14:08:52 2012 Keerthi Jayamanna  IRIS beam delivary is completedIRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
  
  174   Thu Oct 29 09:42:23 2009 Damien Gallop  IOSIOC work in progressYesterday there was an IOSIOC reboot for
a purpose. It was an opportunity to demonstrate
to Controls that IOSIOC reboots materially
  
  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failedIOS:SSW failed unexpectedly. No reason
found. Came back on easily.
  
  231   Fri Mar 12 11:33:09 2010 Keerthi  IOS:IG!IOS:IG1 is faulty. Need to replac it during
next earliest window.
  
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE StatusIOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
  
  475   Wed Jan 22 10:34:58 2014 Raymond Dubé  IN-line 100K for IOS:YCB1A removedLast January 17th 2014 we removed an in-line
resistor (100K 10W) from IOS:YCB1A because
we do not think that it is needed.
  
  218   Mon Jan 11 17:40:07 2010 Damien Gallop  Happy New Year!Welcome to 2010. Shutdown is underway across
the site, while beam development is going
on at OLIS.
  
  474   Mon Dec 17 14:10:22 2012 Keerthi Jayamanna  Gas flow controller faultControls group may need some assistance
from OLIS group in order to trouble shoot
the problem.
  
  27   Mon Jun 22 16:00:04 2009 Damien GallopRoutineGeneralEmittance thoughts and other mattersAn emittance scan of the 16O7+ beam follows.
Also, a stripchart of the same beam on FC6
overnight. Keerthi did some studies over
 7x 
  10   Mon Jun 8 09:31:39 2009 Damien GallopRoutineGeneralEmittance scan of 18O beam from MWSThe TIGRESS run ended this morning. Supernanogan
Development begins now for two weeks. Begin
an 18O1+ emittance scan and also take some
  
  512   Wed Feb 22 21:46:27 2017 Keerthi Jayamanna  Elog is working nowElog is now functioning. We can start entering
notes
  
  29   Tue Jun 23 10:33:43 2009 Damien GallopRoutineGeneralEffects of RF on charge stateToday is the last day of this set of Supernanogan
Development. The source ran at 16KV overnight,
in anticipation of 16O2+ delivery later today.
 grab.aS7166.pnggrab.WZ7540.pnggrab.Ku7550.pnggrab.Pv7570.png 
  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEEBoth EE and SSEE problems were solved.
They are working OK now.
  
  232   Fri Mar 12 11:35:34 2010 Keerthi  Cusp water coolingCusp source water cooling (#4)  interlick
does not work.
  
  194   Thu Nov 26 06:22:58 2009 Keerthi Jayamanna  Cusp sourceArc power supply does not hold any voltage.   
  393   Tue Mar 29 15:32:08 2011 Damien Gallop  Controls and Panel MROControls is working on an interlock issue.
Electrical panel MCC-X maintenance is planned
for tomorrow afternoon.
  
  39   Tue Jun 30 17:39:13 2009 Damien GallopRoutineGeneralCompare 16O2+ beam from start of run to todayThere seemed to be some small change to
the beam over the week of TACTIC running.
I would like to poke around a bit. The emittance
 6x 
  24   Thu Jun 18 09:38:52 2009 Damien GallopRoutineGeneralCheck Supernanogan beam after IOC reboot yesterdayAs mentioned before, IOSIOC was rebooted
yesterday afternoon to unfreeze the emittance
rig panel. It cost us our tune, which unfortunately
 15x 
ELOG V2.9.2-2455