M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 5 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Operational Modedown Subject Text Attachments
  38   Thu Jul 29 09:01:11 2004 Doug PreddyQuench Recoveryswitched to parallel coldChanged to series mode.   
  39   Thu Jul 29 13:25:29 2004 Doug PreddyQuench Recoverystart flow to power leads    
  40   Sat Aug 7 22:37:04 2004 Willy AnderssonQuench RecoveryCompressor tripped off.Got a call at about 10:00 this morning, the
whole system had tripped off. 
No power bumps or other disturbances. When
  
  41   Sat Aug 7 23:40:47 2004 Willy AnderssonQuench RecoveryEnergizing solenoid23:39 Powerleads cold, LHe level over 40%
and rising. Energizing solenoid 
to 500 Amps, ramp rate 60. Checking compressor
  
  47   Thu Sep 2 21:58:34 2004 Willy AnderssonQuench RecoverySwitch to series coolingSolenoid had tripped on powerlead overtemp
at about 09:00 this morning. 
Doug recovered the system to // cooling.
  
  48   Fri Sep 3 01:28:43 2004 Doug PreddyQuench Recoverypower upstarted flow to the power leads at 11:30.
Cold and stable at 1:00am. 
Energized solenoid at 1:30.
  
  78   Tue Nov 23 07:47:00 2004 Doug PreddyQuench RecoverySolenoid quench Nov 21Solenoid quenched Nov 21 due to alarge power
bump. Everything tripped off 
including vacuum and water pumps. Cold box
 11_22_04_7_40.BMP 
  79   Tue Nov 23 09:30:15 2004 Doug PreddyQuench Recoverystarted flow to solenoidStarted flow to solenoid in parallel warm
return.
  
  80   Tue Nov 23 11:35:44 2004 Doug PreddyQuench RecoveryAnother power bumpCompressor tripped off again due to a power
bump. Meson hall water off, so 
vacuum pumps off again.
  
  81   Tue Nov 23 15:10:06 2004 Doug PreddyQuench Recoveryswitched to parallel cold return mode    
  84   Wed Nov 24 14:58:42 2004 Doug PreddyQuench RecoverytodayCame in this morning to find the helium return
line to the buffer tank 
frosted up. MV51 has been stuck open the
  
  85   Thu Nov 25 07:21:37 2004 Doug PreddyQuench Recoverystarted power lead flowCurtis switched to series mode last night
at 7:00.
Startedflow to power leads at 7:00 this morning.
  
  86   Sun Nov 28 10:15:18 2004 Willy AnderssonQuench RecoveryPowerlead quench ?Got page very early this morning. Couldn't
come in til 08:30. System was 
in idle running mode and someone had reset
  
  95   Wed Jun 1 23:48:02 2005 Doug PreddyQuench Recoverythe first quenchI recieved a call from ops at 22:00 tonight
that the solenoid had alarmed. 
I came in and found a cold box fault, with
  
  96   Thu Jun 2 01:26:30 2005 Doug PreddyQuench Recoverystarted flow to solenoidSee attached file for a screen grab of temps.  Capture6-2-05-1.13.33 AM.jpg 
  97   Thu Jun 2 01:38:25 2005 Doug PreddyQuench Recoverystrip tool plotThis is a strip tool  plot of the cooldown  02-06-05-12.57.26 AM.jpg 
  98   Thu Jun 2 09:16:40 2005 Doug PreddyQuench Recoverycontinuing to coolSee screen grab  02-06-05-7.32.49 AM.jpg 
  100   Thu Jun 9 08:56:10 2005 Doug PreddyQuench Recoverysystem back onThe compressor was restarted and the solenoid
is cooling (sort of) in 
parallel cold return.
  
  101   Thu Jun 9 21:41:25 2005 Willy AnderssonQuench RecoveryTrying to achieve stable cooling.From about 08:00 to 15:00

See Doug's previous entry for quench recovery
  
  103   Tue Jun 14 20:53:19 2005 Doug PreddyQuench Recoveryrestarted refrigerator after power bumpsee bitmap for temps/pressures after presurrizing
coldbox. Preparing to 
start flow to turbines, then will start flow
 june142045.BMP 
ELOG V2.9.2-2455