M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 4 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Operational Mode Subject
  102   Tue Jun 14 18:48:14 2005 ExperimentorNormal RunningPower bump at 18:40
Solenoid tripped on a power bump at 18:40 Tuesday
-- Donald Arseneau
  147   Sat Jul 22 06:34:14 2006 ExperimentorQuench Recoverylooking good
Donald Arseneau reporting.

It is looking pretty good, so I came back in with the intent of energizing 
the magnet.  Doug should be up now or soon, so I'll wait a little for you 
to see this.  If you do, call the m9 counting room 222-7379.  After waiting 
a while, I will just forge ahead.
  169   Fri Oct 13 00:13:57 2006 ExperimentorQuench RecoveryEnergized solenoid.
Hi there,

This is Khashayar (experimenter). Lookin at all different temperatures and 
levelson the monitor, it seems everything is stable now. I wonder if you 
could let us know what time we can have beam again? Would you please send an 
email to kghandi@mta.ca if you know the answer? You can also reach me at my 
cell# (506)961-0802 any time.

Thanks

Khashayar

> Switched to series mode about 6 hours ago. Cooling continued including 
> power leads until LHe level at about 50% and powerleads appeared stable.
  1   Fri Dec 19 11:34:10 2003 Doug PreddyQuench RecoveryFinal home of this E-log
http://isac.triumf.ca/m9sol/
Chris has set up the M9 solenoid e-log at the above web address. Play with 
it and let me know if it breaks. 
  3   Fri Dec 19 13:59:53 2003 Doug PreddyMaintenanceTo-Do list for M9SOL
> I had distributed this list by email earlier this month. I have added
> a few items at the bottom. I am posting it on the M9SOL Elog under
> Maintenance. Some of the items may not be achievable or practical but
> I thought it would be a useful first attempt at a To-Do list.

A couple of other things to add:
Rebuild cooling water circulation pump with new seals and bearings.
Add air bleeds to the copper nonactive water lines.
Doug
  4   Fri Apr 16 10:15:26 2004 Doug PreddyStart UpChanges to M9sol Vacuum PC
Yesterday and today there have been a number of changes made to the M9 
Vacuum control computer. The computer now automatically boots up to the 
Epics control page. This logbook is also automatically started.
  5   Mon Apr 19 15:06:49 2004 Doug PreddyStart UpStarted turbines
Purifier run over the weekend. Both LN2 dewars empty, but purifier cold. 
Disabled CV211 and flowed all charge gas through purifier. Started turbine 
at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out 
beamline between BV% and BV7. Opened BV6.
Attachment 1: april191500.BMP
  6   Tue Apr 20 07:06:41 2004 Doug PreddyStart Upmorning day 2
Temps in solenoid are equalling out. Increasing PIC229 to 11 bar. 
Attachment 1: april200705.BMP
  7   Tue Apr 20 07:33:03 2004 Doug PreddyStart UpPIC229 at 11bar
PIC229 at 11 bar. Changed strip tool to 15 sec increments.
  8   Wed Apr 21 06:39:17 2004 Doug PreddyStart Upover night
Changed to parallel cold mode at 9:30.
At about 4:30 the city water chiller was turned on. The air compressor had 
also tripped off. It was reset and restarted.
  9   Wed Apr 21 06:48:31 2004 Doug PreddyStart UpJT bypass closed
Closed cv155
  10   Wed Apr 21 08:16:18 2004 Doug PreddyStart Upswitch to series mode
Switched to series mode.
  12   Thu Apr 22 10:39:16 2004 Doug PreddyNormal RunningYesterday
Added two bottles of UHP helium to buffer tank.
Had no liquifation rate, so optimized Ti121 and HIC141 . Finally put TIC121 
into manual mode at 0.65. Power lead fluctuation died out and liquid 
started building. 
This morning changed TIC121 back to auto mode and played with it's setting 
to minimize the power lead and TI121 ripples. 
TI121 ripples seem tied to power lead ripples.
System seems stable enough to energize the solenoid.
  13   Fri Apr 23 09:19:30 2004 Doug PreddyNormal RunningCV211
PIC 229 was down to 10.8 bar this morning. PIC 229 was trying to open CV211 
to charge the system. I realized that in restoring the control to CV211 I 
did not get the wire into the connector properly. Went back up to the 
compressor building  and reconnected the control wire to CV211. pressure is 
back to 11 bar. TI121, LHE in and liquid level ripples are now all reduced.

System was ramped up to 500 amps yesterday at 14:00
  15   Mon Apr 26 07:48:46 2004 Doug PreddyQuench RecoverySeries mode
Switching over to series mode.
  16   Mon Apr 26 08:12:30 2004 Doug PreddyQuench RecoveryPower leads flow
Throttled back the LHe in until the power leads started to warm. My goal is 
to flow "warm" gas (hopefully 80K) through the leads to drive any frozen 
impurities out.
  17   Tue Apr 27 09:03:18 2004 Doug PreddyNormal RunningPower leads
Power leads are being monitored with the strip tool graphs. I saw the temps 
go from having a ripple to almost no ripple, but starting to increase in 
temperature. I also noticed that the flow had dropped to 200 mm. I power 
cycled hic142. This resulted in an immediate drop in temperature, an 
increase of flow to 250 mm, and a slight drop in the LHe level. The temps 
seem to be stable, with only a slight ripple.
  18   Wed Apr 28 09:30:09 2004 Doug PreddyNormal Runningpower leads again
Same story as yesterday. Ripples dieing out, flows down to <200 mm, temps 
increasing. Turned HIC 142 down to 0.4 then back up to 0.75. Temps dropped 
quickly. Then turned HIC 142 to 0 and back to 0.75. Temps dropping, flow > 
250mm. Did not let negtive lead >10K, so would not have caused a trip.

TIC 121 into auto mode. 
  19   Thu Apr 29 23:43:15 2004 Doug PreddyQuench RecoveryStarting flow to solenoid
Solenoid quenched due to power leads at 9:00 tonight. Restarted flow in 
parallel warm mode. 
  20   Fri Apr 30 01:53:34 2004 Doug PreddyQuench Recoveryswitched to parallel cold
ELOG V2.9.2-2455