Tue Jun 14 18:48:14 2005, Experimentor, Normal Running, Power bump at 18:40
|
Solenoid tripped on a power bump at 18:40 Tuesday
-- Donald Arseneau |
Sat Jul 22 06:34:14 2006, Experimentor, Quench Recovery, looking good
|
Donald Arseneau reporting.
It is looking pretty good, so I came back in with the intent of energizing
|
Fri Oct 13 00:13:57 2006, Experimentor, Quench Recovery, Energized solenoid.
|
Hi there,
This is Khashayar (experimenter). Lookin at all different temperatures and
|
Fri Dec 19 11:34:10 2003, Doug Preddy, Quench Recovery, Final home of this E-log
|
http://isac.triumf.ca/m9sol/
Chris has set up the M9 solenoid e-log at the above web address. Play with
it and let me know if it breaks. |
Fri Dec 19 13:59:53 2003, Doug Preddy, Maintenance, To-Do list for M9SOL
|
> I had distributed this list by email earlier this month. I have added
> a few items at the bottom. I am posting it on the M9SOL Elog under
> Maintenance. Some of the items may not be achievable or practical but
|
Fri Apr 16 10:15:26 2004, Doug Preddy, Start Up, Changes to M9sol Vacuum PC
|
Yesterday and today there have been a number of changes made to the M9
Vacuum control computer. The computer now automatically boots up to the
Epics control page. This logbook is also automatically started. |
Mon Apr 19 15:06:49 2004, Doug Preddy, Start Up, Started turbines
|
Purifier run over the weekend. Both LN2 dewars empty, but purifier cold.
Disabled CV211 and flowed all charge gas through purifier. Started turbine
at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out
|
Tue Apr 20 07:06:41 2004, Doug Preddy, Start Up, morning day 2
|
Temps in solenoid are equalling out. Increasing PIC229 to 11 bar. |
Tue Apr 20 07:33:03 2004, Doug Preddy, Start Up, PIC229 at 11bar
|
PIC229 at 11 bar. Changed strip tool to 15 sec increments. |
Wed Apr 21 06:39:17 2004, Doug Preddy, Start Up, over night
|
Changed to parallel cold mode at 9:30.
At about 4:30 the city water chiller was turned on. The air compressor had
also tripped off. It was reset and restarted. |
Wed Apr 21 06:48:31 2004, Doug Preddy, Start Up, JT bypass closed
|
Closed cv155 |
Wed Apr 21 08:16:18 2004, Doug Preddy, Start Up, switch to series mode
|
Switched to series mode. |
Thu Apr 22 10:39:16 2004, Doug Preddy, Normal Running, Yesterday
|
Added two bottles of UHP helium to buffer tank.
Had no liquifation rate, so optimized Ti121 and HIC141 . Finally put TIC121
into manual mode at 0.65. Power lead fluctuation died out and liquid
|
Fri Apr 23 09:19:30 2004, Doug Preddy, Normal Running, CV211
|
PIC 229 was down to 10.8 bar this morning. PIC 229 was trying to open CV211
to charge the system. I realized that in restoring the control to CV211 I
did not get the wire into the connector properly. Went back up to the
|
Mon Apr 26 07:48:46 2004, Doug Preddy, Quench Recovery, Series mode
|
Switching over to series mode. |
Mon Apr 26 08:12:30 2004, Doug Preddy, Quench Recovery, Power leads flow
|
Throttled back the LHe in until the power leads started to warm. My goal is
to flow "warm" gas (hopefully 80K) through the leads to drive any frozen
impurities out. |
Tue Apr 27 09:03:18 2004, Doug Preddy, Normal Running, Power leads
|
Power leads are being monitored with the strip tool graphs. I saw the temps
go from having a ripple to almost no ripple, but starting to increase in
temperature. I also noticed that the flow had dropped to 200 mm. I power
|
Wed Apr 28 09:30:09 2004, Doug Preddy, Normal Running, power leads again
|
Same story as yesterday. Ripples dieing out, flows down to <200 mm, temps
increasing. Turned HIC 142 down to 0.4 then back up to 0.75. Temps dropped
quickly. Then turned HIC 142 to 0 and back to 0.75. Temps dropping, flow >
|
Thu Apr 29 23:43:15 2004, Doug Preddy, Quench Recovery, Starting flow to solenoid
|
Solenoid quenched due to power leads at 9:00 tonight. Restarted flow in
parallel warm mode. |
Fri Apr 30 01:53:34 2004, Doug Preddy, Quench Recovery, switched to parallel cold
|
|