M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 2 of 15  ELOG logo
Entry  Wed Oct 13 08:17:00 2004, Experimentor, Start Up, cycling 142 when temp hit 10.68 
    Reply  Sun Oct 17 04:26:29 2004, Other, Start Up, cycling 142 when temp hit 10.68 
Entry  Sun Oct 17 05:03:13 2004, Other, Start Up, Cycle valve after oscillations begin 
Entry  Wed Oct 20 09:38:17 2004, Doug Preddy, Start Up, restarting system 
Entry  Thu Oct 21 07:16:35 2004, Doug Preddy, Start Up, switched to parallel cold return 
Entry  Thu Oct 21 15:41:29 2004, Doug Preddy, Start Up, switched to series mode 
Entry  Fri Oct 22 09:15:06 2004, Doug Preddy, Start Up, started flow to power leads 
Entry  Wed Jun 1 08:23:19 2005, Doug Preddy, Start Up, start up notes 
Entry  Wed Nov 2 10:17:27 2005, Willy Andersson, Start Up, M9B helium refrigerator and solenoid cooldown 
Entry  Tue May 23 08:44:28 2006, Doug Preddy, Start Up, Started turbines 
Entry  Thu May 25 07:34:18 2006, Doug Preddy, Start Up, switched to parallel cold return 
Entry  Fri May 26 07:29:54 2006, Doug Preddy, Start Up, CV155 closed 
Entry  Fri May 26 08:45:38 2006, Doug Preddy, Start Up, Changed to series mode 
Entry  Fri May 26 10:03:03 2006, Doug Preddy, Start Up, Started flow to power leads 
Entry  Fri May 26 14:34:24 2006, Doug Preddy, Start Up, Ready to run 
Entry  Wed Oct 4 07:29:04 2006, Doug Preddy, Start Up, Starting cool down 
Entry  Wed Oct 4 18:10:18 2006, Willy Andersson, Start Up, Quick check on system 
Entry  Thu Oct 5 10:26:26 2006, Doug Preddy, Start Up, switched to parallel cold return 
Entry  Thu Oct 5 11:51:53 2006, Doug Preddy, Start Up, Adde 2 bottles UHP Helium 
Entry  Thu Oct 5 14:53:54 2006, Doug Preddy, Start Up, Switched to series mode 
ELOG V2.9.2-2455