Message ID: 94     Entry time: Wed Jun 1 08:23:19 2005
Author: Doug Preddy 
Operational Mode: Start Up 
Subject: start up notes 
The solenoid was pumped out Monday and yesterday after the quads just 
downstream of the solenoid were put back in place. The quad just 
downstream of the solenoid was remove to replace two coils on it. 
The cold box vacuum had tripped off some time in the last little while. 
Started it pumping on Monday also. The compressor was started Tuesday 
afternoon and flow was started to the solenoid. The purifier was 
regenerated and put on line in it's total buffer tank flow mode. The cold 
box was pressurized and the turbines were briefly spun up to check the 
operation of the new turbine speed indicator. It seems to be working 
properly. 
Flow to the turbines was started this morning and all went well. The speed 
indicator works properly. 
M9BIG1 started ot 6.6 x 10-6 before flow was started. One hour later it 
reads 4.8 x 10-6