  64   Wed Oct 13 08:17:00 2004 ExperimentorStart Upcycling 142 when temp hit 10.68
I tried cycling the valve twice -- at about 11:30 and again around 1:00,
trying both the buttons and the dial -- but it has had no effect on
the temperatures (aside from the transient spikes).  That might be
bad.  We will have to see if it altered the trend.

-- 
Donald Arseneau               
  67   Sun Oct 17 04:26:29 2004 OtherStart Upcycling 142 when temp hit 10.68
> I tried cycling the valve twice -- at about 11:30 and again around 1:00,
> trying both the buttons and the dial -- but it has had no effect on
> the temperatures (aside from the transient spikes).  That might be
> bad.  We will have to see if it altered the trend.
> 
> -- 
> Donald Arseneau               

It did -- temperatures held stable for several days
  68   Sun Oct 17 05:03:13 2004 OtherStart UpCycle valve after oscillations begin
(Sat night/Sun AM) Helium temperature started oscillating, so
powered off magnet (precautionary) and cycled valve 142 (at 04:12).
Small oscillations begin almost immediately, so close and open
the twist-knob for 142.  Works better.
  69   Wed Oct 20 09:38:17 2004 Doug PreddyStart Uprestarting system
Solenoid tripped  off Monday morning due to high compressor pressure. 
Regenerated purifier on Tuesday. Started compressor at 9:00 this morning.
  70   Thu Oct 21 07:16:35 2004 Doug PreddyStart Upswitched to parallel cold return
  71   Thu Oct 21 15:41:29 2004 Doug PreddyStart Upswitched to series mode
  72   Fri Oct 22 09:15:06 2004 Doug PreddyStart Upstarted flow to power leads
Started flow to power leads HIC142 at 0.8. 
  94   Wed Jun 1 08:23:19 2005 Doug PreddyStart Upstart up notes
The solenoid was pumped out Monday and yesterday after the quads just 
downstream of the solenoid were put back in place. The quad just 
downstream of the solenoid was remove to replace two coils on it. 
The cold box vacuum had tripped off some time in the last little while. 
Started it pumping on Monday also. The compressor was started Tuesday 
afternoon and flow was started to the solenoid. The purifier was 
regenerated and put on line in it's total buffer tank flow mode. The cold 
box was pressurized and the turbines were briefly spun up to check the 
operation of the new turbine speed indicator. It seems to be working 
properly. 
Flow to the turbines was started this morning and all went well. The speed 
indicator works properly. 
M9BIG1 started ot 6.6 x 10-6 before flow was started. One hour later it 
reads 4.8 x 10-6
  111   Wed Nov 2 10:17:27 2005 Willy AnderssonStart UpM9B helium refrigerator and solenoid cooldown
Started M9B MYCOM helium compressor circulating helium through system last 
Friday. Right hand purifier was regenerated previously, LN2 fill system 
started and flow started from buffer through purifier to low pressure 
return line to compressor. Left in this mode over the weekend. Curtis came 
in on weekend to add new full LN2 dewar to purifier.

Started // warm return cooling Monday.
Tuesday morning solenoid temps about 35 K and TI121 about 35 K  so 
switching to // cold cooling.

Note:

PDI 104 guage is very slugish to respond, needs to be replaced or cleaned.
TI148 and TI149 need to be recharged with helium, they do not work yet.
TIC121 may be reading too high a temperature, try to verify it with TE147 
before JT effect begins. Now TI121=20.7 K   TE147=25 K   HIC155 is full 
open still.
LIC108 is reading too high, reads 22% LHE but really is no LHE at this 
point.
  117   Tue May 23 08:44:28 2006 Doug PreddyStart UpStarted turbines
Solenoid and cold box were pumped out last Tuesday. Cold box roughing pump 
initially would not start. had to retighten all wires on the contactor in 
the Sulzer control panel (RP900).
Started compressor on Friday. ran purifier over the weekend.
Started flow in parallel warm return. Started flow to turbines.
Replacing dead monitor on other control computer.
  118   Thu May 25 07:34:18 2006 Doug PreddyStart Upswitched to parallel cold return
switched to parallel cold return
  119   Fri May 26 07:29:54 2006 Doug PreddyStart UpCV155 closed
CV155 closed.
Temps about 15K
  120   Fri May 26 08:45:38 2006 Doug PreddyStart UpChanged to series mode
Changed to series mode.
Liquid level building.
  121   Fri May 26 10:03:03 2006 Doug PreddyStart UpStarted flow to power leads
Started flow to power leads.
Liquid level 15%
  122   Fri May 26 14:34:24 2006 Doug PreddyStart UpReady to run
Solenoid is cold, liquid level is 35%, power leads cold and seem stable.
Added one bottle helium to buffer tank. Pressure is 7 psi..
  162   Wed Oct 4 07:29:04 2006 Doug PreddyStart UpStarting cool down
Started compressor yesterday with flow through the purifier overnight.
Starting tubines this morning in parallel warm return
  163   Wed Oct 4 18:10:18 2006 Willy AnderssonStart UpQuick check on system
System in good // warm return mode, temps coming down nicely. BCP2 cryopump 
does not look too healthy, temperature is just over 20K, very close to low 
set point.

TIC121 down to 120K, Mu1 return temp at 164K, Mu2 return at 273K, T1 inlet 
temp at 208K. Cooling looks good for overnight.
  164   Thu Oct 5 10:26:26 2006 Doug PreddyStart Upswitched to parallel cold return
  165   Thu Oct 5 11:51:53 2006 Doug PreddyStart UpAdde 2 bottles UHP Helium
Valved off purifiers, but left LN2 on.
  166   Thu Oct 5 14:53:54 2006 Doug PreddyStart UpSwitched to series mode