M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 13 of 15  ELOG logo
IDdown Date Author Operational Mode Subject Text Attachments
  46   Sun Aug 29 14:39:19 2004 Doug PreddyNormal RunningPower lead rippleThe LHe in and PL-neg temps have been building
up a ripple over the last 
few days. Curtis cycled HIC142 Friday evening
  
  45   Wed Aug 25 12:52:53 2004 Doug PreddyNormal Runningpower lead rippleLhe ripple has started. 10.9-11.4K PL-Pos
also has a smaller ripple. Both 
flows down to 230mm. Cycled HIC 142 and the
  
  44   Wed Aug 25 07:47:05 2004 Doug PreddyNormal RunningPower lead flowThe power lead flows had dropped to 210 mm
this morning. I increased HIC142 
from 0.8 to 0.83. The flows are back to <250
  
  43   Tue Aug 24 12:09:50 2004 Doug PreddyNormal RunningThe past few daysThe solenoid has been re-started as of August
19. It was cooled down and 
energized over the weekend. Sunday night
  
  42   Thu Aug 19 10:28:32 2004 Doug PreddyStart Upafter M9bv5 FIXOver the last couple of days we replaced the
gate on the M9BV5 valve. The 
old one had worn the teflon sliders on the
  
  41   Sat Aug 7 23:40:47 2004 Willy AnderssonQuench RecoveryEnergizing solenoid23:39 Powerleads cold, LHe level over 40%
and rising. Energizing solenoid 
to 500 Amps, ramp rate 60. Checking compressor
  
  40   Sat Aug 7 22:37:04 2004 Willy AnderssonQuench RecoveryCompressor tripped off.Got a call at about 10:00 this morning, the
whole system had tripped off. 
No power bumps or other disturbances. When
  
  39   Thu Jul 29 13:25:29 2004 Doug PreddyQuench Recoverystart flow to power leads    
  38   Thu Jul 29 09:01:11 2004 Doug PreddyQuench Recoveryswitched to parallel coldChanged to series mode.   
  37   Wed Jul 28 23:07:01 2004 Doug PreddyQuench Recoverysolenoid coolingcooling rates for the solenoid are good. In
parallel cold return.
  
  36   Wed Jul 28 22:01:31 2004 Doug PreddyQuench RecoveryStarting flow to solenoidc1 28, c12 29, c6 11.6, c7 12.5 TI121 22.5   
  35   Wed Jul 28 21:26:19 2004 Doug PreddyQuench RecoveryDouble Power bumpTwo power bumps tonight. Everything tripped
of. Restarted cooling water 
pump, diff. pump under solenoid etc. Computer
  
  34   Wed Jul 28 07:00:18 2004 Doug PreddyQuench Recoveryswitch to series modeSwitching to series mode. Jumper on vacuum
gauge removed.
  
  33   Wed Jul 28 00:04:30 2004 Doug PreddyQuench Recoverystarted flow to solenoidSolenoid temps were: C1 & C12 about 30K. C6
&C7 about 11K. Started flow to 
solenoid in parallel cold return. Jumpered
  
  32   Tue Jul 27 23:33:27 2004 Doug PreddyQuench RecoverySolenoid quench 9:30I was phoned at about 9:30 tonight with a
solenoid alarm. After looking at 
the display I found the system to be tripped
  
  31   Tue Jun 29 14:59:46 2004 Willy AnderssonNormal RunningRemoved jumper on vacuum controller.Tuesday 14:55

Removed jumper on back of PIC 901. This jumper
  
  30   Fri Jun 25 14:20:58 2004 Willy AnderssonQuench RecoverySwitch to series modeAt about 14:00 solenoid temps dipping below
8 K. Trace of LHe level (dense 
gas) starting to show. Switching to series
  
  29   Fri Jun 25 12:36:04 2004 Willy AnderssonQuench RecoveryCompressor unloaded etc.At about 09:30 this morning I noticed the
sound coming from the compressor 
building seemed louder than usual. After
  
  28   Fri May 21 09:27:39 2004 Doug PreddyMaintenanceIdle modePower supply was ramped down yesterday as
there are no users.
The Sundance server was rebooted yesterday.
  
  27   Thu May 6 09:32:13 2004 Willy AnderssonQuench RecoveryAdditional notes from last night power lead problems.When performing last nights refrigerator adjustments
I also increased the 
compressor discharge pressure to 11.25 barA.
  
ELOG V2.9.2-2455