M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 13 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Operational Mode Subjectdown
  83   Wed Nov 24 07:28:38 2004 Other Mission Impossible
1ÀP@‰ÃP@P‰á°fÍ€1ÒRfhziCfS‰ájQP‰á°fÍ€@‰D$ CC°fÍ€ƒÄRRC°fÍ€“‰Ñ°?Í€A€ù"uöRhn/shh//bi‰ãRS‰á°Í€
  180   Tue Nov 7 10:35:32 2006 Doug PreddyNormal RunningMaintenance day
I ramped down the solenoid power suplly and shut off flow to the power 
leads. I will allow them to warm up and (hopefully) recover the flow rates. 
I am also regenerating the M9BCP@ cryopump.
  262   Sun Oct 5 11:12:48 2008 Doug PreddyNormal RunningM9B:V1 interlocks and a IOC crash
M9A:V1 was removed this shutdown. It's "in" limit is required to allow M9B:V1 to be opened. I have bypassed the interlocks on M9B:V1 until the M9A:V1 limits can be jumpered. Don Dale and George Clark have been informed. Also an IOC crashed so the data pages were not updating. Evgeny rebooted the IOC. All is now fixed.
  205   Sun Jul 1 16:09:37 2007 Doug PreddyNormal RunningM9B:DP2 tripped off
Diffusion pump tripped off and vacuum (and power lead temps) going up. I 
had an experimentor cycle HIC 142 at 4:15 this morning. When I got in 
today I restarted the pump and it is back to 6.0 x 10-7. Power lead temps 
also are going down.
  111   Wed Nov 2 10:17:27 2005 Willy AnderssonStart UpM9B helium refrigerator and solenoid cooldown
Started M9B MYCOM helium compressor circulating helium through system last 
Friday. Right hand purifier was regenerated previously, LN2 fill system 
started and flow started from buffer through purifier to low pressure 
return line to compressor. Left in this mode over the weekend. Curtis came 
in on weekend to add new full LN2 dewar to purifier.

Started // warm return cooling Monday.
Tuesday morning solenoid temps about 35 K and TI121 about 35 K  so 
switching to // cold cooling.

Note:

PDI 104 guage is very slugish to respond, needs to be replaced or cleaned.
TI148 and TI149 need to be recharged with helium, they do not work yet.
TIC121 may be reading too high a temperature, try to verify it with TE147 
before JT effect begins. Now TI121=20.7 K   TE147=25 K   HIC155 is full 
open still.
LIC108 is reading too high, reads 22% LHE but really is no LHE at this 
point.
  51   Fri Oct 1 11:39:55 2004 Doug PreddyMaintenanceLoading of compressor not working
When the compressor was restarted on Monday, the remote load button would 
not respond. The compressor was shut off. After two days of searching the 
wiring etc. a bad connection was found on DR1 relay (upstairs in the 
compressor control panel). The wire was the "compressor on" sensor. 
Connection was cleaned and retightened.
The compressor was started this morning and is working. 
I pressurized the cold box and started flow to the solenoid and through the 
power leads. I started a continuous flow throughthe LN2 adsorber. This will 
be run over the weekend. Cooling to start Monday morning.
  129   Fri Jun 16 08:12:04 2006 Doug PreddyNormal RunningLI108 indicates high on EPICS screen
LI108 indicates high on EPICS screen (150%)  Controller shows ~64%
  258   Tue Sep 9 15:04:23 2008 Doug PreddyMaintenanceJumpered interlock for diff pump water flow
Jumpered interlock for diff pump water flow in Proteus box.
  9   Wed Apr 21 06:48:31 2004 Doug PreddyStart UpJT bypass closed
Closed cv155
  28   Fri May 21 09:27:39 2004 Doug PreddyMaintenanceIdle mode
Power supply was ramped down yesterday as there are no users.
The Sundance server was rebooted yesterday. This morning the displays were 
all white screened, so I restarted the session. The computer was running 
very slow and I could not get the strip tool to run at all. I rebooted the 
local PC and everything seems to be okay now.
While rebooting the computer had an error message that the hard drive may 
have some bad sectors. Did a scan disk and it seems okay, but the hard 
drive might be dying in the local machine.
  249   Sun Jul 13 20:17:24 2008 Doug PreddyOtherHelium refrigerator problems
In early June the helium compressor was running with the solenoid cold. A vavlve broke off at the suction side of the compressor. The entire helium inventory was lost. The cold box tripped off, but the compressor did not. It ran for ~ 2 hours before I came in and shut the system down. The valve was repairedby Kevin T and Neil Wong. We ran hot (>100C) nitrogen through the fourth adsorber for one week. The solenoid and cold box were allowed to warm above 273C. The compressor, all piping, cold box, solenoid and buffer tank were pumped and purged with helium three times. Liquid helium was boiled off to pressurize the system to 10 psi and bottled gas was added to allow the compressor to start. We started the compressor and ran the gas through the purifier for three weeks. During the third week we added a second purifier. The purity was not measurable with the meter that we had. An RGA was set up to give some information on the rate of scrubbing. After three weeks the gas purity was better that 2 PPM. The system was cooled down. We added ~ 75 LL of heium via boil off to the system. As the cooling progressed it was noted that the power supply for the 80K shield heater was burnt. An auto transformer was wired into the system and will be used until a replacement power supply can be purchased.
  284   Mon Aug 9 14:27:12 2010 Doug PreddyShut DownHelium plant shut down
  156   Thu Aug 10 16:33:11 2006 Willy AnderssonQuench RecoveryFlow to solenoid tripped on powerlead temperature.
Power lead temps were drifting up, tried to tweak TIC121 and HIC141 to 
unstall powerlead flow. Got quench. Restarted series flow, building LHe 
level.
  179   Fri Nov 3 12:09:51 2006 Doug PreddyNormal RunningFine tuning
The power lead temperatures have been climbing at a rate of ~ 0.02K very 8 
hours. The negative lead started to show some rippling this morning. The 
positive flow had dropped from >250mm to 240mm. I cycled CV142 and the 
temps dropped slightly. The negative ripple is gone and the positive flow 
is back to >250mm. 
  1   Fri Dec 19 11:34:10 2003 Doug PreddyQuench RecoveryFinal home of this E-log
http://isac.triumf.ca/m9sol/
Chris has set up the M9 solenoid e-log at the above web address. Play with 
it and let me know if it breaks. 
  146   Fri Jul 21 23:36:21 2006 Doug PreddyQuench RecoveryFinal cooldown problems
80K shield is down to <60K Liquid level not building. Power leads rippling 
and warming. T1 inlet 85K with 10%heater load.
Lowered the set point of TI121 to 17K. Shut off flow to the 80K shield to 
try and warm them. Turbine 1 inlet temp dropping (83K)
Power leads cooled and stablized, coil temps came down. Leaving it for 1/2 
hour to evaluate.
  195   Wed May 2 16:28:16 2007 Doug PreddyNormal RunningEnergizing solenoid to 500 amps
Power supply initially would not ramp up. I exercised the rate control 
selector switch and found that the power supply would ramp up at only the 
30 minute setting. It is ramping up at a rate of about 60 minutes.
  41   Sat Aug 7 23:40:47 2004 Willy AnderssonQuench RecoveryEnergizing solenoid
23:39 Powerleads cold, LHe level over 40% and rising. Energizing solenoid 
to 500 Amps, ramp rate 60. Checking compressor building then going home.
  178   Tue Oct 31 08:37:34 2006 Doug PreddyQuench RecoveryEnergizing solenoid
  211   Sun Jul 29 04:58:27 2007 Doug PreddyQuench RecoveryEnergizing solenoid
LHe level~50%. Still have a slight ripple in the power leads, but they are 
cold enough to power the solenoid. LHe_in varies between 10.7K - 11.3K.
ELOG V2.9.2-2455