M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 180     Entry time: Tue Nov 7 10:35:32 2006
Author: Doug Preddy 
Operational Mode: Normal Running 
Subject: Maintenance day 
I ramped down the solenoid power suplly and shut off flow to the power 
leads. I will allow them to warm up and (hopefully) recover the flow rates. 
I am also regenerating the M9BCP@ cryopump.
ELOG V2.9.2-2455