Entry  Wed Aug 25 07:47:05 2004, Doug Preddy, Normal Running, Power lead flow 
The power lead flows had dropped to 210 mm this morning. I increased HIC142 
from 0.8 to 0.83. The flows are back to <250 mm and the temps are back to 
LHe in-10.8, PL-Pos-11.1, PL-Neg-8.9
Entry  Tue Aug 24 12:09:50 2004, Doug Preddy, Normal Running, The past few days 
The solenoid has been re-started as of August 19. It was cooled down and 
energized over the weekend. Sunday night at 9:30 it tripped due to 
negative power lead going above it's set point. The system stopped flow to 
Entry  Thu Aug 19 10:28:32 2004, Doug Preddy, Start Up, after M9bv5 FIX 
Over the last couple of days we replaced the gate on the M9BV5 valve. The 
old one had worn the teflon sliders on the sides. Metal shavings on bottom 
of body. Found a replacement with metal rollers, rather than slides. 
Entry  Sat Aug 7 23:40:47 2004, Willy Andersson, Quench Recovery, Energizing solenoid 
23:39 Powerleads cold, LHe level over 40% and rising. Energizing solenoid 
to 500 Amps, ramp rate 60. Checking compressor building then going home.
Entry  Sat Aug 7 22:37:04 2004, Willy Andersson, Quench Recovery, Compressor tripped off. 
Got a call at about 10:00 this morning, the whole system had tripped off. 
No power bumps or other disturbances. When I arrived the only fault 
indications were "ColdBox Trip" light on the compressor panel and on the 
Entry  Thu Jul 29 13:25:29 2004, Doug Preddy, Quench Recovery, start flow to power leads 
 
Entry  Thu Jul 29 09:01:11 2004, Doug Preddy, Quench Recovery, switched to parallel cold 
Changed to series mode.
Entry  Wed Jul 28 23:07:01 2004, Doug Preddy, Quench Recovery, solenoid cooling 
cooling rates for the solenoid are good. In parallel cold return.
Entry  Wed Jul 28 22:01:31 2004, Doug Preddy, Quench Recovery, Starting flow to solenoid 
c1 28, c12 29, c6 11.6, c7 12.5 TI121 22.5
Entry  Wed Jul 28 21:26:19 2004, Doug Preddy, Quench Recovery, Double Power bump 
Two power bumps tonight. Everything tripped of. Restarted cooling water 
pump, diff. pump under solenoid etc. Computer stayed on! Starting 
compressor.
Entry  Wed Jul 28 07:00:18 2004, Doug Preddy, Quench Recovery, switch to series mode 
Switching to series mode. Jumper on vacuum gauge removed.
Entry  Wed Jul 28 00:04:30 2004, Doug Preddy, Quench Recovery, started flow to solenoid 
Solenoid temps were: C1 & C12 about 30K. C6 &C7 about 11K. Started flow to 
solenoid in parallel cold return. Jumpered out the vacuum gauge for the 
solenoid vacuum.
Entry  Tue Jul 27 23:33:27 2004, Doug Preddy, Quench Recovery, Solenoid quench 9:30 
I was phoned at about 9:30 tonight with a solenoid alarm. After looking at 
the display I found the system to be tripped off. When I came in I found 
the compressor off and the solenoid quenched. There was no real indication 
Entry  Tue Jun 29 14:59:46 2004, Willy Andersson, Normal Running, Removed jumper on vacuum controller. 
Tuesday 14:55

Removed jumper on back of PIC 901. This jumper should be off during
Entry  Fri Jun 25 14:20:58 2004, Willy Andersson, Quench Recovery, Switch to series mode 
At about 14:00 solenoid temps dipping below 8 K. Trace of LHe level (dense 
gas) starting to show. Switching to series cooling mode.
Entry  Fri Jun 25 12:36:04 2004, Willy Andersson, Quench Recovery, Compressor unloaded etc. 
At about 09:30 this morning I noticed the sound coming from the compressor 
building seemed louder than usual. After entering the building I noted that 
the compressor was unloaded to about 50% and the compressor suction was 
Entry  Fri May 21 09:27:39 2004, Doug Preddy, Maintenance, Idle mode 
Power supply was ramped down yesterday as there are no users.
The Sundance server was rebooted yesterday. This morning the displays were 
all white screened, so I restarted the session. The computer was running 
Entry  Thu May 6 09:32:13 2004, Willy Andersson, Quench Recovery, Additional notes from last night power lead problems. 
When performing last nights refrigerator adjustments I also increased the 
compressor discharge pressure to 11.25 barA. Also the backup air compressor 
was tripped off again and I reset it. Finally I opened the city water flow 
Entry  Wed May 5 23:57:38 2004, Willy Andersson, Quench Recovery, Powerleads warming up again. may5_04_1800.BMP
Got a page from Don Flemming at about 18:50 wondering why the power
lead temperatures were rising. See attachment may5_04_1800.BMP It looked as
though the monitoring signals flat lined for about 2 hours for some reason.
Entry  Wed May 5 12:13:51 2004, Doug Preddy, Normal Running, power leads cold 
should be ready to run.