ID Date Authordown Operational Mode Subject Text Attachments
  220   Mon Sep 24 15:08:41 2007 Doug PreddyStart UpStarted cool down this morningThe vacuum in the cold box was good on Friday
0.0 X 10-4. Let it pump over 
the weekend. Added two bottles of UHP helium
  
  221   Tue Sep 25 07:34:04 2007 Doug PreddyStart UpPIC229 to 11 baradjusted turbine speeds and HIC104 to maintain
their values.
  
  222   Wed Sep 26 08:52:46 2007 Doug PreddyStart Upswitched to parallel cold return    
  223   Thu Sep 27 07:41:15 2007 Doug PreddyStart UpSolenoid coldSolenoid cold and in series mode. 50% liquid
level. Starting flow to 
powerleads.
  
  224   Tue Oct 2 13:02:37 2007 Doug PreddyNormal RunningPLC problemsWhile downloading new code for 2A PLC the
M9 and M15 vacuum systems were 
shut off. This is due to the two systems
  
  225   Fri Oct 5 10:25:43 2007 Doug PreddyQuench RecoveryUnknown quench 2Kevin and I were at the Sulzer panel when
the system quenched 2. No 
obvious reasons. Restarted the system.
  
  226   Fri Oct 5 13:25:41 2007 Doug PreddyQuench Recoveryfunny graph There was a fluctuation of the positive lead
temp with no flow going to 
the power leads.
 Capture.jpg 
  227   Tue Oct 9 12:58:22 2007 Doug PreddyQuench RecoverySolenoid Quench 2Refrigeration sytem shut off at ~ 12:30 today.
No apparent reason. Only 
light on was a cold box fault. 
  
  228   Tue Oct 9 13:16:44 2007 Doug PreddyQuench Recoveryswitched to series mode    
  229   Wed Oct 24 12:04:06 2007 Doug PreddyMaintenancepower lead and cryopump regenerationRegenerating M9B:CP2 as temperature was up
to almost 20k.
Shut off flow to power leads to allow them
  
  230   Thu Nov 8 09:28:53 2007 Doug PreddyQuench Recoverystarted compressorAnd started flow to coldbox,solenoid in parallel
warm return.
  
  231   Fri Nov 9 07:37:44 2007 Doug PreddyQuench Recoveryswitched to series modeswitched to series mode.   
  232   Fri Nov 9 14:50:03 2007 Doug PreddyQuench RecoverySolenoid coldSolenoid cold. Added two bottles of helium.
Allowing to stablize. Will 
ramp power supply in half an hour.
  
  233   Fri Nov 9 16:24:33 2007 Doug PreddyMaintenance2APLC Diedthumb wheel panel all lite up. 2APLC rebooted
by Klara (Thanks). M9BMP2 not 
pumping properly. Edi is looking at it. 
  
  234   Fri Nov 9 18:56:20 2007 Doug PreddyMaintenanceSystem Ready to RunM9BMP2 was replaced. Vacuum good. Solenoid
is ramped up. :)
  
  235   Mon Nov 19 02:58:44 2007 Doug PreddyQuench RecoverySolenoid quenched on power lead over temperatureI received a page at 1:30 this morning. The
power lead temperatures were 
climbing. Cycling CV142 did not fix the problem.
  
  236   Mon Nov 19 04:30:47 2007 Doug PreddyQuench Recoveryswitched to series mode    
  237   Fri Nov 23 08:35:37 2007 Doug PreddyNormal Runningpower lead problemsAbout 10 hours ago the power lead temperatures
started to fluctuate and 
climb.
  
  238   Fri Nov 23 08:41:45 2007 Doug PreddyNormal Runningscreen grab of powerlead temps   Capture.jpg 
  239   Mon Nov 26 09:45:43 2007 Doug PreddyNormal Runningpower lead problemsPower lead temperatures were rippling yesterday
afternoon. I asked one of 
the operators to cycle CV142.
  