220
Mon Sep 24 15:08:41 2007
Doug Preddy
Start Up
Started cool down this morning
The vacuum in the cold box was good on Friday
0.0 X 10-4. Let it pump over
the weekend. Added two bottles of UHP helium
221
Tue Sep 25 07:34:04 2007
Doug Preddy
Start Up
PIC229 to 11 bar
adjusted turbine speeds and HIC104 to maintain
their values.
222
Wed Sep 26 08:52:46 2007
Doug Preddy
Start Up
switched to parallel cold return
223
Thu Sep 27 07:41:15 2007
Doug Preddy
Start Up
Solenoid cold
Solenoid cold and in series mode. 50% liquid
level. Starting flow to
powerleads.
224
Tue Oct 2 13:02:37 2007
Doug Preddy
Normal Running
PLC problems
While downloading new code for 2A PLC the
M9 and M15 vacuum systems were
shut off. This is due to the two systems
225
Fri Oct 5 10:25:43 2007
Doug Preddy
Quench Recovery
Unknown quench 2
Kevin and I were at the Sulzer panel when
the system quenched 2. No
obvious reasons. Restarted the system.
226
Fri Oct 5 13:25:41 2007
Doug Preddy
Quench Recovery
funny graph
There was a fluctuation of the positive lead
temp with no flow going to
the power leads.
227
Tue Oct 9 12:58:22 2007
Doug Preddy
Quench Recovery
Solenoid Quench 2
Refrigeration sytem shut off at ~ 12:30 today.
No apparent reason. Only
light on was a cold box fault.
228
Tue Oct 9 13:16:44 2007
Doug Preddy
Quench Recovery
switched to series mode
229
Wed Oct 24 12:04:06 2007
Doug Preddy
Maintenance
power lead and cryopump regeneration
Regenerating M9B:CP2 as temperature was up
to almost 20k.
Shut off flow to power leads to allow them
230
Thu Nov 8 09:28:53 2007
Doug Preddy
Quench Recovery
started compressor
And started flow to coldbox,solenoid in parallel
warm return.
231
Fri Nov 9 07:37:44 2007
Doug Preddy
Quench Recovery
switched to series mode
switched to series mode.
232
Fri Nov 9 14:50:03 2007
Doug Preddy
Quench Recovery
Solenoid cold
Solenoid cold. Added two bottles of helium.
Allowing to stablize. Will
ramp power supply in half an hour.
233
Fri Nov 9 16:24:33 2007
Doug Preddy
Maintenance
2APLC Died
thumb wheel panel all lite up. 2APLC rebooted
by Klara (Thanks). M9BMP2 not
pumping properly. Edi is looking at it.
234
Fri Nov 9 18:56:20 2007
Doug Preddy
Maintenance
System Ready to Run
M9BMP2 was replaced. Vacuum good. Solenoid
is ramped up. :)
235
Mon Nov 19 02:58:44 2007
Doug Preddy
Quench Recovery
Solenoid quenched on power lead over temperature
I received a page at 1:30 this morning. The
power lead temperatures were
climbing. Cycling CV142 did not fix the problem.
236
Mon Nov 19 04:30:47 2007
Doug Preddy
Quench Recovery
switched to series mode
237
Fri Nov 23 08:35:37 2007
Doug Preddy
Normal Running
power lead problems
About 10 hours ago the power lead temperatures
started to fluctuate and
climb.
238
Fri Nov 23 08:41:45 2007
Doug Preddy
Normal Running
screen grab of powerlead temps
239
Mon Nov 26 09:45:43 2007
Doug Preddy
Normal Running
power lead problems
Power lead temperatures were rippling yesterday
afternoon. I asked one of
the operators to cycle CV142.