M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 230     Entry time: Thu Nov 8 09:28:53 2007
Author: Doug Preddy 
Operational Mode: Quench Recovery 
Subject: started compressor 
And started flow to coldbox,solenoid in parallel warm return.


Tuesday evening theree was a 2 hour power outage 19:00- 21:00. No call 
made to M9 operator.
Wednesday tried to recover vacuum. Started cool down Thursday morning.
ELOG V2.9.2-2455