M9sol Logbooks
Solenoid
Daily log
Solenoid logbook, Page 11 of 15
New
|
Reply
|
Find
|
Delete
|
Last day
|
Help
|
Config
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
286 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
,
13
,
14
,
15
Next
All
ID
Date
Author
Operational Mode
Subject
Text
197
Wed May 30 08:38:38 2007
Doug Preddy
Quench Recovery
Solenoid quenched this morning
Solenoid quenched this morning on power lead
temp (I believe).
I restarted it at ~7:00, but the capacity
198
Wed May 30 11:27:32 2007
Doug Preddy
Quench Recovery
Problems recovering
Various start up problems :
MV51 stuck open. Finally got it closed by
hitting the valve with a hammer.
199
Thu May 31 07:11:05 2007
Doug Preddy
Quench Recovery
switched to parallel cold return
switched to parallel cold return earlier this
morning. Vacuum is 5 x 10-5.
200
Thu May 31 11:51:49 2007
Doug Preddy
Quench Recovery
Switched to series mode
201
Tue Jun 12 12:48:25 2007
Doug Preddy
Maintenance
added one bottle UHP helium to system
202
Thu Jun 14 00:10:10 2007
Doug Preddy
Quench Recovery
recovering from earlier quench
Solenoid quenched on power lead temperature
last night at about 6:00. I
restarted flow to the solenoid in parallel
203
Sat Jun 16 15:05:03 2007
Doug Preddy
Normal Running
Solenoid power lead temp problem
Power lead temps rippling and increasing.
I asked an operator to cycle
HIC142. This seems to have fixed the problem
204
Tue Jun 19 21:15:41 2007
Doug Preddy
Quench Recovery
Today's quench
power lead temps caused a quench at 8:30 this
morning. Recovery of system
and flow to solenoid was started by 11:00.
205
Sun Jul 1 16:09:37 2007
Doug Preddy
Normal Running
M9B:DP2 tripped off
Diffusion pump tripped off and vacuum (and
power lead temps) going up. I
had an experimentor cycle HIC 142 at 4:15
206
Wed Jul 4 11:13:12 2007
Doug Preddy
Quench Recovery
test
This is a test to make sure the e-mail works.
207
Thu Jul 5 03:04:50 2007
Doug Preddy
Normal Running
Power lead problems
The power leads temps are starting to cycle
again. Earlier today M9
experimentor cycled HIC142 to stablize the
209
Sat Jul 28 15:45:17 2007
Doug Preddy
Quench Recovery
quench recovery
The solenoid tripped off this morning due
to pwer lead over temp. The
compressor was also off. I restarted this
210
Sat Jul 28 22:30:13 2007
Doug Preddy
Quench Recovery
quench again
recovered system and energized solenoid at
about 6:00 this evening.
At 9:30 power lead temps quenched solenoid
211
Sun Jul 29 04:58:27 2007
Doug Preddy
Quench Recovery
Energizing solenoid
LHe level~50%. Still have a slight ripple
in the power leads, but they are
cold enough to power the solenoid. LHe_in
213
Mon Aug 6 08:41:31 2007
Doug Preddy
Quench Recovery
Cold box trip at 6:00
compressor off due to cold box trip at 6:00
this morning. Restarted system
and started flow to solenoid in parallel
214
Tue Aug 14 10:15:22 2007
Doug Preddy
Maintenance
Solenoid ramped down
Solenoid ramped down and locked out for M9A
slits work.
215
Tue Aug 14 12:55:12 2007
Doug Preddy
Normal Running
Strip tool saves
There are two strip tools saved:
coils
powerlead
216
Wed Sep 12 12:01:02 2007
Doug Preddy
Maintenance
regenerated adsorber
regenerated adsorber
replaced MV902 "ON" switch (used nitrogen
precooling on switch)
217
Fri Sep 14 12:44:52 2007
Doug Preddy
Start Up
started compressor
running purifier over weekend
219
Wed Sep 19 20:53:18 2007
Doug Preddy
Maintenance
More diff pump news
Cold box pumped out to ~ 190 mTorr overnight.Leak
checked the pump again.
Still leaks at dip stick.Tried resetting
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
,
13
,
14
,
15
Next
All
ELOG V2.9.2-2455