M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 204     Entry time: Tue Jun 19 21:15:41 2007
Author: Doug Preddy 
Operational Mode: Quench Recovery 
Subject: Today's quench 
power lead temps caused a quench at 8:30 this morning. Recovery of system 
and flow to solenoid was started by 11:00. Solenoid was switched to series 
cold at 3:00. Solenoid and power leads were cold at ~6:30. power supply 
was to be energized by experimenters.
ELOG V2.9.2-2455