Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1233, Last 16384 days
New
|
Find
|
Select
|
Import
|
Config
|
Last 32768 days
|
Help
New entries since:
Tue Jan 8 08:53:57 1980
Full
| Summary |
Threaded
19 Entries
ID
Date
Author
Type
Category
Subject
Text
19
Thu Dec 13 13:21:55 2012
Naomi Galinski
calibration alpha source used
Before run: (gain changed since source
run was done)
S2: 3-alpha R-00866 2.81e3 Bq 5.
18
Sat Dec 8 10:46:51 2012
Barry
scintillator gain change documentation in EPICS
Here are some plots of the scintillator
count rate (Scaler S4) overnight. The first
shows the result of a gain shift, the second
17
Sat Dec 8 09:17:42 2012
Naomi Galinski
Histogram screen shots
Screen shots of:
1) ADC 11 ch 0-7 Corresponds to LEDA
0 ch 0-7
16
Fri Dec 7 17:40:59 2012
Sky
Integrated 8Li current screenshot
15
Thu Dec 6 22:42:49 2012
Naomi Galinski
Run 248 & 249 - no beam current monitor
Run 248 Start 6:50 am
Run 249 Start 11:01 am
64 MeV Li8 beam.
14
Thu Dec 6 22:31:53 2012
Naomi Galinski
Run 242 - alpha calibration
3-alpha source used on S2
241Am source used on LEDA
13
Thu Dec 6 22:30:13 2012
Naomi Galinski
Beam current and Si triggers
12
Thu Dec 6 21:26:55 2012
Naomi Galinski
Old TDC trigger setting + Tom's log book entry scans in pdf
This is a scan of Tom's log book for an
experiment. One of the pages contains their
trigger setting. There might be other useful
11
Thu Dec 6 21:24:42 2012
Naomi Galinski
Pump down, venting, cooling preamps and epics
Pump down and venting of chamber is controlled
via the TUDA epics.
http://www.triumf.info/wiki/tuda-tactic/index.php/EPICS_and_ISAC_status
10
Thu Dec 6 21:23:25 2012
Naomi Galinski
MIDAS UK configuration and startup
Here are some useful links and files:
http://npg.dl.ac.uk/MIDAS/MIDASDataAcquisition/base.html
http://npg.dl.ac.uk/documents/edoc247/edoc247_7.htm
9
Thu Dec 6 21:05:46 2012
Naomi Galinski
TUDA setup - how to get TUDA ready for our experiment
- Ground test TUDA chamber.
- Vacuum test chamber and check cooling
of preamps. Temperature sensor for preamps
8
Thu Dec 6 20:28:23 2012
Naomi Galinski
DAQ configuration
VME crate (master): VME V430
1x MVME2431 VME processor module,
slot 1
7
Thu Dec 6 11:03:10 2012
Naomi Galinski
Detector specs
S2 500 um: I think the bias is - 75V. I
pulled that out from a previous Tuda experiment
elog
6
Thu Dec 6 10:58:31 2012
Naomi Galinski
Amplifier gain and thresholds
Gain:
Max channel no. in Silena 9418 ADCs
is 4096. We want the max channel correspond
5
Thu Dec 6 10:41:35 2012
Naomi Galinski
3-alpha source energies
239Pu: Ealpha = 5.1055 MeV (11.94%)
Ealpha = 5.1443 MeV (17.11%)
Ealpha = 5.1566 MeV (70.77%)
4
Thu Dec 6 10:38:12 2012
Naomi Galinski
MIDAS ADC channels
LEDA: 8 sectors with 16 segments
each
S9418#11.adc0 - 15 -> Sector 0
3
Thu Dec 6 10:08:12 2012
Naomi Galinski
16O 4+ stable beam tuning
242 pA @ upstream FC
229 pA @ TUDA FC through 1 can hole
209 pA through 5 mm hole in target
2
Thu Dec 6 09:56:17 2012
Naomi Galinski
Si detector distances
Face of S2 is 5.2 cm from target.
Face of LEDA is 55.7 cm from face
of S2.
1
Thu Dec 6 09:54:42 2012
Naomi Galinski
Target and target ladder position
1.75 mg/cm2 C foils located at position
1 (69.4 mm) and 3 (99.2 mm)
ELOG V2.9.2-2455