Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1233  ELOG logo
  ID Date Author Type Category Subject Text Attachments
  19   Thu Dec 13 13:21:55 2012 Naomi Galinski  calibration alpha source used  Before run: (gain changed since source
run was done)
S2: 3-alpha R-00866 2.81e3 Bq 5.
  
  18   Sat Dec 8 10:46:51 2012 Barry  scintillator gain change documentation in EPICS Here are some plots of the scintillator
count rate (Scaler S4) overnight. The first
shows the result of a gain shift, the second
 2012-12-08-00-28-05.grab.zu7x55.png2012-12-08-01-24-21.grab.Rl8Wi5.png2012-12-08-03-24-07.grab.gujgU4.png 
  17   Sat Dec 8 09:17:42 2012 Naomi Galinski  Histogram screen shotsScreen shots of:
1) ADC 11 ch 0-7 Corresponds to LEDA
0 ch 0-7
 CIMG2291_sm.JPGCIMG2292_sm.JPGCIMG2293_sm.JPGCIMG2293_LEDA4_ch5.jpg 
  16   Fri Dec 7 17:40:59 2012 Sky  Integrated 8Li current screenshot   integratedbeamcurrent.png 
  15   Thu Dec 6 22:42:49 2012 Naomi Galinski  Run 248 & 249 - no beam current monitorRun 248 Start 6:50 am
Run 249 Start 11:01 am
64 MeV Li8 beam.
  
  14   Thu Dec 6 22:31:53 2012 Naomi Galinski  Run 242 - alpha calibration 3-alpha source used on S2
241Am source used on LEDA
  
  13   Thu Dec 6 22:30:13 2012 Naomi Galinski  Beam current and Si triggers   Beam_current_trigger.PDFSi_trigger.PDF 
  12   Thu Dec 6 21:26:55 2012 Naomi Galinski  Old TDC trigger setting + Tom's log book entry scans in pdfThis is a scan of Tom's log book for an
experiment. One of the pages contains their
trigger setting. There might be other useful
 Old_TDC_trigger_settings.pdf 
  11   Thu Dec 6 21:24:42 2012 Naomi Galinski  Pump down, venting, cooling preamps and epicsPump down and venting of chamber is controlled
via the TUDA epics.
 http://www.triumf.info/wiki/tuda-tactic/index.php/EPICS_and_ISAC_status
 TUDAepics.png 
  10   Thu Dec 6 21:23:25 2012 Naomi Galinski  MIDAS UK configuration and startupHere are some useful links and files:
 http://npg.dl.ac.uk/MIDAS/MIDASDataAcquisition/base.html
http://npg.dl.ac.uk/documents/edoc247/edoc247_7.htm
 README.MIDASlatestlatest 
  9   Thu Dec 6 21:05:46 2012 Naomi Galinski  TUDA setup - how to get TUDA ready for our experiment - Ground test TUDA chamber.
- Vacuum test chamber and check cooling
of preamps. Temperature sensor for preamps
  
  8   Thu Dec 6 20:28:23 2012 Naomi Galinski  DAQ configuration VME crate (master): VME V430 
1x MVME2431 VME processor module,
slot 1
  
  7   Thu Dec 6 11:03:10 2012 Naomi Galinski  Detector specsS2 500 um: I think the bias is - 75V. I
pulled that out from a previous Tuda experiment
elog
  
  6   Thu Dec 6 10:58:31 2012 Naomi Galinski  Amplifier gain and thresholds Gain: 
Max channel no. in Silena 9418 ADCs
is 4096. We want the max channel correspond
 ral109gain.txt 
  5   Thu Dec 6 10:41:35 2012 Naomi Galinski  3-alpha source energies 239Pu: Ealpha = 5.1055 MeV (11.94%)
Ealpha = 5.1443 MeV (17.11%)
Ealpha = 5.1566 MeV (70.77%)
  
  4   Thu Dec 6 10:38:12 2012 Naomi Galinski  MIDAS ADC channels LEDA: 8 sectors with 16 segments
each
S9418#11.adc0 - 15 -> Sector 0
 LEDAcablenumbers.PDF 
  3   Thu Dec 6 10:08:12 2012 Naomi Galinski  16O 4+ stable beam tuning 242 pA @ upstream FC
229 pA @ TUDA FC through 1 can hole
209 pA through 5 mm hole in target
  
  2   Thu Dec 6 09:56:17 2012 Naomi Galinski  Si detector distancesFace of S2 is 5.2 cm from target.
Face of LEDA is 55.7 cm from face
of S2.
  
  1   Thu Dec 6 09:54:42 2012 Naomi Galinski  Target and target ladder position 1.75 mg/cm2 C foils located at position
1 (69.4 mm) and 3 (99.2 mm)
  
ELOG V2.9.2-2455