Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1233  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thu Dec 13 13:21:55 2012, Naomi Galinski, , , calibration alpha source used  
 Before run: (gain changed since source run was done)
S2: 3-alpha R-00866 2.81e3 Bq 5. Aug. 10 (Tigress source)
LEDA: 241Am 3.67e5 Bq 15. Sept 09 (Dragon source)
Entry  Sat Dec 8 10:46:51 2012, Barry, , , scintillator gain change documentation in EPICS 2012-12-08-00-28-05.grab.zu7x55.png2012-12-08-01-24-21.grab.Rl8Wi5.png2012-12-08-03-24-07.grab.gujgU4.png
 Here are some plots of the scintillator count rate (Scaler S4) overnight. The first shows the result of a gain shift, the second a positive effect
from tuning in ISAC-I, and the third another gain shift.
Entry  Sat Dec 8 09:17:42 2012, Naomi Galinski, , , Histogram screen shots CIMG2291_sm.JPGCIMG2292_sm.JPGCIMG2293_sm.JPGCIMG2293_LEDA4_ch5.jpg
Screen shots of:
1) ADC 11 ch 0-7 Corresponds to LEDA 0 ch 0-7
2) ADC 4 ch 0-31 Corresponds to S2 front ch 0-31
Entry  Fri Dec 7 17:40:59 2012, Sky, , , Integrated 8Li current screenshot integratedbeamcurrent.png
 
Entry  Thu Dec 6 22:42:49 2012, Naomi Galinski, , , Run 248 & 249 - no beam current monitor 
Run 248 Start 6:50 am
Run 249 Start 11:01 am
64 MeV Li8 beam.
Entry  Thu Dec 6 22:31:53 2012, Naomi Galinski, , , Run 242 - alpha calibration 
 3-alpha source used on S2
241Am source used on LEDA
Entry  Thu Dec 6 22:30:13 2012, Naomi Galinski, , , Beam current and Si triggers Beam_current_trigger.PDFSi_trigger.PDF
 
Entry  Thu Dec 6 21:26:55 2012, Naomi Galinski, , , Old TDC trigger setting + Tom's log book entry scans in pdf Old_TDC_trigger_settings.pdf
This is a scan of Tom's log book for an experiment. One of the pages contains their trigger setting. There might be other useful things in there too.
 https://elog.triumf.ca/Tuda/S1287/110621_025629/tuda_book13_1-47.pdf
The uploaded pdf is their TDC trigger setting which is just a crop of a page in the file above.
Entry  Thu Dec 6 21:24:42 2012, Naomi Galinski, , , Pump down, venting, cooling preamps and epics TUDAepics.png
Pump down and venting of chamber is controlled via the TUDA epics.
 http://www.triumf.info/wiki/tuda-tactic/index.php/EPICS_and_ISAC_status
 
Entry  Thu Dec 6 21:23:25 2012, Naomi Galinski, , , MIDAS UK configuration and startup README.MIDASlatestlatest
Here are some useful links and files:
 http://npg.dl.ac.uk/MIDAS/MIDASDataAcquisition/base.html
http://npg.dl.ac.uk/documents/edoc247/edoc247_7.htm
Entry  Thu Dec 6 21:05:46 2012, Naomi Galinski, , , TUDA setup - how to get TUDA ready for our experiment 
 - Ground test TUDA chamber.
- Vacuum test chamber and check cooling of preamps. Temperature sensor for preamps must be attached inside chamber.
- Mount beam tuning target holes (5, 3, 1 mm) and target holders (with 10 mm holes)
Entry  Thu Dec 6 20:28:23 2012, Naomi Galinski, , , DAQ configuration 
 VME crate (master): VME V430 
1x MVME2431 VME processor module, slot 1
1x SBS master, slot 2
Entry  Thu Dec 6 11:03:10 2012, Naomi Galinski, , , Detector specs 
S2 500 um: I think the bias is - 75V. I pulled that out from a previous Tuda experiment elog
VT100 monitor readout:
S2-1 75 V - leakage current ~ 5 uA
Entry  Thu Dec 6 10:58:31 2012, Naomi Galinski, , , Amplifier gain and thresholds ral109gain.txt
 Gain: 
Max channel no. in Silena 9418 ADCs is 4096. We want the max channel correspond to just above 70 MeV.
We have the 241Am single source in front of the LEDA and the 3-alpha source in front of the S2. Therefore we want the 5.4856 MeV alpha peak
Entry  Thu Dec 6 10:41:35 2012, Naomi Galinski, , , 3-alpha source energies 
 239Pu: Ealpha = 5.1055 MeV (11.94%)
Ealpha = 5.1443 MeV (17.11%)
Ealpha = 5.1566 MeV (70.77%)
Entry  Thu Dec 6 10:38:12 2012, Naomi Galinski, , , MIDAS ADC channels LEDAcablenumbers.PDF
 LEDA: 8 sectors with 16 segments each
S9418#11.adc0 - 15 -> Sector 0
S9418#11.adc16 - 31 -> Sector 1
Entry  Thu Dec 6 10:08:12 2012, Naomi Galinski, , , 16O 4+ stable beam tuning 
 242 pA @ upstream FC
229 pA @ TUDA FC through 1 can hole
209 pA through 5 mm hole in target ladder
Entry  Thu Dec 6 09:56:17 2012, Naomi Galinski, , , Si detector distances 
Face of S2 is 5.2 cm from target.
Face of LEDA is 55.7 cm from face of S2.
Entry  Thu Dec 6 09:54:42 2012, Naomi Galinski, , , Target and target ladder position 
 1.75 mg/cm2 C foils located at position 1 (69.4 mm) and 3 (99.2 mm)
ELOG V2.9.2-2455