Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1203, Page 1 of 1  ELOG logo
Entry  Thu Jul 7 19:43:43 2011, Hicham, , , s1203 logbook s1203Logbook.PDF
 
Entry  Fri Jun 10 08:24:45 2011, Derek and Sarah, Routine, General, Day Shift summary Friday 
08:20 Beam back and running agains
Rate: 2200
Lost proton beam at 9:41
Entry  Fri Jun 10 07:13:58 2011, Greg Tomney, , , Shift Overview for 00 - 8:00 June 10 
Beamrate (scintillator) - 0
Accepted Trigger - 0
Trigger - 3
Entry  Thu Jun 9 15:47:41 2011, Derek, Sambuu, Routine, General, Day shift summay Thursday 
No troubles
Beamrate: 1600
Trigger Rate: 9
Entry  Wed Jun 8 09:09:31 2011, Alex Rojas, Routine, General, Beam maintenance 
Beam interrupted at 8am for maintenance scheduled.
Beam back at 10am.
Entry  Wed Jun 8 07:05:12 2011, David Cross, Routine, General, Shift report 00:00 - 08:00 
Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
Entry  Tue Jun 7 23:39:08 2011, Greg and Sambuu, , , Shift Overview for 16-22:00 June 7 
Beamrate (scintillator) - 2592 
Accepted Trigger - 7
Trigger - 7
Entry  Tue Jun 7 16:17:17 2011, Julian, , , 11Li spectroscopy June 7th - 8am-4pm shift 
At 9:30am the beam was given to the controll room in between 2 runs.
At ~10am the beam tripped--> restarted and data was coming in, but SC8 showed nothing --> DAQ was restarted from the control room -->
problem solved
Entry  Tue Jun 7 07:48:52 2011, Andrew Valencik, Routine, General, Owl Shift June 7 - DTL Tripping issues 

0:02 Run 328 started
1:33 Run 328 stopped so ISAC control could run tests and take measurements
1:36 Run 329 starts. Beam drops at 2:30am. Stop runat 2:36. "DTL tank 1 tripped off" -ISAC Summary
Entry  Mon Jun 6 22:47:35 2011, Hicham, , , 11Li beam, yehhhhhhhhhhhhhhhhhhh ! 
 
Persons on shift : Ritu, Nigel, Alex, Sambuu & Hicham
Finally, we got our first 11Li beam around of 1800 pps for 4.77 MeV/u @ 21h55.
Entry  Sun Jun 5 23:44:54 2011, Andrew Valencik, Other, General, ADC Assignment Summary ADC_Assignment_2011.pdf
ΔE LEDA Detector
ΔE0 ADC1 0 - 15
ΔE1 ADC1 16 - 31
ΔE2
Entry  Sun Jun 5 17:57:52 2011, Andrew Valencik, Routine, General, README for MIDAS DAQ README.MIDAS
 
README.MIDAS

 

Shutting Down MIDAS DAQ

-----------------------
Entry  Sun Jun 5 17:02:53 2011, Ritu, Other, General, S1203 startup 
 Saturday (June 4)
22Ne (8+) was tuned through TUDA @ ~ 110 enA checking on the
Faraday Cup. 
Entry  Sat May 28 21:16:45 2011, Hicham, , , Mounting S2+LEDA preamps 
- Chamber stripped out after S1287
- Mounting premaps for S2 + 3xLEDA
Entry  Sat May 28 19:18:11 2011, Hicham, Routine, General, proposal, safety report, and other documents S1203_200812S_merged.pdfS1203_201105_Safety.pdfs1203_safety_report.odt
see attached
ELOG V2.9.2-2455