Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1203, Page 1 of 1
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
15 Entries
ID
Date
Author
Type
Category
Subject
Text
15
Thu Jul 7 19:43:43 2011
Hicham
s1203 logbook
1
Sat May 28 19:18:11 2011
Hicham
Routine
General
proposal, safety report, and other documents
see attached
10
Wed Jun 8 07:05:12 2011
David Cross
Routine
General
Shift report 00:00 - 08:00
Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
9
Tue Jun 7 23:39:08 2011
Greg and Sambuu
Shift Overview for 16-22:00 June 7
Beamrate (scintillator) - 2592
Accepted Trigger - 7
Trigger - 7
13
Fri Jun 10 07:13:58 2011
Greg Tomney
Shift Overview for 00 - 8:00 June 10
Beamrate (scintillator) - 0
Accepted Trigger - 0
Trigger - 3
3
Sun Jun 5 17:02:53 2011
Ritu
Other
General
S1203 startup
Saturday (June 4)
22Ne (8+) was tuned through TUDA
@ ~ 110 enA checking on the
4
Sun Jun 5 17:57:52 2011
Andrew Valencik
Routine
General
README for MIDAS DAQ
README.MIDAS
7
Tue Jun 7 07:48:52 2011
Andrew Valencik
Routine
General
Owl Shift June 7 - DTL Tripping issues
0:02 Run 328 started
1:33 Run 328 stopped so ISAC control
could run tests and take measurements
2
Sat May 28 21:16:45 2011
Hicham
Mounting S2+LEDA preamps
- Chamber stripped out after S1287
- Mounting premaps for S2 + 3xLEDA
12
Thu Jun 9 15:47:41 2011
Derek, Sambuu
Routine
General
Day shift summay Thursday
No troubles
Beamrate: 1600
Trigger Rate: 9
14
Fri Jun 10 08:24:45 2011
Derek and Sarah
Routine
General
Day Shift summary Friday
08:20 Beam back and running agains
Rate: 2200
Lost proton beam at 9:41
11
Wed Jun 8 09:09:31 2011
Alex Rojas
Routine
General
Beam maintenance
Beam interrupted at 8am for maintenance
scheduled.
Beam back at 10am.
5
Sun Jun 5 23:44:54 2011
Andrew Valencik
Other
General
ADC Assignment Summary
ΔE LEDA Detector
ΔE0 ADC1
8
Tue Jun 7 16:17:17 2011
Julian
11Li spectroscopy June 7th - 8am-4pm shift
At 9:30am the beam was given to the controll
room in between 2 runs.
At ~10am the beam tripped--> restarted
6
Mon Jun 6 22:47:35 2011
Hicham
11Li beam, yehhhhhhhhhhhhhhhhhhh !
Persons on shift : Ritu, Nigel, Alex,
Sambuu & Hicham
ELOG V2.9.2-2455