Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1203, Page 1 of 1  ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  15   Thu Jul 7 19:43:43 2011 Hicham  s1203 logbook   s1203Logbook.PDF 
  1   Sat May 28 19:18:11 2011 HichamRoutineGeneralproposal, safety report, and other documentssee attached  S1203_200812S_merged.pdfS1203_201105_Safety.pdfs1203_safety_report.odt 
  10   Wed Jun 8 07:05:12 2011 David CrossRoutineGeneralShift report 00:00 - 08:00Beamrate (scintillator) - 2240
Accepted Trigger - 7
Trigger - 7
  
  9   Tue Jun 7 23:39:08 2011 Greg and Sambuu  Shift Overview for 16-22:00 June 7Beamrate (scintillator) - 2592 
Accepted Trigger - 7
Trigger - 7
  
  13   Fri Jun 10 07:13:58 2011 Greg Tomney  Shift Overview for 00 - 8:00 June 10Beamrate (scintillator) - 0
Accepted Trigger - 0
Trigger - 3
  
  3   Sun Jun 5 17:02:53 2011 RituOtherGeneralS1203 startup Saturday (June 4)
22Ne (8+) was tuned through TUDA
@ ~ 110 enA checking on the
  
  4   Sun Jun 5 17:57:52 2011 Andrew ValencikRoutineGeneralREADME for MIDAS DAQ 
README.MIDAS

 
 README.MIDAS 
  7   Tue Jun 7 07:48:52 2011 Andrew ValencikRoutineGeneralOwl Shift June 7 - DTL Tripping issues
0:02 Run 328 started
1:33 Run 328 stopped so ISAC control
could run tests and take measurements
  
  2   Sat May 28 21:16:45 2011 Hicham  Mounting S2+LEDA preamps- Chamber stripped out after S1287
- Mounting premaps for S2 + 3xLEDA
  
  12   Thu Jun 9 15:47:41 2011 Derek, SambuuRoutineGeneralDay shift summay ThursdayNo troubles
Beamrate: 1600
Trigger Rate: 9
  
  14   Fri Jun 10 08:24:45 2011 Derek and SarahRoutineGeneralDay Shift summary Friday08:20 Beam back and running agains
Rate: 2200
Lost proton beam at 9:41
  
  11   Wed Jun 8 09:09:31 2011 Alex RojasRoutineGeneralBeam maintenanceBeam interrupted at 8am for maintenance
scheduled.
Beam back at 10am.
  
  5   Sun Jun 5 23:44:54 2011 Andrew ValencikOtherGeneralADC Assignment SummaryΔE LEDA Detector
ΔE0 ADC1
 ADC_Assignment_2011.pdf 
  8   Tue Jun 7 16:17:17 2011 Julian  11Li spectroscopy June 7th - 8am-4pm shiftAt 9:30am the beam was given to the controll
room in between 2 runs.
At ~10am the beam tripped--> restarted
  
  6   Mon Jun 6 22:47:35 2011 Hicham  11Li beam, yehhhhhhhhhhhhhhhhhhh ! 
Persons on shift : Ritu, Nigel, Alex,
Sambuu & Hicham
  
ELOG V2.9.2-2455