Tuda logbooks
General
E1104
ISACII
E1195
E1103
E1147
S1287
S1203
S1233
S1284
S1447 23Na(a,p)
S1540
S1381
S1847 Catania
S1203
Fields marked with
*
are required
Entry time:
Thu Nov 14 20:36:47 2024
Author
*
:
Type:
- please select -
Routine
Other
Category:
- please select -
General
Other
Subject:
<p> <p>0:02 Run 328 started</p> <p>1:33 Run 328 stopped so ISAC control could run tests and take measurements</p> <p>1:36 Run 329 starts. Beam drops at 2:30am. Stop runat 2:36. "DTL tank 1 tripped off" -ISAC Summary</p> <p>2:40 Run 330 starts. DTC Tank 1 trips again, lost beam for about 6min</p> <p>3:23-3:49 no beam</p> <p>3:49 beam returns, start run 331, beam only lasts for 3 minutes</p> <p>No beam…</p> <p>5:14 beam returns. Start run332 continues for 2 hours</p> <p>7:15 new run started. Leakage currents measured, all normal.</p> <p> </p> <p>Beam issues were caused by a waterflow problem in the DTL tanks, more details available on the ISAC Operations Logbook for June 7</p> </p> <p> </p> <div> </div> <div> </div> <p> </p> <p> </p> <p> </p> <p> </p> <p> </p> <p> </p> <p> </p> <p> </p> <p> <meta charset="utf-8" /></p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455