722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on. |
|
274
|
Friday, January 18, 2013, 15:34 |
Anders Mjos | empty | | | | | | | Pumping down empty chamber | Started roughing
Friday, January 18, 2013, 15:25:
Started turbos |
|
683
|
Friday, August 31, 2018, 12:27 |
Aaron Schmidt | nSiC#1 | LP-SIS | ITW | TM2 | 43044-1 | 42752-4 | In progress | Conditioning nSiC#1 | Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started. |
15x |
739
|
Wednesday, June 26, 2019, 14:41 |
Carla Babcock | none | | | | | | Problems/Solutions | Issues with test stand wiring in service cap area | The wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows: |
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before |
|
744
|
Monday, July 08, 2019, 09:20 |
Luca Egoriti | p2n1 | | ITE | | | | In progress | p2n heating test | (see entry 742)
p2n target heated over the weekend |
|
86
|
Tuesday, May 15, 2012, 08:08 |
Rick Maharaj | sic#27 | | | | | | | Turbos off | Target needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits |
|
|