872
|
Wednesday, April 28, 2021, 22:34 |
Luca Egoriti | P2N test - Apr 2021 | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A |
|
922
|
Monday, May 02, 2022, 14:10 |
Aaron Schmidt | | P2N-SIS | | | | | | Empty Chamber PS test. | No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has |
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
926
|
Wednesday, May 11, 2022, 10:05 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | | P2N assembly conditioning - 3 | Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on |
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
|