ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
1003
|
Monday, April 15, 2024, 14:35 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSH:EE Issues | Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.
Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.
Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.
Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.
Tuesday, April 16, 2024, 17:49: TP1A on.
Tuesday, April 16, 2024, 17:55: Restarted TP6.
Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.
Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.
Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.
Wednesday, April 17, 2024, 13:03: RP on.
Wednesday, April 17, 2024, 13:14: TP1A on.
Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.
Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.
Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V
Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V
Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.
|
1004
|
Wednesday, April 17, 2024, 14:16 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use - Run 2 | https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.
Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.
Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.
Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.
Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.
Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.
Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.
Thursday, April 18, 2024, 08:39: Optics set with common tune.
Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil
Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.
Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)
Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.
Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.
Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.
Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.
Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.
Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.
Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.
Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.
Friday, April 19, 2024, 09:03: VV1 open - venting |
Attachment 1: 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx
|
1005
|
Friday, April 19, 2024, 11:33 |
Dave Neilson | - | LP-FEBIAD | | | 44692-4 | 42972-10 | In progress | Development target test - Calibrated leak - Anode mode | Friday, April 19, 2024, 11:32: assembly installed in test stand. VV1 closed, pumping down
Friday, April 19, 2024, 11:56: TP1A and TP1B on.
Friday, April 19, 2024, 12:34: water cooling on. no effect on vacuum.
Friday, April 19, 2024, 12:34: Argon gas set to 0.5 bar. No effect on vacuum.
Monday, April 22, 2024, 09:24 beginning TGHT TBHT ramp to 440A/290A at 1A/30s. COIL increased to 80A for conditioning. vacuum monitored.
Monday, April 22, 2024, 09:47: vacuum peaks at ~8e-7 T.
Monday, April 22, 2024, 10:49 vacuum recovered and stable at 4.2e-7 T.
Monday, April 22, 2024, 10:49 TGHT TBHT ramp rate toward 440/290 increased to 1.4A/10s. COIL increased to 90A for conditioning. vacuum continues to be closely monitored.
Monday, April 22, 2024, 11:39 TGHT TBHT have reached 440/290. Waiting for vacuum to drop to stable value. Currently at 1.12e-6 T.
Monday, April 22, 2024, 13:10: vacuum stable at 9.9e-7 T
Monday, April 22, 2024, 13:11 increasing bias to 30kV
Monday, April 22, 2024, 14:30 Unintentionally, TBHT had been increased to 230 instead of 290. Increasing to 290.
Monday, April 22, 2024, 14:40. BIAS sparking. Decreasing bias and increasing COIL back to 90A to condition. (spark frequency approximately 1/min)
Monday, April 22, 2024, 15:12 increasing TGHT TBHT to 490/320 for conditioning - monitoring vacuum and bias closely
Monday, April 22, 2024, 15:23 prior to vacuum recovering, bias sparked again. decreasing to 25kV while vacuum recovers.
Monday, April 22, 2024, 15:37 vacuum plateaued at 2.5e-6T
Monday, April 22, 2024, 16:50 Vacuum significantly decreased to ~1.5e-6. increased bias to 30kV to observe argon beam activity. looks normal. data to be collected tomorrow after vacuum down further. Sparks were still observed at 30kV although significantly less frequently. (1/5min)
Monday, April 22, 2024, 16:52 decreasing bias to 0 V
Tuesday, April 23, 2024, 09:24 Vacuum at 9.6e7 T. decreasing COIL to 0, increasing bias to 30 kV
Tuesday, April 23, 2024, 09:51 BIAS at 30kV, no sparks seen.
Tuesday, April 23, 2024, 09:58. Argon gas on. COIL at 40A, ANODE at 200V. Using short mass scan to find Ar-40 peak.
Tuesday, April 23, 2024, 10:33: ran degaussing script in anode mode - measure_id=6018
Tuesday, April 23, 2024, 10:36 COIL set to 80A, ANODE at 340V, BIAS at 29 660 V.
Tuesday, April 23, 2024, 10:37 mass scan
Tuesday, April 23, 2024, 10:57 closed sv4, open sv1. to pump down argon gas lines. then closed sv5 and sv1.
Tuesday, April 23, 2024, 10:57 mass scan
Tuesday, April 23, 2024, 11:19 TGHT TBHT decreased to 440 290
Tuesday, April 23, 2024, 11:35 mass scan
Tuesday, April 23, 2024, 11:49 turned argon gas back on
Tuesday, April 23, 2024, 11:50 mass scan
Tuesday, April 23, 2024, 12:13 decreasing bias to 0 V
Tuesday, April 23, 2024, 12:33 decreasing TGHT TBHT to 100A at 1.4A/10s
Tuesday, April 23, 2024, 13:29 decreasing TGHT TBHT to 0A at 1A/30s
Tuesday, April 23, 2024, 14:13 increasing bias to test HV
Tuesday, April 23, 2024, 15:00 when bias was at ~50kV, epics shut down at the test stand computer. Internet disconnected. there were two sparks over ~10min at 50kV, but there was no spark at the same time as the epics shut down
Tuesday, April 23, 2024, 15:05 It appears that this also actuated BV1B and BV6, then turning off TP1B and TP6 turbo pumps.
Tuesday, April 23, 2024, 15:16: continuing to increase HV remotely, while monitoring closely for any sparks. the HV appears to be stable.
Tuesday, April 23, 2024, 15:20 at 54.6 kV, the bias current rapidly increased from 0.02mA to 0.135mA. There was no decrease in voltage and no accompanying spark. HV was decreased until current dropped, before increasing HV again.
Tuesday, April 23, 2024, 16:01 decreased bias to 0V.
Tuesday, April 23, 2024, 16:01 Turbo pumps restarted.
Wednesday, April 24, 2024, 09:25 TP1B and TP1A off. winding down to begin venting
Wednesday, April 24, 2024, 10:47 VV1 open. venting. |
1006
|
Wednesday, April 24, 2024, 16:21 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | | | Wednesday, April 24, 2024, 16:20: Target assembly installed.
Wednesday, April 24, 2024, 16:20: VV1 closed. Pumping down to rough vacuum
Wednesday, April 24, 2024, 16:21: Water cooling on. Seal on lines confirmed.
Thursday, April 25, 2024, 09:14 TP1A and TP1B on
Thursday, April 25, 2024, 15:45: Vacuum seems to be stalled at 1e-5 T. Resetting turbo pumps has no noticeable effect. TP1B is emitting a soft high pitched tone / ringing. Now venting chamber to reset target assembly and water cooling seals.
|
1007
|
Friday, April 26, 2024, 13:49 |
Aaron Schmidt | TiC#7 | HP-FEBIAD | ITW | TM4 | 45447-5 | 45235-15 | In progress | Conditioning TiC#7 | FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B started.
Friday, April 26, 2024, 14:26: TP1B Green. OK.
Friday, April 26, 2024, 14:30: TP1A on.
Monday, April 29, 2024, 08:44: Vacuum @ 4.58e-07T. Waterline FS#5 open. Vacuum ok.
Monday, April 29, 2024, 08:50: Power / sources on. Tap up check. TGHT / TBHT to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 100 V. Coil to 4 A. Ok. Tap back down.
Monday, April 29, 2024, 10:44: IV4 open.
-BB:
Monday, April 29, 2024, 11:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, April 29, 2024, 11:12: BIAS / EE / EZL @ 40 / -1.8 -2.0 / 17 kV.
Monday, April 29, 2024, 11:19: BIAS / EE / EZL @ 43 / -2.0 / 19 kV.
Monday, April 29, 2024, 11:23: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.
Monday, April 29, 2024, 11:27: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV.
Monday, April 29, 2024, 11:33: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.
Monday, April 29, 2024, 12:05: 30 minutes @ 50 kV. 3 sparks at the very end. 2 inside and 1 outside.
Monday, April 29, 2024, 12:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 4.67e-07T. Start tapping up coil.
Monday, April 29, 2024, 12:32: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.2e-07T
Monday, April 29, 2024, 14:00: Vacuum @ 7.20e-07T (30-60 min depending on whether the out gassing levels or begins to decrease)
Monday, April 29, 2024, 14:02: Coil @ 0 A.
Monday, April 29, 2024, 14:05: Anode @ 100 V.
Monday, April 29, 2024, 14:07: Anode @ 200 V.
Monday, April 29, 2024, 14:09: Anode @ 500 V.
Monday, April 29, 2024, 14:11: Anode @ 0 V.
Monday, April 29, 2024, 14:33: HV @ 0 V.
Monday, April 29, 2024, 14:34: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per minute.
Tuesday, April 30, 2024, 07:18: Auto-ramping TGHT / TBHT to 580 / 290 @ 2A per minute.
Tuesday, April 30, 2024, 13:44: Gas lines purged & refilled with Ar.
Tuesday, April 30, 2024, 13:48: optics set.
Tuesday, April 30, 2024, 13:51: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, April 30, 2024, 13:56: Anode @ 100 V. Coil @ 20 A
Tuesday, April 30, 2024, 13:59: Reset / Cfg MB1
Tuesday, April 30, 2024, 14:40: Initial mass & wire scans complete.
Tuesday, April 30, 2024, 15:07: Argon gas lines purged.
Tuesday, April 30, 2024, 15:07: Mass scan repeated.
Tuesday, April 30, 2024, 15:42: Gas on. Magnet set to 40.1 mass/charge. Anode & coil vs fc6 output optimization scan started. 0-90A coil and 0-400V anode.
Tuesday, April 30, 2024, 15:55: Vacuum is noticeably rising. If it reaches 5e-6T, will terminate the scan.
Tuesday, April 30, 2024, 15:59: rate of increase appears to be slowing and reaching a plateau.
Tuesday, April 30, 2024, 16:01: optimization data at measure_id=6058. image at bottom.
Tuesday, April 30, 2024, 16:03: COIL and anode set to 0. decreasing BIAS/EZL/EE to 0V
Tuesday, April 30, 2024, 16:12: decreasing TGHT TBHT at 1A/30s to 0
Wednesday, May 01, 2024, 09:38: TP1B and TP1A turned off, winding down
Wednesday, May 01, 2024, 10:1: VV1 open, venting. Water cooling off. purged lines
|
1008
|
Thursday, May 02, 2024, 13:45 |
Dave Neilson | - | LP-SIS | | | 44691-8 | 45235-26 | In progress | Mass marker testing | Wednesday, May 01, 2024, 12:44: pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: TP1A on.
Thursday, May 02, 2024, 9:10: water cooling on. no effect on vacuum
Thursday, May 02, 2024, 10:02: TGHT and TBHT heating to 100A/100A at 1A/30s
Thursday, May 02, 2024, 11:02: TGHT and TBHT heating to 230A/230A at 1.4A/10s
Thursday, May 02, 2024, 13:53: increasing BIAS to 30kV, EE to 2500V, EZL to 13kV
Thursday, May 02, 2024, 14:11: increasing TGHT to 280A.
Thursday, May 02, 2024, 14:18 seeing a few sparks decreasing BIAS temporarily
Thursday, May 02, 2024, 14:25 sparks continued. decreased TGHT to 260A and saw them subside. increasing bias again.
Thursday, May 02, 2024, 14:42 conducting mass scan - 2024-05-02-15-05 mm LPSIS a.txt
Thursday, May 02, 2024, 15:09 increased COIL to 20A. mass scan repeated. 2024-05-02-15-37 mm LPSIS b.txt
Thursday, May 02, 2024, 15:38 decreasing TGHT to 230A, COIL at 0A
Thursday, May 02, 2024, 15:43: repeating mass scan. 2024-05-02-16-09 mm LPSIS c.txt * no signal. very unexpected.
Thursday, May 02, 2024, 16:10: increased COIL to 20A, repeating mass scan. 2024-05-02-16-35 mm LPSIS d.txt
Thursday, May 02, 2024, 16:35 decreasing BIAS, EE, EZL to 0V
Thursday, May 02, 2024, 16:50 increasing TGHT to 290A at 1A/30s, to be left hot overnight.
Friday, May 03, 2024, 10:26 increasing BIAS to 30kV, EE to 2500V, EZL to 13kV
Friday, May 03, 2024, 10:50 conducting mass scan, COIL at 0A - 2024-05-03-11-19 mm LPSIS e.txt
Friday, May 03, 2024, 11:19 increasing COIL to 20A. repeating mass scan - 2024-05-03-11-47 mm LPSIS f.txt
Friday, May 03, 2024, 11:47 increasing COIL to 40A. repeating mass scan - 2024-05-03-12-21 mm LPSIS g.txt
Friday, May 03, 2024, 12:22 decreasing TGHT to 260A.
Friday, May 03, 2024, 12:32 mass scan: - 2024-05-03-12-59 mm LPSIS g.txt <- accidentally labeled g. cannot change
Friday, May 03, 2024, 13:01 decreased COIL to 20A. mass scan: 2024-05-03-13-30 mm LPSIS i.txt
Friday, May 03, 2024, 13:31 decreased COIL to 0A. mass scan: 2024-05-03-13-59 mm LPSIS j.txt
Friday, May 03, 2024, 14:01 reducing TGHT to 230A. mass scan: 2024-05-03-14-37 mm LPSIS k.txt
Friday, May 03, 2024, 14:38 increasing coil to 20A. mass scan: 2024-05-03-15-14 mm LPSIS l.txt
Friday, May 03, 2024, 15:15 increasing coil to 40A. mass scan: 2024-05-03-15-42 mm LPSIS m.txt
Friday, May 03, 2024, 15:43 COIL -> 0A. decreasing EE EZL BIAS to 0V.
Friday, May 03, 2024, 15:59 decreasing TGHT and TBHT to 0A at 1A/30s
|
1009
|
Friday, May 17, 2024, 17:24 |
Brady Borrmann | UC# | LP-FEBIAD | ITE | | 44692-4 | 45235-18 | In progress | Conditioning Spare Development Target | Friday, May 17, 2024, Spare FEBIAD Development target installed
Friday, May 17, 2024, 17:00: Roughing
Friday, May 17, 2024, 17:38: TP1B started.
Friday, May 17, 2024, 17:43 TP1B Green. OK.
Friday, May 17, 2024, 17:46 : TP1A on.
Friday, May 17, 2024, 17:54 : TP1A Green. OK.
|
|