  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage

 Saturday, August 29, 2015, 15:50: Turbos started

  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure

 e-fault submitted and vacuum group (Edi) notified.

Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group

  465   Friday, September 18, 2015, 11:35 Anders Mjos      Problems/SolutionsTMS:TP6 nor working

found in fault state this morning. Edi consulted and fault report submitted.

  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange

 Friday, October 02, 2015, 08:35: Turbo stopped

  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed out

Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.

  472   Wednesday, October 14, 2015, 16:13 Anders Mjos      Problems/SolutionsTMS:RP2 replaced

 by vacuum group. The pump was making more noise than usual.

  473   Thursday, October 15, 2015, 11:19 Anders Mjos      Problems/SolutionsRight side TGHT connector block removed

The keensert has been worn out and will be replaced.

The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged).

Attachment 1: Photo_2015-10-16_11_57_45_AM.jpg
Photo_2015-10-16_11_57_45_AM.jpg
Attachment 2: Photo_2015-10-16_11_57_51_AM.jpg
Photo_2015-10-16_11_57_51_AM.jpg
  475   Monday, October 19, 2015, 09:45 Anders Mjos      Problems/SolutionsIG1 filament dead

Will went chamber to replace the filament.

See e-fault 8501 

Monday, October 19, 2015, 09:43: turbos stopped

Monday, October 19, 2015, 10:19: Venting

Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.

Monday, October 19, 2015, 15:36: Roughing

Monday, October 19, 2015, 16:05: Turbos started

Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)


Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine.

  476   Monday, October 19, 2015, 15:39 Anders Mjos      Problems/SolutionsExhaust came off the new RP2

Anders Mjos wrote:

 by vacuum group. The pump was making more noise than usual.

 It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.

Vacuum group has been notified and will ask plant group to investigate.


Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps.

  477   Monday, November 02, 2015, 12:47 Anders Mjos      Problems/SolutionsRemoved Swagelok T from rioght TGHT water lines

Mico replaced the T's with copper tube and leak checked.

Monday, November 02, 2015, 12:46: Roughing

Monday, November 02, 2015, 13:19: Starting turbos

Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on


Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.

Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA

  480   Tuesday, November 17, 2015, 11:27 Anders Mjos      Problems/SolutionsRan RP2 with gas ballast for 15 min

To recover performance

Attachment 1: 2015-11-17_RP2_performance.png
2015-11-17_RP2_performance.png
  481   Wednesday, December 02, 2015, 14:50 Anders Mjos      Problems/SolutionsNitrogen supply for venting temporarely from bottle

No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply is returned.


Monday, January 11, 2016

Nitrogen supply from ISIS restored and reconnected.

  483   Friday, December 18, 2015, 11:44 Anders Mjos      Problems/SolutionsIG6 not reading correctly

The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.

Friday, December 18, 2015, 14:40: EPICS updated and restarted.

  484   Wednesday, January 06, 2016, 09:28 Anders Mjos      Problems/SolutionsWater leak fixed on flow sensor for HS circuit

 The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650

  486   Monday, January 18, 2016, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 nor performing

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

  487   Monday, January 18, 2016, 15:38 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

Attachment 1: 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
  488   Tuesday, January 19, 2016, 18:34 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

 Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.