ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  103   Monday, June 04, 2012, 10:51 Anders MjosTa#38LP-SISITWTM1  DoneVenting chamber

Aurelia Laxdal wrote:

Did the HV conditioning.

Heaters conditioning in progress.

The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.

Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.

Started cool-down.

 Monday, June 04, 2012, 10:51: Turbos switched off

Monday, June 04, 2012, 11:06: Purging water. Venting.

Monday, June 04, 2012, 11:36: Target removed

  662   Thursday, May 24, 2018, 08:38 Anders Mjos      Problems/SolutionsVenting beamline for IG6 replacement

Thursday, May 24, 2018, 08:38: TPs stopped

Thursday, May 24, 2018, 09:18: Venting

Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down

  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange

 Friday, October 02, 2015, 08:35: Turbo stopped

  282   Tuesday, March 19, 2013, 09:04 Anders Mjos      Problems/SolutionsVenting TMS section for replacement of TP2 by vacuum group

 

Anders Mjos wrote:

Tuesday, February 26, 2013, 08:24: Started turbo

Tuesday, February 26, 2013, 08:24: Turbo timed out

e-fault 6585 submitted

 

Edi called to inform that he can replace the turbo today.

Tuesday, March 19, 2013, 09:03: Stopped TP6

Tuesday, March 19, 2013, 09:35: Venting

Tuesday, March 19, 2013, 09:48 : TMS section and backing line vented


The turbo pump has been replaced see

https://elog.triumf.ca/TIS/Test-Stand/284

Some heat marks were observed on the turbo pump that was replaced. Vacuum group took pictures.

 

  178   Thursday, August 23, 2012, 10:11 Anders Mjos      In progressVenting - installation of NiO#1

Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7

Thursday, August 23, 2012, 10:10: Stopped both turbos.

Thursday, August 23, 2012, 10:20: Water purged.

Thursday, August 23, 2012, 10:53: Venting

  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator training

Thursday, September 20, 2012, 14:24: Turbos off

Thursday, September 20, 2012, 15:20: Venting

  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

  142   Thursday, July 12, 2012, 09:44 Anders Mjos      In progressVenting

System will be vented and gas lines purged with air, then nitrogen.

Thursday, July 12, 2012, 09:43: Shut down TSGTP1B.

  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVenting

Wednesday, September 12, 2012, 08:01: Turbos off

Wednesday, September 12, 2012, 13:35: Venting, water off and purged.

Wednesday, September 12, 2012, 13:55: Vented

  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVenting

Target cooled down. Power supplies off.

Friday, September 14, 2012, 15:27: Turbos off.

Friday, September 14, 2012, 15:32: Water purged.

 Friday, September 14, 2012, 16:00: Venting

Friday, September 14, 2012, 16:26: Vented

  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVenting

Thursday, December 13, 2012, 08:38: TBHT and TGHT off

Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T

Thursday, December 13, 2012, 08:38 : Turbos off

Thursday, December 13, 2012, 11:19: Venting

Thursday, December 13, 2012, 11:30: Water lines purged

Thursday, December 13, 2012, 11:41: Target removed for inspection.

  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      Venting

Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target

  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

Sebastian Raeder wrote:

Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target

Friday, December 14, 2012, 15:27 : Venting

  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting

 Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T

Wednesday, January 09, 2013, 13:24 : Venting with nitgogen

Wednesday, January 09, 2013, 14:12: Target removed

  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVenting

Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today

  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting

 For conductor bolt work

Monday, January 28, 2013, 12:56: Turbos off

Monday, January 28, 2013, 14:18: Venting

  370   Friday, April 04, 2014, 08:24 Anders MjosTiC#4HP-SISITETM3  In progressVenting

 

Aurelia Laxdal wrote:

HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.

 

Friday, April 04, 2014, 08:23: Target bias, EE and EZL to zero. Turbos off.

Friday, April 04, 2014, 10:14: Venting 

Friday, April 04, 2014, 10:48: Target removed - By R.M.

  393   Friday, July 18, 2014, 08:19 Anders Mjos       Venting

Friday, July 18, 2014, 08:19: Stopped turbos

Friday, July 18, 2014, 10:58: Venting

  461   Wednesday, September 09, 2015, 08:54 Anders Mjos      In progressVenting

 Wednesday, September 09, 2015, 08:53: Turbos stopped


Friday, September 11, 2015: Vented