    Reply  Monday, June 04, 2012, 10:51, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , Done, Venting chamber 


    
        
            Aurelia Laxdal wrote:
        
        
            
            Did the HV conditioning.
Entry  Thursday, May 24, 2018, 08:38, Anders Mjos, , , , , , , Problems/Solutions, Venting beamline for IG6 replacement 
Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down
Entry  Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange 
 Friday, October 02, 2015, 08:35: Turbo stopped
    Reply  Tuesday, March 19, 2013, 09:04, Anders Mjos, , , , , , , Problems/Solutions, Venting TMS section for replacement of TP2 by vacuum group 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Thursday, August 23, 2012, 10:11, Anders Mjos, , , , , , , In progress, Venting - installation of NiO#1 
Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7
Thursday, August 23, 2012, 10:10: Stopped both turbos.
Thursday, August 23, 2012, 10:20: Water purged.
Entry  Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training 
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting
    Reply  Monday, October 03, 2011, 13:56, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Venting 


    
        
            Aurelia Laxdal wrote:
        
        
            
            Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum
Entry  Thursday, July 12, 2012, 09:44, Anders Mjos, , , , , , , In progress, Venting 
System will be vented and gas lines purged with air, then nitrogen.
Thursday, July 12, 2012, 09:43: Shut down TSGTP1B.
Entry  Wednesday, September 12, 2012, 08:02, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Venting 
Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented
Entry  Friday, September 14, 2012, 15:27, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Venting 
Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27: Turbos off.
Friday, September 14, 2012, 15:32: Water purged.
Entry  Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting 
 
Entry  Thursday, December 13, 2012, 08:40, Anders Mjos, RFQ empty, , , , , , In progress, Venting 
Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off
Entry  Friday, December 14, 2012, 14:24, Sebastian Raeder, RFQ empty, , , , , , , Venting 
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
    Reply  Friday, December 14, 2012, 15:28, Anders Mjos, RFQ empty, , , , , , In progress, Venting 


    
        
            Sebastian Raeder wrote:
        
        
            
            Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
Entry  Wednesday, January 09, 2013, 10:39, Anders Mjos, RFQ empty, , , , , , In progress, Venting 
 Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed
Entry  Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting 
Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today
Entry  Monday, January 28, 2013, 12:56, Anders Mjos, Empty, , , , , , , Venting 
 For conductor bolt work
Monday, January 28, 2013, 12:56: Turbos off
Monday, January 28, 2013, 14:18: Venting
    Reply  Friday, April 04, 2014, 08:24, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Venting 
 

    
        
            Aurelia Laxdal wrote:
        
        
            
Entry  Friday, July 18, 2014, 08:19, Anders Mjos, , , , , , , , Venting 
Friday, July 18, 2014, 08:19: Stopped turbos
Friday, July 18, 2014, 10:58: Venting
Entry  Wednesday, September 09, 2015, 08:54, Anders Mjos, , , , , , , In progress, Venting 
 Wednesday, September 09, 2015, 08:53: Turbos stopped

Friday, September 11, 2015: Vented