571
|
Tuesday, February 21, 2017, 10:35 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Water leak (E)(G) | Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water |
|
919
|
Wednesday, April 13, 2022, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak | Wednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already |
|
418
|
Tuesday, December 23, 2014, 09:08 |
Anders Mjos | | | | | | | | Water closed for Christmas | Shutting of water supply to the source
box. Water not needed. |
|
88
|
Tuesday, May 15, 2012, 08:16 |
Rick Maharaj | | | | | | | | Water circuits flushed | |
|
678
|
Tuesday, August 14, 2018, 11:03 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | 42752-6 | | Voltage Tests (Ta target) | Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: |
|
680
|
Wednesday, August 22, 2018, 15:20 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | | | Voltage Tests (Ta Target) | Wires reconfigured / set
Wednesday, August 22, 2018, 13:10:
Roughing. |
|
316
|
Thursday, June 13, 2013, 11:04 |
Anders Mjos | | | | | | | Problems/Solutions | Viton seals on vacuum chamber doors replaced | See PO# TR193650 |
|
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines | Venting chamber and purging cooling lines
in preparation for target removal |
|
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
|
|
191
|
Friday, August 31, 2012, 11:39 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | Done | Venting vacuum chamber - source change | Friday, August 31, 2012, 11:39: Stopped
turbos.
Friday, August 31, 2012, 13:06: Venting. |
|
171
|
Thursday, August 16, 2012, 15:30 |
Anders Mjos | | | | | | | Problems/Solutions | Venting to investigate short between anode - cathode | Thursday, August 16, 2012, 15:29: Turbos
off
Thursday, August 16, 2012, 15:50 |
|
151
|
Thursday, July 19, 2012, 09:35 |
Anders Mjos | | | | | | | Done | Venting to investigate leak on front door | Thursday, July 19, 2012, 09:35: Switched
off both turbos.
Thursday, July 19, 2012, 10:23: Venting |
|
356
|
Friday, January 24, 2014, 10:49 |
Anders Mjos | | | | | | | Problems/Solutions | Venting the optics section to investigate Emittance Rig installation | Friday, January 24, 2014, 10:49 : Stopped
turbos. Vacuum at 2.5E-7 T
Friday, January 24, 2014, 12:52: |
|
230
|
Monday, November 05, 2012, 13:26 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | Venting the Test Stand | Venting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. |
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand | Venting for target exchange |
|
100
|
Thursday, May 31, 2012, 14:46 |
Anders Mjos | | | | | | | | Venting in preparation for Ta#38 | Thursday, May 31, 2012, 14:46: Switching
off turbos
Thursday, May 31, 2012, 15:05: Venting |
|
235
|
Thursday, November 29, 2012, 14:15 |
Anders Mjos | | | | | | | In progress | Venting in preparation for RFQ work | Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57: |
|
861
|
Wednesday, March 10, 2021, 11:10 |
Carla Babcock | | | | | | | | Venting for installation of emittance meters | Wednesday, March 10, 2021, 10:48
: Venting beamline section only for installation
of emittance meters. |
|
81
|
Thursday, May 10, 2012, 08:13 |
Anders Mjos | | | | | | | Problems/Solutions | Venting for TSGIG1 repair |
|
|
222
|
Thursday, October 25, 2012, 11:13 |
Anders Mjos | Test | HP-FEBIAD | | | | | In progress | Venting chamber for installation of TiC#3 | Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T