Entry  Tuesday, February 21, 2017, 10:35, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Water leak (E)(G) 
Water leak found on water block lines (E) & (G) on FS #3.
Both lines were removed at the water blocks and the coil connection at the heat shield. They ends were blanked off.
Tuesday, February 21, 2017, 10:32: Roughing
Entry  Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak 
Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).
Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.
Entry  Tuesday, December 23, 2014, 09:08, Anders Mjos, , , , , , , , Water closed for Christmas 
Shutting of water supply to the source box. Water not needed.
Entry  Tuesday, May 15, 2012, 08:16, Rick Maharaj, , , , , , , , Water circuits flushed 
 
Entry  Tuesday, August 14, 2018, 11:03, Aaron Schmidt, , LP-SIS, , , 41177-3, 42752-6, , Voltage Tests (Ta target) 
Tuesday, August 14, 2018, 10:55: Auto ramping TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: TGHT @ 40 A. Display @ 0.198 V. PS @ 0.18 V. Multimeter @ 033 mV.
Tuesday, August 14, 2018, 11:09: Auto ramping TGHT @ 6 A per min to 80 A.
Entry  Wednesday, August 22, 2018, 15:20, Aaron Schmidt, , LP-SIS, , , 41177-3, , , Voltage Tests (Ta Target)  
 Wires reconfigured / set 
Wednesday, August 22, 2018, 13:10: Roughing. 
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Entry  Thursday, June 13, 2013, 11:04, Anders Mjos, , , , , , , Problems/Solutions, Viton seals on vacuum chamber doors replaced 
See PO# TR193650 
Entry  Monday, April 16, 2012, 11:16, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , In progress, Venting, purging cooling lines 
Venting chamber and purging cooling lines in preparation for target removal
    Reply  Monday, April 16, 2012, 11:56, Anders Mjos, Nb#6, LP-SIS, ITW, TM1, , , In progress, Venting, purging cooling lines 


    
        
            Anders Mjos wrote:
        
        
            
            Venting chamber and purging cooling lines in preparation for target removal
Entry  Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change 
Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Entry  Thursday, August 16, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Venting to investigate short between anode - cathode 
Thursday, August 16, 2012, 15:29: Turbos off
Thursday, August 16, 2012, 15:50 : Venting
Entry  Thursday, July 19, 2012, 09:35, Anders Mjos, , , , , , , Done, Venting to investigate leak on front door 
Thursday, July 19, 2012, 09:35: Switched off both turbos.
Thursday, July 19, 2012, 10:23: Venting
 
Entry  Friday, January 24, 2014, 10:49, Anders Mjos, , , , , , , Problems/Solutions, Venting the optics section to investigate Emittance Rig installation 
Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T 
Friday, January 24, 2014, 12:52: Venting
Finished evaluating emittance rig installation.
Entry  Monday, November 05, 2012, 13:26, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, Venting the Test Stand 
Venting the Test Stand.
TiC#3 will be ready to be removed in few minutes. 
Please note: water is still ON.
Entry  Friday, March 02, 2012, 13:28, Anders Mjos, FEBIAD test, , , , , , , Venting test stand 
Venting for target exchange
Entry  Thursday, May 31, 2012, 14:46, Anders Mjos, , , , , , , , Venting in preparation for Ta#38 
Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting
Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 
 Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting
Entry  Wednesday, March 10, 2021, 11:10, Carla Babcock, , , , , , , , Venting for installation of emittance meters 
Wednesday, March 10, 2021, 10:48  : Venting beamline section only for installation of emittance meters.
    Reply  Thursday, May 10, 2012, 08:13, Anders Mjos, , , , , , , Problems/Solutions, Venting for TSGIG1 repair 


    
        
            Anders Mjos wrote:
        
        
            
            
            
Entry  Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3 
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting