Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 53 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka        

  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.

 

  1043   Friday, December 20, 2024, 09:37 Dave Neilson       Winter holiday shutdown

Friday, December 20, 2024, 09:37    turned off all 4 turbopumps. winding down prior to evacuating.

Friday, December 20, 2024, 11:43 Purged and closed all water cooling lines.

Friday, December 20, 2024, 15:54   removed target and installed Uline.

 roughing down test stand 

Friday, December 20, 2024, 16:17    valves closed and roughing pump off. 

Friday, December 20, 2024, 16:17   shut down test stand computer for holiday break 

ELOG V2.9.2-2455