Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target. |
Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Anders Mjos wrote: |
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target.
|
See attachment#1: 9-pin-connector.jpg |
Friday, September 23, 2011, 16:42, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Target ready to be heated
|
Friday, September 23, 2011, 16:4: Target installed and roughing started.
Friday, September 23, 2011, 17:12: Started turbo pumps.
Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.
Monday, September 26, 2011, 09:00: Venting for leak check.
Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.
Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target heater cooling line to prevent short with cooling line for FEBIAD coil.
Monday, September 26, 2011, 12:47: Started turbo pumps.
Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated. |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Tuesday, September 20, 2011, 19:00, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Done, Finished testing TaC#1
|
Tuesday, September 20, 2011:
Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt
Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand.
Wednesday, September 21, 2011:
Turned off the HV & optics.
Target is ready to be removed. Currently, it's under vacuum and the water is still on.
|
Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.
|
Heaters conditioning went fine: 580A and 230A.
Did a mass scan:
Plotdump-local-clean.txt Sept19 11 12-45-22.txt
Set for Li-7 for over the night on TMS:FC6. |
Friday, September 16, 2011, 12:39, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, HV conditioning
|
Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V. |
Thursday, September 15, 2011, 13:46, Anders Mjos, FEBIAD Test, HP-FEBIAD, , , , , Failed, FEBIAD Broken Tube
|
See attached file for photos of the broken tube |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down.
|
Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. |
Wednesday, September 14, 2011, 15:33, John Wong, Test#1, HP-SIS, ITW, TM1, test, test, In progress, testing elog for test stand
|
Wednesday, September 14, 2011, 15:33
blah blah blah... |
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
|