Entry  Monday, July 09, 2012, 12:57, Anders Mjos, , , , , , , Done, Vented 
 
Entry  Monday, July 09, 2012, 11:14, Aurelia Laxdal, , , , , , , , Test Stand status 
Restarted the PC at the Test Stand.
Restarted the Archivers; currently pumping down the separator area.
Entry  Friday, July 06, 2012, 15:36, Friedhelm Ames, , , , , , , Done, switched everything off 
switched everything off to prepare for scheduled power outage on Monday
Entry  Friday, July 06, 2012, 11:18, Friedhelm Ames, , , , , , , , TSG:TP1B off source off again. 
turbo pump TSG:TP1B has tripped off. Cannot be restarted. Fault report to vacuum. Everything switched off again
 
Entry  Friday, July 06, 2012, 11:05, Friedhelm Ames, , , , , , , , start source again 
heater ramping up again with Ne leak closed.
Entry  Friday, July 06, 2012, 11:04, Friedhelm Ames, , , , , , , , source tripped off over night 
A big vacuum excursion tripped the source off at about 1am. The vacuum did not fully recover afterwards only down to about 1.3e-6T. Ne leak has been
closed and vacuum went down to 6e-7T within a few minutes. After the trip the current of the magnet stayed constant. Fluctuations may have been caused
by high voltage sparks.
Entry  Thursday, July 05, 2012, 18:02, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current TMSMB1_2012_07_05.PNG
The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam
current at Fc6.
    Reply  Thursday, July 05, 2012, 18:10, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current 


    
        
            Friedhelm Ames wrote:
        
        
            
            The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall
Entry  Thursday, July 05, 2012, 11:00, Friedhelm Ames, , , , , , , In progress, source started up again 
tube heater ramping started
Entry  Thursday, July 05, 2012, 10:59, Friedhelm Ames, , , , , , , Problems/Solutions, water tripping in front of HV power supplies 
Found some water tripping in front of the high voltage power supplies rack from the water lines at the ceiling. Plastic sheets have been put on top of
the racks and MCR has been informed.
Entry  Wednesday, July 04, 2012, 15:37, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Pumping down  photo_8.jpg
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit.
(see attachment)
    Reply  Thursday, July 05, 2012, 08:41, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Water opened - reduced flow heat shield 


    
        
            Anders Mjos wrote:
        
        
            
            Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG


    
        
            Friedhelm Ames wrote:
        
        
            
            A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater
Entry  Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped 
turbo pumps stopped to prepare for venting for anode short investigation.
    Reply  Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps stopped to prepare for venting for anode short investigation.
Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 
purged Ne line and started cathode heater ramp up to 295 A
Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 


    
        
            Friedhelm Ames wrote:
        
        
            
            mass spectrum saved as
Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 
start mass scan to do new mass calibration
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 
 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A.
Entry  Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght. 
 
Entry  Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test. 
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
 
Entry  Thursday, June 28, 2012, 15:14, Aurelia Laxdal, , LP-FEBIAD, , , , , , Quick check 
Just a quick check at the Test Stand:
1. The system operational (  white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.