  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater    
  120   Friday, June 29, 2012, 16:39 Friedhelm Ames       mass scan finished

    

       
            
  
  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over nightA big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T.
  
  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source againheater ramping up again with Ne leak closed.   
  134   Friday, July 06, 2012, 11:18 Friedhelm Ames       TSG:TP1B off source off again.turbo pump TSG:TP1B has tripped off. Cannot
be restarted. Fault report to vacuum. Everything
switched off again
  
  136   Monday, July 09, 2012, 11:14 Aurelia Laxdal       Test Stand statusRestarted the PC at the Test Stand.
Restarted the Archivers; currently
pumping down the separator area.
  
  146   Thursday, July 12, 2012, 15:49 Anders Mjos       test stand vented for TP1A replacementsee e-fault 6142   
  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIADWaiting Rick for the fitting on the vacuum
pump.
  
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump1524H Start small pump.
1529H stop the pump.
 
  
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 VThe ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0.
  
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   
  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started    
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator trainingDid the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
  
  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS StartupDid the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress.
  
  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)The TSH:TGHT stopped at 263.7A, but the
setpoint is still ramping (now  at 421A).
The voltage is set correctly: have 6.238V
  
  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Normal
0




false
false
false
  
  233   Monday, November 19, 2012, 10:20 Aurelia LaxdalTest-SiCHP-FEBIAD     Preparations for E-Fault#6389 investigationsPrepared the Test Stand for Controls to
investigate E-Fault#6389.
  
  234   Thursday, November 22, 2012, 12:52 Aurelia LaxdalTest-SiCHP-FEBIAD     E-Fault#6389 re-directed to PSEvgeniy and Kazuya investigated the problem
with TSH:TGHT readbacks and they came to
the conclusion that the PS is faulty, and
  