ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
 |
|
99
|
Thursday, May 17, 2012, 15:14 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, May 17, 2012, 15:14: Started
roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting |
|
|
100
|
Thursday, May 31, 2012, 14:46 |
Anders Mjos | | | | | | | | Venting in preparation for Ta#38 | Thursday, May 31, 2012, 14:46: Switching
off turbos
Thursday, May 31, 2012, 15:05: Venting |
|
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating | The ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V |
|
|
113
|
Thursday, June 28, 2012, 15:14 |
Aurelia Laxdal | | LP-FEBIAD | | | | | | Quick check | Just a quick check at the Test Stand:
1. The system operational (
white out not present ) with TSH:TBHT heating |
|
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan | start mass scan to do new mass calibration |
|
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished | mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
|
|
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater | |
|
|
120
|
Friday, June 29, 2012, 16:39 |
Friedhelm Ames | | | | | | | | mass scan finished |
|
|
|
132
|
Friday, July 06, 2012, 11:04 |
Friedhelm Ames | | | | | | | | source tripped off over night | A big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T. |
|
|
133
|
Friday, July 06, 2012, 11:05 |
Friedhelm Ames | | | | | | | | start source again | heater ramping up again with Ne leak closed. |
|
|
134
|
Friday, July 06, 2012, 11:18 |
Friedhelm Ames | | | | | | | | TSG:TP1B off source off again. | turbo pump TSG:TP1B has tripped off. Cannot
be restarted. Fault report to vacuum. Everything
switched off again |
|
|
136
|
Monday, July 09, 2012, 11:14 |
Aurelia Laxdal | | | | | | | | Test Stand status | Restarted the PC at the Test Stand.
Restarted the Archivers; currently
pumping down the separator area. |
|
|
146
|
Thursday, July 12, 2012, 15:49 |
Anders Mjos | | | | | | | | test stand vented for TP1A replacement | see e-fault 6142 |
|
|
155
|
Thursday, August 09, 2012, 13:08 |
Pierre Bricault | | | | | | | | Test FEBIAD | Waiting Rick for the fitting on the vacuum
pump. |
|
|
159
|
Friday, August 10, 2012, 14:08 |
Rick Maharaj | | | | | | | | Gas line pump | Gas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed |
|
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
|
161
|
Friday, August 10, 2012, 15:57 |
Pierre Bricault | | | | | | | | | Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok |
|
|
163
|
Saturday, August 11, 2012, 16:18 |
Pierre Bricault | | | | | | | | Test FEBIAD anode biased at 120 V | The ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0. |
|
|
194
|
Thursday, September 06, 2012, 09:23 |
Friedhelm Ames | NB#7 | | | | | | | | start high voltage and heaters |
|
|
203
|
Thursday, September 13, 2012, 13:05 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | | heater ramping up started | |
|