  Test-Stand, Page 41 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamberThursday, May 17, 2012, 15:14: Started
roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting
  
  100   Thursday, May 31, 2012, 14:46 Anders Mjos       Venting in preparation for Ta#38Thursday, May 31, 2012, 14:46: Switching
off turbos
Thursday, May 31, 2012, 15:05: Venting
  
  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heatingThe ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V
  
  113   Thursday, June 28, 2012, 15:14 Aurelia Laxdal LP-FEBIAD     Quick checkJust a quick check at the Test Stand:
1. The system operational ( 
white out not present ) with TSH:TBHT heating
  
  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scanstart mass scan to do new mass calibration   
  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finishedmass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


 mass_spectrum_2012_06_29.PNG 
  119   Friday, June 29, 2012, 15:03 Friedhelm Ames       start ramping down heater    
  120   Friday, June 29, 2012, 16:39 Friedhelm Ames       mass scan finished

    

       
            
  
  132   Friday, July 06, 2012, 11:04 Friedhelm Ames       source tripped off over nightA big vacuum excursion tripped the source
off at about 1am. The vacuum did not fully
recover afterwards only down to about 1.3e-6T.
  
  133   Friday, July 06, 2012, 11:05 Friedhelm Ames       start source againheater ramping up again with Ne leak closed.   
  134   Friday, July 06, 2012, 11:18 Friedhelm Ames       TSG:TP1B off source off again.turbo pump TSG:TP1B has tripped off. Cannot
be restarted. Fault report to vacuum. Everything
switched off again
  
  136   Monday, July 09, 2012, 11:14 Aurelia Laxdal       Test Stand statusRestarted the PC at the Test Stand.
Restarted the Archivers; currently
pumping down the separator area.
  
  146   Thursday, July 12, 2012, 15:49 Anders Mjos       test stand vented for TP1A replacementsee e-fault 6142   
  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIADWaiting Rick for the fitting on the vacuum
pump.
  
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump1524H Start small pump.
1529H stop the pump.
 
  
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 VThe ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0.
  
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   
  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started    