  65   Thursday, March 08, 2012, 18:32 Friedhelm Ames       mass scan crashed due to a network errormass scan crashed due to a network error
will be restarted tomorrow
  
  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finishedmass scan is finished and saved see attached.  Nb6_mass_spectrum.docx 
  68   Friday, March 09, 2012, 13:30 Friedhelm AmesNB#6      heater ramping downFc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down
  
  69   Friday, March 09, 2012, 17:25 Friedhelm Ames       heaters and HV power supplies offheaters and HV power supplies have been
switched off
IG1 5.1e-9 T.
  
  71   Wednesday, April 11, 2012, 09:34 Friedhelm Ames       turbopumps in mass separator section startedturbopumps in mass separator section started
after power outages
  
  78   Thursday, April 26, 2012, 09:14 Anders Mjos       removed Al(CH3)3

    

       
            
  
  83   Monday, May 14, 2012, 15:36 Aurelia Laxdal       Test Stand - IOC rebootDid a local IOC reboot to cure to white-out.
The test stand is now operational.
  
  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test StandRick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down.
  
  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos offTarget needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits
  
  87   Tuesday, May 15, 2012, 08:15 Rick Maharaj       Test Stand chamber venting    
  88   Tuesday, May 15, 2012, 08:16 Rick Maharaj       Water circuits flushed    
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed    
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started    
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling downToday: did a mass scan at 580A on TGHT
and 230A on TBHT at 30kV. Found some A/q
units discrepancies on the mass scan page.
  
  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamberThursday, May 17, 2012, 15:14: Started
roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting
  
  100   Thursday, May 31, 2012, 14:46 Anders Mjos       Venting in preparation for Ta#38Thursday, May 31, 2012, 14:46: Switching
off turbos
Thursday, May 31, 2012, 15:05: Venting
  
  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heatingThe ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V
  
  113   Thursday, June 28, 2012, 15:14 Aurelia Laxdal LP-FEBIAD     Quick checkJust a quick check at the Test Stand:
1. The system operational ( 
white out not present ) with TSH:TBHT heating
  
  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scanstart mass scan to do new mass calibration   
  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finishedmass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


 mass_spectrum_2012_06_29.PNG 