  Test-Stand, Page 40 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  65   Thursday, March 08, 2012, 18:32 Friedhelm Ames       mass scan crashed due to a network error

mass scan crashed due to a network error will be restarted tomorrow

  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finished

mass scan is finished and saved see attached.

Attachment 1: Nb6_mass_spectrum.docx
  68   Friday, March 09, 2012, 13:30 Friedhelm AmesNB#6      heater ramping down

Fc0 23 nA

IG1 9.9e-7 T

start automatic heater ramping down

  69   Friday, March 09, 2012, 17:25 Friedhelm Ames       heaters and HV power supplies off

heaters and HV power supplies have been switched off

IG1 5.1e-9 T.

  71   Wednesday, April 11, 2012, 09:34 Friedhelm Ames       turbopumps in mass separator section started

turbopumps in mass separator section started after power outages

  78   Thursday, April 26, 2012, 09:14 Anders Mjos       removed Al(CH3)3

Friedhelm Ames wrote:

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

 The bottle with Al(CH3)3 was removed from the test stand yesterday April 25.

comments in e-mail from Marik:

Anders & I took the Al(CH3)3 bottle out of the test stand & put it in the middle fume hood of lab 07.  There was some puffs of white "smoke" when Anders unscrewed the VCR coupling.  Likely some trapped liquid that oxidized on air exposure.  If at all possible, I would suggest a vertical orientation in the Faraday cage.

-Marik 

  83   Monday, May 14, 2012, 15:36 Aurelia Laxdal       Test Stand - IOC reboot

Did a local IOC reboot to cure to white-out. The test stand is now operational.

  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test Stand

Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down.

  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos off

Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed.

  87   Tuesday, May 15, 2012, 08:15 Rick Maharaj       Test Stand chamber venting
  88   Tuesday, May 15, 2012, 08:16 Rick Maharaj       Water circuits flushed
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling down

Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem:  under investigations.

Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575

Started the cool down.

  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamber

Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.

Thursday, May 17, 2012, 16:52: Starting turbos.

Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.

  100   Thursday, May 31, 2012, 14:46 Anders Mjos       Venting in preparation for Ta#38

Thursday, May 31, 2012, 14:46: Switching off turbos

Thursday, May 31, 2012, 15:05: Venting

  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heating

The ISAC test stand is ready for cathode heating.

Bias voltage: 30000 V

Bias current: 37 microAmp

Anode bias: 200 V

Anode current: 6.105 mA

Cathode current: 0 Amp

Cathode voltage: 0 V

Coil current: 30 A

Coil Voltage 0.2 V

EE Voltage: 1800 V

EE current: 30 microAmp

Einzel Lens voltage: 14000 V

Einzel lens current: 49 microAmp.

  113   Thursday, June 28, 2012, 15:14 Aurelia Laxdal LP-FEBIAD     Quick check

Just a quick check at the Test Stand:

1. The system operational (  white out not present ) with TSH:TBHT heating in progress.

2. Started the Archivers: for Source and Optics.

3. Removed bypass on TSH:SV5 since it's not necessary anymore.

4. Currently: TSH:TBHT=107A

  117   Friday, June 29, 2012, 13:39 Friedhelm Ames       start mass scan

start mass scan to do new mass calibration

  118   Friday, June 29, 2012, 15:02 Friedhelm Ames       mass scan finished

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt

Attachment 1: mass_spectrum_2012_06_29.PNG
mass_spectrum_2012_06_29.PNG