590
|
Tuesday, June 06, 2017, 09:22 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, June 06, 2017, 09:21: roughing.
Friday, June 09, 2017, 08:50:
Ion gauge off. Turbo pumps off. |
|
591
|
Wednesday, June 07, 2017, 12:49 |
Aaron Schmidt | | | | | | | | Gas bottles | Gas bottles for FEBIAD testing were
exchanged yesterday around 1:30. One Neon
& one Argon bottle were removed. |
|
593
|
Friday, June 16, 2017, 11:23 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo
pumps on |
|
600
|
Wednesday, July 19, 2017, 09:13 |
Aaron Schmidt | Ta Targets | | | | | | Done | Ion Peaks | Attached is a recent list of Ta targets
with their extracted ions peaks. |
|
601
|
Thursday, August 03, 2017, 17:00 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum system tripped on power interruption | Thursday, August 03, 2017, 17:00:
Restarted TPs |
|
603
|
Thursday, August 17, 2017, 12:45 |
Anders Mjos | | | | | | | Problems/Solutions | TBHT power supply removed | The Xantrex 10V 600 A power supply
for the TBHT has been moved to ITE to replace
the failed TGHT power supply |
|
604
|
Monday, August 21, 2017, 16:20 |
Anders Mjos | | | | | | | Problems/Solutions | TBHT power supply removed |
|
|
606
|
Monday, September 25, 2017, 14:10 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, September 25, 2017, 14:10: Roughing.
Wednesday, September 27,
2017, 08:23: Turbo pumps on |
|
608
|
Tuesday, October 10, 2017, 13:10 |
Aaron Schmidt | | | | | | | | Gas bottles | Tuesday, October 10, 2017, 09:30:
Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon |
|
609
|
Tuesday, October 10, 2017, 14:56 |
Aaron Schmidt | | | | | | | In progress | FEBIAD Anode bias configuration | Unable to hold Anode voltage after power
supply change out.
Tuesday, October 10, 2017, 14:55: |
|
611
|
Monday, October 16, 2017, 11:46 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber Test EE | Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05:
Turbo pumps started. |
|
612
|
Tuesday, October 24, 2017, 11:38 |
Anders Mjos | | | | | | | | FEBIAD coil magnetic field measurment | with Fernando
Tuesday, October 24, 2017: Testing
setup with triple coil |
|
613
|
Monday, October 30, 2017, 08:54 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP6 shut down due to high noise | The turbo pump will need replacement. |
|
614
|
Wednesday, November 15, 2017, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:TP6 replacement | Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55:
Turbo (TP2) off. Ion gauge off. |
|
616
|
Monday, December 04, 2017, 08:29 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage | Power outage over the weekend. Reboot PLC
and systems.
Monday, December 04, 2017, 08:22: |
|
619
|
Thursday, December 21, 2017, 15:12 |
Anders Mjos | | | | | | | | Powered down devices | Powered down vacuum gauge and turbo pump
controllers |
|
620
|
Tuesday, January 02, 2018, 09:18 |
Anders Mjos | | | | | | | Problems/Solutions | Starting system | Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started |
|
621
|
Monday, January 22, 2018, 09:04 |
Aaron Schmidt | | | | | | | Done | Power outage & Controller replacement. | Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. |
|
622
|
Friday, January 26, 2018, 11:10 |
Aaron Schmidt | | | | | | | Done | Helium tank replacement | Friday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank |
|
628
|
Monday, February 05, 2018, 09:17 |
Aaron Schmidt | | | | | | | Problems/Solutions | Epics loss | Monday, February 05, 2018, 09:10: the epics
program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC. |
|
|