493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.
|
Temperature measurements ended on Thursday, January 21, followed by cool down over night. |
|
496
|
Wednesday, March 02, 2016, 12:08 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator broken | The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.
Friday, March 04, 2016
Re-installed the TGHT terminal with new Keensert. |
|
498
|
Friday, March 11, 2016, 15:46 |
Anders Mjos | | | | | | | In progress | Testing end cap leak tightness | Two Ta-tubes sealed with 2 end caps each placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging
Monday, March 14, 2016, 09:43: Caps still on the tube. Vacuum on CG1 5 mT
Wednesday, March 16, 2016, 08:37: Venting |
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58: Roughing
Wednesday, March 16, 2016, 12:54: Started Turbo pumps
Wednesday, March 16, 2016, 13:02: Turbos at speed, Vacuum at 7.16E-06T
Thursday, March 17, 2016, 08:30: Opened water on heat shield circuit. Vacuum stable at 3.0E-07T. No response on RGA.
Thursday, March 17, 2016, 08:37: Auto-Ramping started. TGHT to 500A @ 2A/min. EE to 1500V.
Thursday, March 17, 2016, 15:40 @ 500A and 6.76E-07T
Friday, March 18, 2016, 08:35: Auto-cooling. Vacuum @5.87E-07T.
Friday, March 18, 2016, 14:13: Source off. Stopped turbo pumps.
Tuesday, March 29, 2016, 13:22: venting |
|
500
|
Tuesday, March 29, 2016, 14:44 |
Aaron Schmidt | | | | | | | | Pumping down empty chamber. | Tuesday, March 29, 2016, 14:43: Roughing.
Wednesday, March 30, 2016, 14:33: Venting -AM |
|
504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing of the target. |
|
505
|
Wednesday, April 20, 2016, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to negative |
Anders Mjos wrote: |
to test the effect of extraction when biasing of the target.
|
Testing finished. Switched back to negative polarity. |
|
511
|
Friday, June 03, 2016, 14:50 |
Aaron Schmidt | | | | | | | | Pumping down empty chamber. | Friday, June 03, 2016, 14:50: Turbo pumps started.
Friday, June 03, 2016, 15:22: RGA on.
Monday, June 06, 2016, 15:40: RGA still connected. OK. Screen shot saved. Vacuum @ 8.5E-07T
Wednesday, June 08, 2016, 15:26: RGA off
Wednesday, June 08, 2016, 15:29: Ion gauge off. Turbo pumps off.
Thursday, June 09, 2016, 12:44: Venting -AM |
|
513
|
Friday, June 10, 2016, 12:42 |
Anders Mjos | | | | | | | Problems/Solutions | FC0 BIAS probelm | Graham Waters is looking into this problem. The IOC has been rebooted a couple of times. |
|
516
|
Monday, June 20, 2016, 14:36 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Monday, June 20, 2016, 12:50: roughing down
Monday, June 20, 2016, 14:30: Turbo pumps on. Ion gauge on.
Monday, June 27, 2016, 09:00: Ion gauge off. Turbo pumps off. |
|
517
|
Friday, June 24, 2016, 08:07 |
Aaron Schmidt | | | | | | | | Emittance scanner check/repair. | Friday, June 24, 2016, 08:06: Ion gauge IG6 OFF. Turbo pumps TP6 and TP2 off.
Friday, June 24, 2016, 09:58: Venting.
Friday, June 24, 2016, 10:17: Remove emittance scanner for inspection.
Friday, June 24, 2016, 10:20: Roughing.
Disassemble, inspect.
Move bearing along screw. Acetone to break down old grease. Wiped clean. Move bearing back and forth, use pick to remove dirt. Re-grease.
Clean, and reassemble.
Test emittance scanner (outside of vacuum) . Draw in OK. Draw out OK.
Friday, June 24, 2016, 13:35: Venting.
Install emittance scanner.
Friday, June 24, 2016, 14:10: Roughing.
Test. Draws in fine. Draw out fails 3/4 of the way back up.
Friday, June 24, 2016, 14:32: Turbo pumps started.
Friday, June 24, 2016, 14:37: Ion gauge on.
Work to continue when more information is found on emittance scanner motor & history. |
|
519
|
Wednesday, June 29, 2016, 16:28 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Wednesday, June 29, 2016, 16:28 : Roughing
Thursday, June 30, 2016, 08:44: Turbo pumps on.
Thursday, July 07, 2016, 13:11: Turbo pumps off. Ion gauge off.
Monday, July 11, 2016, 12:50: Venting. ERROR on PuTTY.
Monday, July 11, 2016, 13:05: IOC WHITEOUT?
Monday, July 11, 2016, 13:25 All returned to normal. |
|
520
|
Wednesday, July 06, 2016, 10:42 |
Anders Mjos | | | | | | | Problems/Solutions | Emittance scanner check/repair. | Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter |
|
521
|
Monday, July 11, 2016, 13:51 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - NEW EE w/insulators | Monday, July 11, 2016, 13:49: Begin roughing.
10 µL: K & Rb added
5 µL: Cs added
Monday, July 11, 2016, 14:59 : Turbo pumps started.
Monday, July 11, 2016, 15:33 : Ion gauge on.
Tuesday, July 12, 2016, 08:13 : RGA on.
Tuesday, July 12, 2016, 08:18 : Water, power/sources on. Vacuum stable at 3.2E-7 T. No response on RGA.
Tuesday, July 12, 2016, 08:35: Auto-ramping TBHT only @ 1A/min to 110A. EZL/EE/BIAS to 13/1.5/30 kV.
Wednesday, July 13, 2016, 08:17: Reduced TBHT to 100 A -AM
Wednesday, July 13, 2016, 18:15: Auto-cool @ 1.5A/min
Thursday, July 14, 2016, 08:20: Sources/power off
Thursday, July 14, 2016, 08:27: RGA off, IV4 closed, Ion gauge off. Turbo pumps off. Water lines closed.
Thursday, July 14, 2016, 12:57: Venting
|
Attachment 1: Tube_only_test_-_with_insulators_&_new_EE_Maldonado_160712.zip
|
Attachment 2: 160713.zip
|
|
522
|
Thursday, July 14, 2016, 13:22 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - NEW EE w/insulators - No PE | Thursday, July 14, 2016, 14:41: Roughing started.
Thursday, July 14, 2016, 15:41: Turbo pumps started.
Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.
Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.
Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV
Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min
Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min
Friday, July 15, 2016, 11:21: IV4 opened
Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min
Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.
Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.
Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.
Monday, July 18, 2016, 11:25: Water purged. Power off/lockout. |
Attachment 1: Tube_only_Test_-__New_Insulators-No_PE-160715.zip
|
Attachment 2: 160716.zip
|
|
523
|
Monday, July 18, 2016, 12:20 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - No EE - No PE | Monday, July 18, 2016, 12:19: Roughing.
Monday, July 18, 2016, 13:13: Turbo pumps on.
Monday, July 18, 2016, 13:18: Ion gauge on.
Tuesday, July 19, 2016, 08:28: Power/Water on. No response on RGA. Vacuum stable @ 2.63E-7 T.
Tuesday, July 19, 2016, 08:43: Optics on. BIAS/EZL/EE on 30/13/0 kV. Auto-ramp TBHT to 110A @ 2 A/min.
Tuesday, July 19, 2016, 10:15: Auto-ramp TBHT to 130A @ 2 A/min.
Tuesday, July 19, 2016, 13:325: Auto-ramp down TBHT @ 2 A/min - AM
Tuesday, July 19, 2016, 13:36: Optics and BIAS / EZL / EE off -AM.
Tuesday, July 19, 2016, 14:28: Turbos off/Turbo vent.
Tuesday, July 19, 2016, 14:33: Venting.
|
Attachment 1: Tube_only_-_No_EE_-_No_PE.zip
|
|
524
|
Tuesday, July 19, 2016, 15:15 |
Aaron Schmidt | | | | | | 41751-7 | | Tube only - No EE - With PE | Tuesday, July 19, 2016, 15:14: Roughing.
Tuesday, July 19, 2016, 15:48: Turbo pumps started.
Tuesday, July 19, 2016, 15:55: Ion Gauge on.
Wednesday, July 20, 2016, 08:15: RGA On.
Wednesday, July 20, 2016, 08:25: Power/water on. No response on RGA. Vacuum stable @ 2.7E-7 T
Wednesday, July 20, 2016, 08:28: Sources on BIAS/EZL/EE @ 30/13/0 Kv
Wednesday, July 20, 2016, 08:31: Auto-ramping TBHT @ 2A/min.
Wednesday, July 20, 2016, 13:01: Auto-Cooling TBHT @ 3A/min.
Wednesday, July 20, 2016, 14:45: Sources off.
Wednesday, July 20, 2016, 14:47: RGA off. IV4 Closed.
Wednesday, July 20, 2016, 14:49: Turbos off.
Wednesday, July 20, 2016, 14:53: Power off. Water line purged.
Thursday, July 21, 2016, 07:52: Venting |
Attachment 1: Tube_only_-_No_EE_-_With_PE.zip
|
|
526
|
Thursday, July 28, 2016, 08:21 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:MB1 time out | Fault report submitted. 9156
Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller |
|
527
|
Thursday, July 28, 2016, 11:12 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Thursday, July 28, 2016, 10:00 Roughing. |
|
529
|
Monday, August 08, 2016, 09:48 |
Aaron Schmidt | | | | | 41882-4 | 41751-1 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-1 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.
Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.
Monday, August 08, 2016, 10:10: Roughing.
Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.
Monday, August 08, 2016, 10:40: Both Turbo pumps started.
Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.
Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T
Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 08:19: Power/sources on.
Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A
Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T
Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T
Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 10, 2016, 09:14: Venting. |
Attachment 1: HS_41751-1_TEST.docx
|
Attachment 2: TS-2016-08-08-11-45.rga
|
Attachment 3: 20160824_144103.jpg
|
|
Attachment 4: 20160824_144106.jpg
|
|
|