|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
 |
|
481
|
Wednesday, December 02, 2015, 14:50 |
Anders Mjos | | | | | | | Problems/Solutions | Nitrogen supply for venting temporarely from bottle | No supply of N through the piping due to
work on the N tanks. Confirmed with Geoff
Hodgson. ISIS supply is shut off. Using a |
|
|
482
|
Wednesday, December 02, 2015, 15:30 |
Anders Mjos | | LP-SIS | | | | | | New centre block test | New 2x 9-pin connector grounding tool with
gripper installed.
Wednesday, December 02, 2015, 15:30: |
|
|
483
|
Friday, December 18, 2015, 11:44 |
Anders Mjos | | | | | | | Problems/Solutions | IG6 not reading correctly | The new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This |
|
|
484
|
Wednesday, January 06, 2016, 09:28 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak fixed on flow sensor for HS circuit | The Swagelok fitting on the return
side of the flow sensor for the HS circuit
was tightened to stop the leak. See e-fault |
|
|
485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58: |
|
|
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today |
|
|
487
|
Monday, January 18, 2016, 15:38 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
488
|
Tuesday, January 19, 2016, 18:34 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
489
|
Wednesday, January 20, 2016, 14:26 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
490
|
Wednesday, January 20, 2016, 19:11 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
491
|
Thursday, January 21, 2016, 13:04 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07:
Stopped turbos |
|
|
493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
|
494
|
Friday, January 22, 2016, 15:34 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | In progress | EE coating test | Friday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14: |
|
|
495
|
Tuesday, February 23, 2016, 10:43 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | | EE coating test - no Plasma Electrode | Cleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40: |
|
|
496
|
Wednesday, March 02, 2016, 12:08 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator broken | The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with |
|
|
498
|
Friday, March 11, 2016, 15:46 |
Anders Mjos | | | | | | | In progress | Testing end cap leak tightness | Two Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging |
|
|
500
|
Tuesday, March 29, 2016, 14:44 |
Aaron Schmidt | | | | | | | | Pumping down empty chamber. | Tuesday, March 29, 2016, 14:43: Roughing.
Wednesday, March 30,
2016, 14:33: Venting -AM |
|
|
504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing
of the target. |
|
|
505
|
Wednesday, April 20, 2016, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to negative |
|
|