484
|
Wednesday, January 06, 2016, 09:28 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak fixed on flow sensor for HS circuit | The Swagelok fitting on the return side of the flow sensor for the HS circuit was tightened to stop the leak. See e-fault 8650 |
485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos stopped.
Monday, January 11, 2016, 12:58: Venting
Roughed down yesterday due to change of plans.
Tuesday, January 12, 2016, 09:58: Turbos started.
Thursday, January 14, 2016, 11:44: Turbos stopped. |
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today |
487
|
Monday, January 18, 2016, 15:38 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping. |
Attachment 1: 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png
|
|
488
|
Tuesday, January 19, 2016, 18:34 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway. |
489
|
Wednesday, January 20, 2016, 14:26 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A. |
490
|
Wednesday, January 20, 2016, 19:11 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF. |
491
|
Thursday, January 21, 2016, 13:04 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK. |
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07: Stopped turbos |
493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today
|
Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.
|
Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.
|
Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.
|
Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.
|
Temperature measurements ended on Thursday, January 21, followed by cool down over night. |
494
|
Friday, January 22, 2016, 15:34 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | In progress | EE coating test | Friday, January 22, 2016, 15:30: Turbos started
Friday, January 22, 2016, 16:14: RGA ON
Monday, January 25, 2016, 10:30: Opened water. No response on vacuum.
BIAS / EZL / EE to 30 / 15 / 1.5 kV
Started auto-ramping to 300 / 200 A at 2 A/min.
Monday, January 25, 2016, 15:34: Aborted auto-ramping and stepped down to 180 A on TGHT / TBHT to conserve salts. Vacuum at 1.2 E-6 T
Tuesday, January 26, 2016, 08:30: Continue auto-ramping.
Tuesday, January 26, 2016, 09:15: Tuning by Alex
Wednesday, January 27, 2016, 08:24: Increased good/bad vacuum to 4/6 E-6T
Wednesday, January 27, 2016, 08:58: Continue ramping to TGHt 400 A
Thursday, January 28, 2016, 13:28: Continue ramping to TGHT / TBHT 420 / 220 A
Monday, February 01, 2016, 08:31: Ramp down started
Monday, February 01, 2016, 10:40: Isolation valve closed
Monday, February 01, 2016, 10:42: RGA off.
Tuesday, February 23, 2016, 09:07 Monday, February 01, 2016, 16:35: BIAS / EZL / EE off. Stopped turbos.
Tuesday, February 02, 2016, 09:28: Venting through turbo pump (air).
Wednesday, February 03, 2016, 08:35: Roughing
Wednesday, February 03, 2016, 09:06: Starting TP1B only.
Wednesday, February 03, 2016, 09:17: Force on TSG:IG1 for high vacuum test
Wednesday, February 03, 2016, 09:27 : EE current limiting around 1500 V with IG1 at 4E-5 T. EE can no longer hold more than some hundred volts before current limiting.
Wednesday, February 03, 2016, 10:01: Stopped turbo. Will vent and inspect insulator.
Wednesday, February 03, 2016, 10:06: Force removed from IG1.
Wednesday, February 03, 2016, 12:11: Venting
TEST 2
Cleaned PE and EE with acetone.
Friday, February 05, 2016, 15:05: Roughing
Friday, February 05, 2016, 15:48: Turbos started.
Friday, February 05, 2016, 15:56 : Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, February 09, 2016, 08:55: Opened water to HS circuit. Vacuum stable at 6.2E-7 T. No response on RGA
Tuesday, February 09, 2016, 08:59: Started auto-ramping heaters.
Tuesday, February 09, 2016, 09:12: Opened IV4
Wednesday, February 10, 2016, 14:15: Increased voltage limit on TB HT
EE voltage limited over the weekend on Feb 14th. See attached.
Observed EE opening with telescope. Could not see any material buildup. Nice round shape visible.
Monday, February 15, 2016, 11:55: Starting ramp down of heaters.
Tuesday, February 16, 2016, 08:32: BIAS/EZL/EE off. Stopped turbos.
Tuesday, February 16, 2016, 08:37: RGA off.
Tuesday, February 23, 2016, 09:08: Venting |
Attachment 1: 2016-02-14_EE_V_limit.png
|
|
495
|
Tuesday, February 23, 2016, 10:43 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | | EE coating test - no Plasma Electrode | Cleaned up EE and around target tube. Removed PE
Tuesday, February 23, 2016, 10:40: Roughing
Tuesday, February 23, 2016, 11:09: Starting turbos
Tuesday, February 23, 2016, 11:47: Turbos at speed. Vacuum at 7.5E-6 T
Tuesday, February 23, 2016, 13:43: EE to 1500 V. 518 uA
Tuesday, February 23, 2016, 15:07: RGA on
Wednesday, February 24, 2016, 08:48: Opened cooling water supply for HS circuit. Vacuum stable at 3.6E-7 T. No response on RGA
Wednesday, February 24, 2016, 08:51: IV4 opened
Wednesday, February 24, 2016, 08:56: BIAS/EZL/EE to 30 / 13 / 1.5 kV. Started auto-ramping to 420 / 220 A at 2 A/min.
Tuesday, March 01, 2016, 06:30: EE went into current limiting.
Tuesday, March 01, 2016, 08:30: Lowered EE voltage to 200 V
Tuesday, March 01, 2016, 09:41: Started cool down of target.
Tuesday, March 01, 2016, 09:50: RGA off
Tuesday, March 01, 2016, 13:27: BIAS / EZL / EE off. Stopped turbo pumps
Wednesday, March 02, 2016, 08:20: Venting |
496
|
Wednesday, March 02, 2016, 12:08 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator broken | The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.
Friday, March 04, 2016
Re-installed the TGHT terminal with new Keensert. |
498
|
Friday, March 11, 2016, 15:46 |
Anders Mjos | | | | | | | In progress | Testing end cap leak tightness | Two Ta-tubes sealed with 2 end caps each placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging
Monday, March 14, 2016, 09:43: Caps still on the tube. Vacuum on CG1 5 mT
Wednesday, March 16, 2016, 08:37: Venting |
500
|
Tuesday, March 29, 2016, 14:44 |
Aaron Schmidt | | | | | | | | Pumping down empty chamber. | Tuesday, March 29, 2016, 14:43: Roughing.
Wednesday, March 30, 2016, 14:33: Venting -AM |
504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing of the target. |
505
|
Wednesday, April 20, 2016, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to negative |
Anders Mjos wrote: |
to test the effect of extraction when biasing of the target.
|
Testing finished. Switched back to negative polarity. |
507
|
Monday, May 02, 2016, 16:03 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test | Monday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos started -AM
Monday, May 02, 2016, 16:43: Turbos at speed. Vacuum at 1.6E-5 T - AM
Tuesday, May 03, 2016, 08:15: Opened water supply for heat shield. Vacuum stable at 2.5E-7 T. No response on RGA.
Tuesday, May 03, 2016, 08:33: Sources on
Tuesday, May 03, 2016, 08:37: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min
Tuesday, May 03, 2016, 08:44: Sources off Except TGHT/TBHT
Tuesday, May 03, 2016, 08:47:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
3.99 |
TBHT |
29.6 |
3.24 |
COIL + EE |
28.5 |
5.15 |
TGHT |
28.7 |
5.77 |
Tuesday, May 03, 2016, 12:42:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.17 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.8 |
5.78 |
Tuesday, May 03, 2016, 15:29;
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
30.4 |
3.26 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.0 |
5.77
|
Wednesday, May 04, 2016, 08:00:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.99 |
TBHT |
29.5 |
3.22 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.6 |
5.74
|
Wednesday, May 04, 2016, 12:53:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.19
|
COIL + EE |
28.7 |
5.19 |
TGHT |
29.6 |
5.72
|
Wednesday, May 04, 2016, 14:56: TSHWSW-1: 8 Psi , Gauge below: 106 Psi
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.8 |
3.19
|
COIL + EE |
28.8 |
5.21 |
TGHT |
29.8 |
5.80
|
Wednesday, May 04, 2016, 15:01: Begin auto-cooling @ 2A/min.
Thursday, May 05, 2016, 08:33: TBHT/TGHT off. Ion gauge off. Turbo pumps off.
Friday, May 06, 2016, 08:10: Water lines purged. Power supply off. Venting. |
Attachment 1: TS-2016-05-02_EE_insulator_test.rga
|
508
|
Friday, May 06, 2016, 10:18 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test (2) No PE | Friday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
Friday, May 06, 2016, 13:22: Started turbos
Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T
Monday, May 09, 2016, 09:07: Opened water supply for heat shield. Vacuum stable at 2.78E-7 T.
Monday, May 09, 2016, 09:16:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
30.8 |
3.33 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.7 |
5.80 |
Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Monday, May 09, 2016, 13:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
31.8 |
3.40
|
COIL + EE |
28.8 |
5.19 |
TGHT |
30.0 |
5.82 |
Tuesday, May 10, 2016, 08:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
30.3 |
3.27
|
COIL + EE |
28.8 |
5.19 |
TGHT |
29.8 |
5.77 |
Tuesday, May 10, 2016, 12:36:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.9 |
3.20
|
COIL + EE |
28.8 |
5.18 |
TGHT |
29.8 |
5.82 |
Tuesday, May 10, 2016, 15:21:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
29.4 |
3.15
|
COIL + EE |
28.8 |
5.16 |
TGHT |
30.0 |
5.73 |
Wednesday, May 11, 2016, 08:45:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.3 |
3.16
|
COIL + EE |
28.8 |
5.13 |
TGHT |
30.0 |
5.77 |
Wednesday, May 11, 2016, 14:13:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.6 |
3.16
|
COIL + EE |
29.0 |
5.19 |
TGHT |
30.0 |
5.78 |
Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM
Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.
Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.
Thursday, May 12, 2016, 11:32: Source off, lock on. |
509
|
Thursday, May 12, 2016, 13:32 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test, No PE , Dirty EE. | Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo Pumps started
Thursday, May 12, 2016, 13:46: Ion gauge switched on.
Friday, May 13, 2016, 08:33: Opened water supply for heat shield. Vacuum stable at 3.70E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
29.0 |
3.20 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.5 |
5.72 |
Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Friday, May 13, 2016, 13:55
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.95 |
TBHT |
29.8 |
3.16 |
COIL + EE |
29.0 |
5.17 |
TGHT |
30.0 |
5.72 |
Monday, May 16, 2016, 11:29:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
29.4 |
3.18 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.8 |
5.77 |
Monday, May 16, 2016, 15:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.20 |
COIL + EE |
29.1 |
5.21 |
TGHT |
30.1 |
5.77 |
Note: RGA misread.
Tuesday, May 17, 2016, 15:15:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
30.6 |
3.29 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.1 |
5.74 |
Note: RGA Misread.
Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open
Wednesday, May 18, 2016, 14:58: FC0 closed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.3 |
3.15 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.72 |
Thursday, May 19, 2016, 16:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.3 |
3.15 |
COIL + EE |
28.8 |
5.17 |
TGHT |
30.0 |
5.77 |
Friday, May 20, 2016, 14:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.6 |
3.20 |
COIL + EE |
28.8 |
5.14 |
TGHT |
30.0 |
5.79 |
Tuesday, May 24, 2016, 15:31:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.18 |
COIL + EE |
29.0 |
5.15 |
TGHT |
30.1 |
5.72 |
Thursday, May 26, 2016, 15:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.0 |
4.02 |
TBHT |
30.6 |
3.28 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.75 |
Friday, May 27, 2016, 15:27: IV4 Closed
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
32.2 |
3.42 |
COIL + EE |
28.7 |
5.22 |
TGHT |
29.7 |
5.77 |
Monday, May 30, 2016, 08:35:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.05 |
TBHT |
29.9 |
3.25 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.7 |
5.78 |
Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.
Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.
Wednesday, June 01, 2016, 09:10: Venting
Wednesday, June 01, 2016, 9:45: Water lines purged, power off. |
|