  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure highTSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced.
  
  439   Monday, May 04, 2015, 09:51 Anders Mjos      Problems/SolutionsFEBIAD Coil power supply replaced Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a 
  
  440   Friday, May 08, 2015, 09:07 Anders Mjos      Problems/SolutionsEPICS lost contact with the PLCEverything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has
  
  442   Tuesday, May 19, 2015, 19:10 Anders Mjos      Problems/SolutionsEPICS white out Likely caused by the PLC. e-fault
 8139

Wednesday, May 20, 2015
  
  443   Thursday, May 21, 2015, 16:40 Anders Mjos      Problems/SolutionsReconfigured service cap coil connections The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F ,
 TestStandSourceTray.jpgTM2SourceTray.jpg 
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate A gauge and a valve was installed
on the roughing line to the large turbo pump
  
  448   Wednesday, June 03, 2015, 09:35 Anders Mjos      Problems/SolutionsPLC upgradeWednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15:
  
  449   Monday, June 15, 2015, 14:07 Anders Mjos      Problems/SolutionsTest Stand Source Tray installedMonday, June 15, 2015
Remaining items to do

    ANODE wire not yet attached
 Coils_configuration.jpg 
  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed throughNo wires connected yet.
Monday, June 22, 2015, 15:48: Roughing

Tuesday, June 23, 2015, 09:05:
 9-pin_feed_through.jpg 
  453   Monday, June 29, 2015, 16:51 Friedhelm Ames      Problems/SolutionsTSG:BV1B closedfound TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again.
  
  455   Monday, July 06, 2015, 09:29 Anders Mjos      Problems/SolutionsReplaced out gassing gauge on the backing line    
  456   Monday, July 06, 2015, 14:26 Anders Mjos       Pumping down empty chamberMonday, July 06, 2015, 14:26: Roughing

Wednesday, July 08, 2015,
09:26: Venting
  
  458   Tuesday, August 04, 2015, 13:37 Anders Mjos      Problems/SolutionsEquipment for outgassing measurements removed    
  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage Saturday, August 29, 2015, 15:50:
Turbos started
  
  461   Wednesday, September 09, 2015, 08:54 Anders Mjos      In progressVenting Wednesday, September 09, 2015, 08:53:
Turbos stopped

Friday, September 11, 2015:
  
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33:
  
  465   Friday, September 18, 2015, 11:35 Anders Mjos      Problems/SolutionsTMS:TP6 nor workingfound in fault state this morning. Edi
consulted and fault report submitted.
  
  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange Friday, October 02, 2015, 08:35:
Turbo stopped
  
  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed outContacted Graham W. (controls) to have
a look. It turned out to be a limit switch
problem. Removed and reinstalled limit switch
  
  472   Wednesday, October 14, 2015, 16:13 Anders Mjos      Problems/SolutionsTMS:RP2 replaced by vacuum group. The pump was making
more noise than usual.
  