ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  414   Tuesday, December 16, 2014, 10:18 Anders Mjos      Problems/SolutionsTP1B and TP6 stopped/faultpossibly due to HV spark
Tuesday, December 16, 2014, 10:24:
Starting TP1B and TP6
  
  415   Thursday, December 18, 2014, 14:34 Anders Mjos      Problems/SolutionsGE cooling water lines disconnected In preparation for leak check
Thursday, December 18, 2014, 16:37:
Reconnected after leak check
  
  416   Thursday, December 18, 2014, 16:38 Anders Mjos      Problems/SolutionsLeak found on service cap F/T Q 9 pin connectorLargest response on the bottom of the insulator.
Thursday, December 18, 2014, 16:39:
Closing pumping valves. Will allow system
 Spark_marks_on_insulator.jpgSpark_marks_on_insulator2.jpg 
  417   Monday, December 22, 2014, 11:06 Anders Mjos      Problems/SolutionsCopper rod removedA copper rod - not used was removed from
one of the cooling lines.
  
  418   Tuesday, December 23, 2014, 09:08 Anders Mjos       Water closed for ChristmasShutting of water supply to the source
box. Water not needed.
  
  419   Monday, January 05, 2015, 09:06 Anders Mjos      Problems/SolutionsTSG:TP1A found to be timed out after the HollidaysVacuum at 1.7E-7 T
Corrected title from off to timed
out . It seems the controller lost contact
  
  420   Monday, January 05, 2015, 09:20 Anders Mjos      Problems/SolutionsIV4 did not get close signal before the HollidaysThe valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before
  
  421   Tuesday, January 20, 2015, 14:31 Anders Mjos      Problems/SolutionsNe leak disconnected for recallibrationSN 11-231 from VIC   
  422   Wednesday, January 21, 2015, 13:40 Anders Mjos      In progressHV BIAS TestWednesday, January 21, 2015, 13:34: Opened
water flow.
Wednesday, January 21, 2015, 13:42:
  
  423   Wednesday, January 28, 2015, 10:40 Anders Mjos      Problems/SolutionsTest Stand shut down for site wide power outage todayFriday, January 30, 2015, 10:50: Optics
section accidentally vented during work on
the ER
  
  424   Tuesday, February 03, 2015, 09:40 Anders Mjos      Problems/SolutionsRGA installationTuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF
port below the Source Tray.
 2015-02-04-1340.png 
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulatorAlso with newly installed RGA
Tuesday, February 03, 2015, 14:33:
Roughing
 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip 
  426   Tuesday, February 03, 2015, 16:10 Anders Mjos      Problems/SolutionsCurrent read back on TBHT has been corrected to 600 A By controls group   
  427   Friday, February 13, 2015, 13:59 Anders Mjos      Problems/SolutionsPLC failureThe PLC CPU came out of the socket around
11:50am today (Dave Morris). The CPU had
not been properly attached. This resulted
  
  428   Tuesday, February 17, 2015, 14:41 Anders Mjos      In progressPumping down empty chamberTuesday, February 17, 2015, 14:35: Roughing.
Doors were difficult to get to seal.
Tuesday, February 17, 2015, 15:11:
  
  429   Wednesday, February 18, 2015, 13:32 Anders Mjos      Problems/SolutionsSwitched off system in preparation for power outageThursday, February 19, 2015, 12:14: Starting
system again after the power outage
Thursday, February 19, 2015, 13:27:
  
  430   Thursday, February 26, 2015, 10:11 Anders Mjos      In progressInstalling FEBIAD test target for emittance rig testsThursday, February 26, 2015, 10:11: Stopped
turbos
Thursday, February 26, 2015, 11:23:
 ER_Test_w_FEBIAD.docxFebiadTS.xls 
  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamberRoughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos
started
  
  433   Thursday, April 02, 2015, 15:42 Anders MjosTM2 Test TargetLP-FEBIAD TM2 39230-1DoneTM2 Test Target ConditioningThursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12:
Turbos started
 TM2_FEBIAD_Test_Target.docxER_Scans.zip 
  434   Thursday, April 09, 2015, 11:21 Anders Mjos      Problems/SolutionsNo RGA communcationsRGA stopped working. Likely after a spark
yesterday.
  