Entry  Tuesday, December 16, 2014, 10:18, Anders Mjos, , , , , , , Problems/Solutions, TP1B and TP6 stopped/fault 

possibly due to HV spark

Tuesday, December 16, 2014, 10:24: Starting TP1B and TP6

Tuesday, December 16, 2014, 10:26: Both turbos at speed. Power 15 W and 17 W.

Tuesday, December 16, 2014, 11:37: Happened again. Restarted.

Entry  Thursday, December 18, 2014, 14:34, Anders Mjos, , , , , , , Problems/Solutions, GE cooling water lines disconnected 

 In preparation for leak check

Thursday, December 18, 2014, 16:37: Reconnected after leak check

Monday, December 22, 2014, 11:02: Water opened.

Entry  Thursday, December 18, 2014, 16:38, Anders Mjos, , , , , , , Problems/Solutions, Leak found on service cap F/T Q 9 pin connector Spark_marks_on_insulator.jpgSpark_marks_on_insulator2.jpg

Largest response on the bottom of the insulator.

Thursday, December 18, 2014, 16:39: Closing pumping valves. Will allow system to leak up over night


Friday, December 19, 2014, 08:19: Venting

Friday, December 19, 2014, 11:55: F/T and insulator removed. Lid not yet installed. Spark marks found on the insulator (see attached photo).


Installed blank off on F/T Q. New o-ring (1-1/02235) and screws 10-24x0.50 (1-2/02526). F/T insulator reference ITA0439

Monday, December 22, 2014, 09:54: Roughing

Monday, December 22, 2014, 10:25 : 0.5 T at CG1

Monday, December 22, 2014, 11:00: No leak detected at 0.2 T

Monday, December 22, 2014, 11:01: Starting turbos

Monday, December 22, 2014, 11:02: Opened water flow on GE (and TP1B)

Monday, December 22, 2014, 11:03: Some noise from TP1B around 12 kRPM

Monday, December 22, 2014, 11:07: TP1B at speed

Monday, December 22, 2014, 11:10: TP1A timed out restarted. Bypass BV1A required.

Monday, December 22, 2014, 11:11: Turbos at speed.

Monday, December 22, 2014, 11:11: Vacuum at 2.6 E-5 T


Tuesday, December 23, 2014, 08:27 : Vacuum at 1.8E-6 T

Tuesday, December 23, 2014, 08:51: Opened water. Vacuum stable at 1.7E-6 T

Tuesday, December 23, 2014, 09:05: No leaks found with leak detector. Base leak rate <7.7E-8 mbar-l / s


Monday, January 05, 2015, 09:28: Repeated leak check. Both doors. Sprayed He through service cap cover. No response above 2.4E-8 mbar-l/s base leak rate.

Entry  Monday, December 22, 2014, 11:06, Anders Mjos, , , , , , , Problems/Solutions, Copper rod removed 

A copper rod - not used was removed from one of the cooling lines.

Entry  Tuesday, December 23, 2014, 09:08, Anders Mjos, , , , , , , , Water closed for Christmas 

Shutting of water supply to the source box. Water not needed.

Entry  Monday, January 05, 2015, 09:06, Anders Mjos, , , , , , , Problems/Solutions, TSG:TP1A found to be timed out after the Hollidays 

Vacuum at 1.7E-7 T

Corrected title from off to timed out . It seems the controller lost contact with the pump when I touched the rack. The pump recovered right back to 38 kRPM upon restart.

 

Entry  Monday, January 05, 2015, 09:20, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not get close signal before the Hollidays 

The valve closes physically, but does not receive the closed signal.

Cycled the valve multiple times before finally showing closed state.

Entry  Tuesday, January 20, 2015, 14:31, Anders Mjos, , , , , , , Problems/Solutions, Ne leak disconnected for recallibration 

SN 11-231 from VIC

Entry  Wednesday, January 21, 2015, 13:40, Anders Mjos, , , , , , , In progress, HV BIAS Test 

Wednesday, January 21, 2015, 13:34: Opened water flow.

Wednesday, January 21, 2015, 13:42: 30 / 15 kV (BIAS / EZL)

Wednesday, January 21, 2015, 13:4: 40 / 20 kV

Wednesday, January 21, 2015, 13:54: No sparks.

Wednesday, January 21, 2015, 13:56: 50 / 25 kV

Wednesday, January 21, 2015, 14:0: No sparks

Wednesday, January 21, 2015, 14:11: 55 / 30 kV

Wednesday, January 21, 2015, 14:45: No sparks

Wednesday, January 21, 2015, 14:47: 60 / 30 kV and  37 / 122 uA

Wednesday, January 21, 2015, 16:00: No sparks.

Wednesday, January 21, 2015, 16:02: PS off.


Thursday, January 22, 2015, 10:18 : Started TBHT heating

Thursday, January 22, 2015, 10:26: Opened isolation valve


Friday, January 23, 2015, 09:45: 30 / 15 kV

ANODE 200 V
COIL 0 A
EE -1400

Friday, January 23, 2015, 09:46: TBHT auto heating to 280 A (235)

Friday, January 23, 2015, 10:05
COIL 5.4 A 4.9 V

 Friday, January 23, 2015, 10:13: 40 / 17 kV

Coil voltage limited. Reduced to 0 A - minimal impact on FC0 current.

Friday, January 23, 2015, 10:24: 50 / 22 kV

Friday, January 23, 2015, 10:42: 60 / 26 kV

Friday, January 23, 2015, 11:45: Sparking activity. Seen and heard by people in the area.

Friday, January 23, 2015, 12:00: Reduced current limit on BIAS PS to 0.10 (on the pot)

Friday, January 23, 2015, 12:04: A couple more sparks.

Friday, January 23, 2015, 12:05: Anode current limited since shortly after the large spark at 11:45

Friday, January 23, 2015, 12:11: 50 / 23 kV

Friday, January 23, 2015, 12:48 : Restarted turbos after the spark. TP1B and TP6

Friday, January 23, 2015, 13:16: 55 / 25 kV

Friday, January 23, 2015, 14:44: ~ 5 sparks / hour for the last 60 min

Friday, January 23, 2015, 15:49 : No sparks for the last 60 min. Cooling target.

Friday, January 23, 2015, 16:14: Source and HV off.


Monday, January 26, 2015, 11:15: TBHT at 235A set point


Tuesday, January 27, 2015, 10:13: Source on

Tuesday, January 27, 2015, 10:13: 30 / 15 kV

Tuesday, January 27, 2015, 10:59: COIL to 3.5 A

Tuesday, January 27, 2015, 11:15: 40 / 20 kV

Tuesday, January 27, 2015, 13:17: 50 / 23 kV

Tuesday, January 27, 2015, 16:56: No sparks for the last 3 h. 1 spark earlier.

Tuesday, January 27, 2015, 16:59 30 / 14 kV

Tuesday, January 27, 2015, 17:02: Cooling down target. Source and HV off.

Entry  Wednesday, January 28, 2015, 10:40, Anders Mjos, , , , , , , Problems/Solutions, Test Stand shut down for site wide power outage today 

Friday, January 30, 2015, 10:50: Optics section accidentally vented during work on the ER


Monday, February 02, 2015, 13:24: Roughing TMS section

Monday, February 02, 2015, 13:39: Starting turbos

Monday, February 02, 2015, 13:45: Turbos at speed

Monday, February 02, 2015, 13:49: Vacuum at 5.7 E-5 T


Tuesday, February 03, 2015, 09:00: Vacuum low 1E-6 T. Backing pressure high ~ 75 mT. Caused by TP6.

Tuesday, February 03, 2015, 09:01: Turbos stopped to investigate vent screw on TP6.

Tuesday, February 03, 2015, 09:40: Venting through TP6

Gasket on the TP6 venting screw had fallen off. Re-installed.

Tuesday, February 03, 2015, 09:57: Roughing

Tuesday, February 03, 2015, 10:32: Started turbos

Tuesday, February 03, 2015, 10:45: Turbos at speed. Vacuum at 1.3E-5 T

Entry  Tuesday, February 03, 2015, 09:40, Anders Mjos, , , , , , , Problems/Solutions, RGA installation 2015-02-04-1340.png

Tuesday, February 03, 2015, 09:40: Venting

RGA installed on the 12" CF port below the Source Tray.


Wednesday, February 04, 2015, 13:45: RGA turned on and mass scan performed.

Entry  Tuesday, February 03, 2015, 14:33, Anders Mjos, Empty, LP-SIS, , , , , In progress, Target with new center block and new EE insulator 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip

Also with newly installed RGA

Tuesday, February 03, 2015, 14:33: Roughing

Tuesday, February 03, 2015, 15:05: Turbos started

 Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T


Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)


Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min

Thursday, February 05, 2015, 09:02: Opened IV4

Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS

Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV

Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V

Thursday, February 05, 2015, 13:53: Continue to 580 A

Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again

Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT


Friday, February 06, 2015, 10:34: Heating TBHT to 220 A

Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A

Friday, February 06, 2015, 11:50: Cooling down target

Friday, February 06, 2015, 11:56: RGA  off

Friday, February 06, 2015, 11:5: BIAS/EZL/EE off


Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on


Monday, February 16, 2015, 08:46: BIAS/EZL/EE on

Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on

Monday, February 16, 2015, 10:10: Opened isolation valve

Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V

Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C

Monday, February 16, 2015, 15:50: Starting cool down


Tuesday, February 17, 2015, 08:30: RGA off

Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.

Tuesday, February 17, 2015, 08:34: Turbos off

Tuesday, February 17, 2015, 13:58: Venting

Entry  Tuesday, February 03, 2015, 16:10, Anders Mjos, , , , , , , Problems/Solutions, Current read back on TBHT has been corrected to 600 A 

 By controls group

Entry  Friday, February 13, 2015, 13:59, Anders Mjos, , , , , , , Problems/Solutions, PLC failure 

The PLC CPU came out of the socket around 11:50am today (Dave Morris). The CPU had not been properly attached. This resulted in full stop of all power supplies and vacuum pumps.

Restarted vacuum pumps at 12:10pm (20 min later).

Entry  Tuesday, February 17, 2015, 14:41, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 

Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.

Tuesday, February 17, 2015, 15:11: Started turbos

Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T

Entry  Wednesday, February 18, 2015, 13:32, Anders Mjos, , , , , , , Problems/Solutions, Switched off system in preparation for power outage 

Thursday, February 19, 2015, 12:14: Starting system again after the power outage

Thursday, February 19, 2015, 13:27: The performance of RP1 has degraded. Edi flushed some air through, which helped a bit. It now takes longer to start up.

Thursday, February 19, 2015, 13:33: Vacuum recovered.

Entry  Thursday, February 26, 2015, 10:11, Anders Mjos, , , , , , , In progress, Installing FEBIAD test target for emittance rig tests ER_Test_w_FEBIAD.docxFebiadTS.xls

Thursday, February 26, 2015, 10:11: Stopped turbos

Thursday, February 26, 2015, 11:23: Venting

Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later

Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.

Thursday, February 26, 2015, 16:23: Started turbos

Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T


Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T

Friday, February 27, 2015, 09:30: RGA on

Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min

Friday, February 27, 2015, 16:38: Source off


Monday, March 02, 2015, 14:00: Gas lines purged. Opening.

Fixed a air leak on one of the Swagelok joints.

Monday, March 02, 2015, 14:47: RGA with Ne Open

Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T

Mass 18 1.6E-7 T


Tuesday, March 03, 2015, 09:58: Started heating

Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.


Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.

Emittance vs EE voltage studied


Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)

Thursday, March 05, 2015, 15:12: The following devices were found off

TMS:Q6
TMSQ1
TPS:CBC


Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.

Friday, March 06, 2015, 10:51 : Ramping down source

Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.

Graham will be doing some controls work


Monday, March 09, 2015, 09:16: Ramping up the source. IV opened

Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.

Monday, March 09, 2015, 16:51: Opened Ne leak


Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.


Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet


Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.


Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.

Monday, March 16, 2015, 09:14: Bias off. Stopping turbos

Monday, March 16, 2015, 15:26: Venting

Entry  Tuesday, March 24, 2015, 09:50, Anders Mjos, , , , , , , In progress, Empty chamber 

Roughed down on Friday 20th

Tuesday, March 24, 2015, 09:49: Turbos started

Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T


EPICS could not communicate with devices. Contacted controls (Dave M)

Thursday, April 02, 2015, 14:45: Stopped turbos.

Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)

Thursday, April 02, 2015, 15:12: Venting through VV1

Entry  Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning TM2_FEBIAD_Test_Target.docxER_Scans.zip

Thursday, April 02, 2015, 15:42: Roughing

Thursday, April 02, 2015, 16:12: Turbos started

Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T


Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T

Tuesday, April 07, 2015, 08:25: Pumping on gas lines.

Tuesday, April 07, 2015, 08:37: Finished pumping.

Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber

Tuesday, April 07, 2015, 08:42: RGA filament on.

Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV

Tuesday, April 07, 2015, 08:55: COIL to 50 A,  ANODE to 200 V

Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min

Tuesday, April 07, 2015, 13:25 : Opened IV4

Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A


Wednesday, April 08, 2015, 09:27: Opening for Ne gas

Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV

Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV

Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV


Thursday, April 09, 2015, 11:19: Starting target cool down

Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV

Thursday, April 09, 2015, 17:58: BIAS and source off.


Friday, April 10, 2015, 08:21: Closed gas supply

Friday, April 10, 2015, 08:23: Stopped turbos

Entry  Thursday, April 09, 2015, 11:21, Anders Mjos, , , , , , , Problems/Solutions, No RGA communcations 

RGA stopped working. Likely after a spark yesterday.