Entry  Monday, July 06, 2015, 14:26, Anders Mjos, , , , , , , , Pumping down empty chamber 
Monday, July 06, 2015, 14:26: Roughing

Wednesday, July 08, 2015, 09:26: Venting

Thursday, July 09, 2015, 11:42: Roughing
Entry  Monday, July 13, 2015, 17:19, Anders Mjos, , LP-SIS, , , , , In progress, SIS Cup insulator clamping test 
Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos started
Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T
Entry  Tuesday, August 04, 2015, 13:37, Anders Mjos, , , , , , , Problems/Solutions, Equipment for outgassing measurements removed 
 
Entry  Monday, August 10, 2015, 18:01, Anders Mjos, , LP-SIS, , , , , In progress, Testing new center block target 
Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
Entry  Saturday, August 29, 2015, 14:33, Anders Mjos, , , , , , , Problems/Solutions, Restarted IOC after power outage 
 Saturday, August 29, 2015, 15:50: Turbos started
Entry  Wednesday, September 09, 2015, 08:54, Anders Mjos, , , , , , , In progress, Venting 
 Wednesday, September 09, 2015, 08:53: Turbos stopped

Friday, September 11, 2015: Vented
Entry  Monday, September 14, 2015, 08:38, Anders Mjos, , , , , , , Problems/Solutions, RP2 increased pressure 
 e-fault submitted and vacuum group (Edi) notified.
Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group
Entry  Friday, September 18, 2015, 11:35, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 nor working 
found in fault state this morning. Edi consulted and fault report submitted.
Entry  Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange 
 Friday, October 02, 2015, 08:35: Turbo stopped
Entry  Tuesday, October 13, 2015, 16:04, Anders Mjos, , , , , , , Problems/Solutions, IV4 timed out 
Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.
Entry  Wednesday, October 14, 2015, 16:13, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 replaced 
 by vacuum group. The pump was making more noise than usual.
Entry  Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed Photo_2015-10-16_11_57_45_AM.jpgPhoto_2015-10-16_11_57_51_AM.jpg
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged).
Entry  Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead 
Will went chamber to replace the filament.
See e-fault 8501 
Monday, October 19, 2015, 09:43: turbos stopped
    Reply  Monday, October 19, 2015, 15:39, Anders Mjos, , , , , , , Problems/Solutions, Exhaust came off the new RP2 


    
        
            Anders Mjos wrote:
        
        
            
             by vacuum group. The pump was making more noise than usual.
Entry  Monday, November 02, 2015, 12:47, Anders Mjos, , , , , , , Problems/Solutions, Removed Swagelok T from rioght TGHT water lines 
Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Entry  Monday, November 16, 2015, 14:52, Anders Mjos, , , , , , , In progress, Current measurement 2015-11-17_High_Current_Test.png2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx
Installed Cu-shunts on TGHT and TBHT terminals. HS water looped.
 Monday, November 16, 2015, 14:43: Roughing
Monday, November 16, 2015, 15:21: Turbos started.
Entry  Tuesday, November 17, 2015, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Ran RP2 with gas ballast for 15 min 2015-11-17_RP2_performance.png
To recover performance
Entry  Wednesday, December 02, 2015, 14:50, Anders Mjos, , , , , , , Problems/Solutions, Nitrogen supply for venting temporarely from bottle 
No supply of N through the piping due to work on the N tanks. Confirmed with Geoff Hodgson. ISIS supply is shut off. Using a bottle until the supply
is returned.

Monday, January 11, 2016
Entry  Wednesday, December 02, 2015, 15:30, Anders Mjos, , LP-SIS, , , , , , New centre block test 
New 2x 9-pin connector grounding tool with gripper installed.
Wednesday, December 02, 2015, 15:30: Roughing
Wednesday, December 02, 2015, 17:14: Starting turbos
Entry  Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly 
The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between
values in EPICS and the value displayed on the controller. An e-fault has been submitted.
Friday, December 18, 2015, 14:40: EPICS updated and restarted.